Retention of an Engineering Firm

[29 Pa.B. 2835]

Replacement of Bridge Nos. EB-731 at Milepost 319.19 and EB-732 at Milepost 319.33 Montgomery County

Reference No. 4-051

   The Turnpike Commission (Commission) will retain an engineering firm for the replacement design of Bridge Nos. EB-731 and EB-732 at Mileposts 319.19 and 319.33, respectively, in Montgomery County. Bridge No. EB-731 carries the Turnpike over SR 1003 and a Conrail Railroad Line, and Bridge No. EB-732 carries the Turnpike over SR 29 (Charlestown Road). Also included with this project is the elimination of a mainline culvert EB-732A at Milepost 319.34 that carries the Turnpike over a pedestrian underpass. The selected firm will be responsible for the pre-final and final design of this project.

   The engineering services required include supplemental field surveys, cross sections, evaluation of utility conflicts and potential relocations, development of erosion and sedimentation control plans, preliminary and final traffic control plans, preparation of Type, Size and Location plans and final bridge plans, geotechnical investigations and structural foundation reports, preparation of preliminary and final right-of-way plans, preparation of preliminary and final construction plans and specifications, in order for the Commission to let one construction contract. The intent is to widen the bridges to provide a minimum of two 12-foot travel lanes and a 12-foot shoulder in each direction and a 10-foot median.

   Direct inquiries to Gary L. Graham, P.E., at 939-9551, extension 5990; or by e-mail at ggraham@paturnpike.com.

   The following factors will be considered by the Commission during the evaluation of the firms submitting Letters of Interest for this project:

   a.  Specialized experience and technical competence of prime consultant and subconsultants. The Team must clearly demonstrate an ability to analyze available data to make decisions and develop plans to complete the project in a timely and cost effective manner.

   b.  Past record of performance with respect to cost control, work quality, ability to meet schedules and previous experience on similar projects. The consultant should identify similar projects that have been completed by that firm as the prime, the magnitude of the project, and the client.

   c.  The specific experience and number of individuals who constitute the firm.

   d.  Location of consultant's office where the work will be performed.

   e.  Workload of the prime consultant and subconsultants for all Department of Transportation (Department) and Commission projects.

   f.  Other factors, if any, specific to the project.

General Requirements and Information

   Firms interested in providing the above work and services are invited to submit a Letter of Interest with the required information. The Letters of Interest must include the following:

   1.  One page transmittal letter clearly identifying the project reference number, brief description of the project from the advertisement, the firm's Federal identification number, the firm's legal name, contact person or project manager, address of corporate office and project office. (If the firm has multiple offices, the location of the office performing the work must be identified)

   2.  Three page expression of interest in the advertised project. Each firm should demonstrate their ability to perform the specific requirements indicated for this project and provide explanation that the firm has successfully completed similar type projects of the same magnitude.

   3.  An organization chart for the Project, identifying key personnel and any subconsultants and their roles. Any deviation from the subconsultant's listed in the letter of interest will require written approval from the Commission.

   4.  Tabulation of workload for the prime consultant and all subconsultants for all Department and Commission projects.

   5.  Annual Qualification Package submitted to the Department for the current year, containing the following for the prime consultant and all subconsultants which should be attached to the back of the letter of interest (subs to follow primes):

   *  Standard Form (SF) 254--Architect-Engineer and Related Services Questionnaire in is entirety, not more than 1 year old as of the date of the advertisement.

   *  Resumes of key personnel expected to be involved in the project. (limit to one 8 1/2 x 11 page, one side, per person). Only resumes of key personnel should be included.

   *  Copy of the firm's registration to do business in this Commonwealth as provided by the Department of State for firms with out-of-State headquarters or corporations not incorporated in Pennsylvania.

   *  A copy of the Department's DBE/WBE Certification, if applicable.

   If a Joint Venture responds to a project advertisement, the Commission will not accept separate letters of interest from joint venture constituents. A firm will not be permitted to submit a letter of interest on more than one joint venture for the same project reference number. Also, a firm that responds to a project as a prime may not be included as a designated subconsultant to another firm that responds to the same project advertisement. This does not preclude a firm from being set forth as a designated subconsultant to more than one prime consultant responding to the project advertisement.

   Firms interested in performing the above services are invited to submit a letter of interest and required information to Barry L. Troup, P.E., Assistant Chief Engineer for Design, at the Turnpike Commission Administration Building located on Eisenhower Boulevard at the Harrisburg-East Interchange (No. 19). (FedEx address: Route 283 and Eisenhower Boulevard, Highspire, PA 17034) (Mailing Address: P. O. Box 67676, Harrisburg, PA 17106-7676).

   The letter of interest and required information must be received by 12 p.m. (noon), Friday, June 18, 1999. Anyletters of interest received after this date and time will be time-stamped and returned.

   Based on an evaluation of acceptable letters of interest received in response to this solicitation, one firm will be selected for this project. The order of preference will be established for the purpose of negotiating an agreement with the highest ranked firm established by the Technical Review Committee and approved by the Selection Committee. Technical Proposals or Requests for Proposals will not be requested prior to selection.

   The Commission reserves the right to reject all letters of interest, to cancel solicitation requested under this notice, and/or to re-advertise solicitation for the work and services.

JAMES F. MALONE, III,   
Chairperson

[Pa.B. Doc. No. 99-886. Filed for public inspection May 28, 1999, 9:00 a.m.]