NOTICES
DEPARTMENT OF TRANSPORTATION
Retention of Engineering Firms
[28 Pa.B. 2548]
Berks, Carbon, Lehigh, Monroe, Northampton and Schuylkill Counties
Project Reference No. 08430AG2200The Department of Transportation will retain three (3) separate engineering firms for three (3) separate Open-End Contracts for various engineering and/or environmental services on various projects located in Engineering District 5-0, that is Berks, Carbon, Lehigh, Monroe, Northampton and Schuylkill Counties. Each Contract will be for a sixty (60) month period with projects assigned on an as-needed basis. The maximum amount of each Open-End Contract will be $1.0 million. The major emphasis will be on highway final design work.
The Department will establish an order of ranking of a minimum of seven (7) firms for the purpose of negotiating the Open-End Contracts based on the Department's evaluation of the letters of interest received in response to this solicitation. The ranking will be established directly from the letters of interest. Technical proposals will not be requested prior to the establishment of the ranking.
The following factors, listed in order of importance, will be considered by the Department during the evaluation of the firms submitting letters of interest:
a. Ability to package and present the Letter of Interest in accordance with the ''General Requirements and Information'' section.
b. Past record of performance (timeliness, responsiveness, quality, cost control, and ability to meet schedules.
c. Diversity of experience and technical competence.
d. Location of consultant in respect to the District.
e. Relative size of firm to size of potential assignments that may be completed under these contracts.
The work and services required under these Contracts may encompass a wide range of environmental studies and engineering efforts with the possibility of several different types of projects with short completion schedules being assigned concurrently. The anticipated types of projects include, but not limited to, bridge replacements or bridge rehabilitation with minor approach work, environmental studies, roadway betterments (3R type,) minor capital improvement projects (bridges or roadway), railroad grade crossing projects, and minor location studies, etc.
The engineering work and services which may be required under these Contracts include, but are not limited to, perform field surveys; plot topography and cross sections; prepare submission for utility verification and relocations engineering; prepare all pertinent submissions and materials necessary for the Department to prepare the application to PUC and for the PUC field conference; attend and supply any required information for all PUC meetings and hearings during the design of the project; develop erosion control details and narrative; prepare right of way plans; complete structure designs including type, size and location reports, core boring layouts and foundation designs and reports; develop traffic control plans with narratives; conduct soils investigations and prepare soils reports; investigate utility involvement on projects; provide material for and participate in value engineering reviews; coordinate contacts with railroad officials and procure railroad related costs, permits, and insurance; collect signal timing, accident data and other traffic flow data; document engineering study findings and activities; alternative analysis to assess impacts and mitigation; prepare roadway plans for in-house bridge designs and prepare construction plans, specifications, and estimates.
The areas of environmental study required under these Contracts may include, but are not limited to: air quality; noise; energy; vibration; hazardous waste; surface water and ground water quality; surface water and ground water hydrology; terrestrial ecology including threatened and endangered species; wetlands; soils; geology; farmlands; visual quality; socio-economic resources; cultural resources; Section 4(f) Evaluations; early coordination and; scoping correspondence; meeting minutes; public meeting and hearing presentations; visualization materials, handouts and displays; technical basis reports (TBRs) and/or technical files; NEPA environmental documents; Section 106 documents; mitigation plans and reports; wetland and floodplain findings; and preliminary engineering plans, and remote sensing/mapping innovations. The format and content of all documents will be consistent with applicable State and Federal regulations, policies and guidelines.
The engineering services and environmental studies identified above are the general work activities that can be expected under these Open-End Contracts. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under these Open-End Contracts.
The second copy of the letter of interest and required forms (see ''General Requirements and Information'' section) shall be sent to: Mr. Walter E. Bortree, P.E., District Engineer, District 5-0, 1713 Lehigh Street, Allentown, PA 18103.
Any technical questions concerning the requirements for this project should be directed to: Mr. Donald E. Lerch, P.E., District 5-0, at (610) 791-6019.
Any questions concerning the submittal of the letter of interest for this Open-End Contract can be directed to the Consultant Agreement Division at (717) 783-9309.
Westmoreland, Butler, Armstrong and Allegheny Counties
Project Reference No. 08430AG2201The Department of Transportation will retain an engineering firm, for a multi-phase, specific project Agreement, to perform preliminary engineering and environmental studies; final design and services during construction (shop drawing review, construction consultation, plans recordation and project management) for S.R. 0356, Section 06M, the rehabilitation of the Freeport Bridge carrying S.R. 0356 over the Allegheny River, ConRail tracks, Township Road 784, State Route 2019 and Buffalo Creek in Westmoreland, Butler, Armstrong and Allegheny Counties. The design of this project is expected to have an overall duration of approximately thirty-six (36) months with shorter, varying schedules for individual phases. This Agreement will be administered by Engineering District 12-0. The estimated construction cost of the project is $20.0 million.
The selected engineering firm will be required to provide a variety of engineering services including the following: environmental studies for environmental document preparation and public involvement; preliminary engineering studies involving field survey, utility contacts, H&H studies, joint permit preparation; line, grade and typical section development; type, size and location submissions; geologic studies; erosion and sedimentation control plans and narratives; hydraulic computations; safety reviews; and Step 9 submission final design activities including drainage and highway lighting design, right-of-way and traffic control plans, foundation submissions, structure designs and plan preparation, various field and office meetings, and plans, specifications, and estimate preparation; and services during construction including shop drawing review, construction consultation, plans recordation and project management.
The Department is seeking a moderate to large, multi-disciplined engineering firm with multi-span bridge design capability.
The following factors listed in order of importance, will be considered by the Department during evaluation of the firms submitting acceptable Letters of Interest:
a. Ability to package and present the Letter of Interest in accordance with the ''General Requirements and Information'' section of the Pennsylvania Bulletin.
b. Specialized experience and technical competence.
c. Project team composition.
d. Project team experience.
e. Ability to expedite project and maintain schedule and budget.
f. Past Performance.
g. Current Workload.
h. Location of Consultant.
The District will announce the shortlisted firms at an open public meeting to be held in Engineering District 12-0, North Gallatin Avenue Extension, P. O. Box 459, Uniontown, Pennsylvania 15401. All candidates that have submitted a letter of interest will be notified of the date. Specify a contact person in the letter of interest submission.
The goal for Disadvantaged Business Enterprise (DBE) participation in this Agreement shall be fifteen (15%) percent of the total contract price. Additional information concerning DBE participation in this Agreement is contained in the General Requirements and Information section after the advertised project(s).
The District's copy of the Letter of Interest and required forms (see general requirements and information section) shall be sent to: Mr. Michael H. Dufalla, P.E., District Engineer, Engineering District 12-0, P. O. Box 459, North Gallatin Avenue Ext., Uniontown, PA 15401.
Any technical questions concerning the requirements for this project should be directed to: Mr. Jerry Bendo, Engineering District 5-0, at (724) 439-7377.
Any questions concerning the submittal of the letter of interest can be directed to the Consultant Agreement Division at (717) 783-9309.
General Requirements and Information Firms interested in providing the above work and services are invited to submit two copies of a Letter of Interest are required information for each Project Reference Number for which the applicant wishes to be considered.
The first copy of the Letter of Interest and required information must be submitted to: Mr. Charles W. Allwein, P.E., Chief, Consultant Selection Committee, 7th Floor, Forum Place, 555 Walnut Street, P. O. Box 3060, Harrisburg, Pennsylvania 17105-3060. Note: The Zip Code for express Mailing is 17101-1900.
The Letter of Interest and required information must be received within twenty (20) calendar days of this Notice. The Deadline for receipt of a Letter of Interest at the above address is 4:30 p.m. prevailing time of the twentieth day.
The second copy of the letter of interest and required information must be submitted to the appropriate District Engineer/Administrator or the Bureau Director as indicated in the individual advertisement. This copy must be postmarked or delivered on or before the deadline indicated above.
If an individual, firm, or corporation not authorized to engage in the practice of engineering desires to submit a Letter of Interest, said individual, firm, or corporation may do so as part of a Joint Venture with an individual, firm, or corporate which is permitted under the state law to engage in the practice of engineering.
If a Joint Venture responds to a project advertisement, the Department of Transportation will not accept separate Letters of Interest from the Joint Venture constituents. A firm will not be permitted to submit on more than one (1) Joint Venture for the same Project Reference Number. Also a firm that responds to a project as a prime may not be included as a designated subcontractor to another firm that responds as a prime to the project. Multiple responses under any of the foregoing situations will cause the rejection of all responses of the firm or firms involved. The above does not preclude a firm from being set forth as a designated subcontractor to more than one (1) prime responding to the project advertisement.
If a goal for Disadvantaged Business Enterprise (DBE) participation is established for an advertised project, firms expressing interest in the project must agree to ensure that Disadvantaged Business Enterprise (DBE) firms as defined in the Intermodal Surface Transportation Efficiency Act of 1991 and currently certified by the Department of Transportation shall have the maximum opportunity to participate in any subcontracting or furnishing supplies or services approved under Form 442, Section 1.10(a). The Act requires that firms owned and controlled by women (WBEs) be included, as a presumptive group, within the definition of Disadvantaged Business Enterprise (DBE). The goal for DBE participation shall be as stated in the individual project advertisement. Responding firms shall make good faith efforts to meet the DBE goal using DBEs (as they were defined prior to the act, WEBs or combinations thereof.
Proposing DBE firms must be certified at the time of submission of the Letter of Interest. If the selected firm fails to meet the established DBE participation goal, it shall be required to demonstrate its good faith efforts to attain the goal.
Responses are encouraged by small firms, Disadvantaged Business Enterprise (DBE) firms, and other firms who have not previously performed work for the Department of Transportation.
Each Letter of Interest must include the following information and the information must be packaged and presented in the following order:
1. Transmittal Letter (Maximum of two (2) 8 1/2" x 11" typed pages, one side)
The subject heading of the transmittal letter must include the project reference number for which the applicant wishes to be considered, the firm's legal name, fictitious name (if applicable), and the firm's federal identification number. If the project advertisement indicated the Department will retain an engineering firm for the project, the applicant must indicate in the body of their transmittal letter the names and Professional Engineer License Number of individuals who are directing heads or employees of the firm who have responsible charge of the firm's engineering activities, and whose names and seals shall be stamped on all plans, specifications, plats, and reports issued by the firm.
2. Project Organizational Chart (one page, one side, maximum size 11" x 17")
This Chart must show key staff from the prime and each subconsultant and their area of responsibility.
3. Standard Form 255, ''Architect-Engineer and Related Services Questionnaire for Specific Project'' (one Form 255 for the project team)
The Standard Form 255 must be signed, dated, and filled out in its entirety, including Item No. 6 listing the proposed subconsultants and the type of work or service they will perform on the project.
Under Item 4 of this form, Column A must specify only the number of subconsultant personnel and Column B must specify only the number of prime consultant personnel to be assigned to work on this project reference number. Do not include the total personnel for either the subconsultant or prime consultant under Item 4 unless the total personnel are necessary to provide the required work and services.
The prime and each subconsultant may include no more than one page each for Items 10 and 11.
If a Disadvantaged Business Enterprise (DBE) goal is specified for the project, the DBE must be currently certified by the Department of Transportation, and the name of the DBE and the work to be performed must be indicated in Item No. 6. If a Woman Business Enterprise (WBE) firm is substituted for the DBE, the WBE firm must also be presently certified by the Department of Transportation and indicated in Item 6.
4. Standard Form 254, ''Architect-Engineer for Related Services Questionnaire''
A Standard Form 254, not more than one (1) year old as of the date of this advertisement, must accompany each Letter of Interest for the firm, each party to a Joint Venture, and for each subconsultant the firm or Joint Venture is proposing to use for the performance of professional services regardless of whether the subconsultant is an individual, a college professor, or a Company, unless an acceptable Standard Form 254 for the prime and each subconsultant/subcontractor is on file in both the Bureau of Design and the Engineering District Office or Central Office Bureau identified in the individual project advertisement.
If the Standard Form 254 is not submitted with the Letter of Interest, the transmittal letter shall indicate the dates that the Standard Forms 254 were submitted to the Bureau of Design and appropriate Engineering District/Central Office Bureau.
These Forms must be assembled with the prime's form first, followed by the form for each subconsultant in the same order as the subconsultants appear in Item 6 of Form 255.
5. Workload Projection Graph (Not required for Construction Inspection Services)
Separate Workload Projection Graphs for the prime and each subconsultant shown in Item 6 of the Form 255 must be included and must indicate the firm's current and anticipated workload compared to the anticipated capacity available for the next two-year time frame. The Workload Projection Graphs must be submitted for the office(s) where the work would be performed and must only include the personnel classifications required for providing the advertised services and work.
6. Authorization Letters (For Construction Inspections Services, if required)
If the advertisement requires a letter signed by individuals giving their approval to use their name in the Letter of Interest, the letters from proposed prime employees must be first, followed by subconsultant employees, in the same order as shown in Item 6 of Form 255.
7. Registration To Do Business
Firms with out-of-state headquarters or corporations not incorporated in Pennsylvania must include, with each Letter of Interest, a copy of their registration to do business in the Commonwealth as provided by the Department of State. Firms who are not registered to do business in Pennsylvania at the time of this advertisement must document that they have applied for registration to the Department of State, Corporation Bureau. The telephone number for the Corporation Bureau is (717) 787-1057 or (717) 787-2004.
8. Overhead Rates (one page)
A single page summary must indicate the latest audited overhead rate developed in accordance with Federal Acquisition Regulations (FAR) for the prime consultant and each subconsultant. If a FAR rate is not available, the latest rate available from a Certified Public Accountant must be indicated. New firms should indicate how long the firm has been in existence and when an audited overhead rate would be available.
9. Additional Information
Additional information, not to exceed ten (10) one sided 8 1/2" x 11" pages or five (5) double sided 8 1/2" x 11" pages may be included at the discretion of the submitting firm.
The assignment of the agreement/contract for the above advertisement(s) will be made to one of the firms who submitted an acceptable Letter of Interest in response to the project advertisement. The assignment will be made based on the Department's evaluation of the firm's qualification and capabilities. The Department reserves the right to reject all letters submitted, to cancel the solicitations requested under this Notice, and/or to readvertise solicitation for the work and services.
BRADLEY L. MALLORY,
Secretary
[Pa.B. Doc. No. 98-866. Filed for public inspection May 29, 1998, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.