NOTICES
DEPARTMENT OF TRANSPORTATION
Anticipated Consultants Solicitations
[30 Pa.B. 957] During the first six (6) months of 2000, the Department of Transportation anticipates soliciting Letters of Interest from Consultant firms interested in providing work and services for the following specific project agreements or open-end contracts:
Engineering District 1-0
1. S. R. 4026 South Hills/Robison Road
Erie County
Preliminary Engineering/Environment Assessment2. S. R. 0208, Section A00 at I-79 Grove City
Mercer County
Preliminary Engineering/Environmental Assessment3. S. R. 0518, Section A00 Lamar Road/Pine Hollow
Mercer County
Preliminary Engineering/Environmental Documentation for 2 lane relocationEngineering District 3-0
1. S. R. 0220 Jersey Shore to Linden
Lycoming County
Preliminary Engineering, Environmental Studies, and Final Design2. Open-End Contract
Engineering and Environmental StudiesEngineering District 4-0
1. S. R. 0029, Section 770
Wyoming County
Bridge Replacement
Preliminary Engineering, Final Design and Construction Services2. S. R. 0434, Section 470
Pike County
Bridge Replacement using the Department's Modified Turn-key Process
Preliminary Engineering and Construction Services3. S. R. 0115, Section 303 (Connect 115 to I-81)
Luzerne County
New Highway on New Location
Preliminary Engineering, Final Design and Construction Services4. Four (4) Open-End Contracts
Engineering and Environmental ServicesEngineering District 5-0
1. S. R. 0183, Section 15S
Berks County, Bern Township
Interchange reconstruction, S. R. 183/''New 222'' Interchange (formerly the S. R. 183/3055 Interchange)
Preliminary Engineering, Final Design, and Services During Construction2. S. R. 4002, Section 01B
Monroe County, Tobyhanna Township
Emerald Lake Bridge Replacement
Preliminary Engineering, Final Design and Services During Construction3. S. R. 2027, Section 01B
S. R. 2031, Section 05B
Lehigh County, Lower Milford Township
Hosensack Bridge and Spinnertown Bridge Replacements
Preliminary Engineering, Final Design and Services During Construction4. S. R. 2045, Section 01B
S. R. 2045, Section 02B
Lehigh County, Upper Saucon Township
Saucon Creek Bridge and Center Valley
Bridge Replacements
Preliminary Engineering, Final Design, and Services During Construction5. S. R. 0412, Section 01B
Northampton County, City of Bethlehem
Fourth Street and Daly Avenue Bridge Replacement
Approximately six (6) inspectors for Construction Inspection6. S. R. 0061, Section 13S
Schuylkill County, Dusselfink Area
S. R. 61 Safety Rehabilitation and Overlay
Approximately eight (8) inspectors for Construction Inspection7. S. R. 0145, Sections 07B and 05S
Lehigh County, Whitehall Township
MacArthur Road Widening and Jordan Creek
Bridge Rehabilitation
Approximately six (6) inspectors for Construction Inspection8. S. R. 0078, Section 07M (Berks County)
S. R. 0033, Sections 001 and 002 (Northampton County)
S. R. 0412, Section 01B (Northampton County)
S. R. 0061, Section 13S (Schuylkill County)
Construction Inspection9. Highway Occupancy Permit Application
Review Assistance
District-Wide10. Open-End Contract for Construction Inspection
District-Wide
Approximately twenty-five (25) inspectors
Construction InspectionEngineering District 6-0
1. S. R. 0001, Section H05
Delaware County
Construction Inspection2. S. R. 0476, Section PM7
Montgomery County
I-76 to Chemical Road
Prev. Maintenance and Concrete Rehab.
Environmental Studies, Preliminary Engineering and Final Design3. S. R. 4027, Section 13B
Bucks County
Allentown Road/Licking Creek
Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design4. S. R. 2103, Section 01B
Bucks County
Pineville Road/Pidlock Creek
Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design5. S. R. 1009, Section 04B
Bucks County
Red Hill Road/Tinicum Creek
Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design6. S. R. 0013
Bucks County
U.S. 13 Bristol Pk.
PA 413 to Levittown Parkway
Environmental Studies, Preliminary Engineering and Final Design7. S. R. 0013, Section 03S
Delaware County
MacDade Boulevard/Darby Creek
Bridge Replace
Pavement Restoration
Environmental Studies, Preliminary Engineering and Final Design8. S. R. 2002, Section 01S
Bucks County Otter Street/Otter Creek Bridge Replacement Environmental Studies, Preliminary Engineering and Final Design9. S. R. 1003, Section 59M
Bucks County
Bridge/Aquetony Creek
Replace exist arches
Environmental Studies, Preliminary Engineering and Final Design10. S. R. 4012, Section 42M
Chester County
Suplee Road/Trib of Brandywine Creek, Culvert
Environmental Studies, Preliminary Engineering and Final Design11. S. R. 3049, Section 47M
Chester County
Brandywine Creek Road/Trib
Brandywine Creek, Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design12. S. R. 0100, Section 67S
Delaware County
Creek Road/Harveys Run
Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design13. S. R. 1015, Section 01B
Montgomery County
Quarry Road/WB Skipack
Creek Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design14. S. R. 0476, Section TIM
Delaware County
I-476 from I-95 to U.S. 1
Install ITS elements
Environmental Studies, Preliminary Engineering and Final Design15. S. R. 0095, Section TIM
Delaware County
I-95 from PA 291 to I-476
Install ITS elements
Environmental Studies, Preliminary Engineering and Final Design16. S. R. 0076, Section TIM
Montgomery County
I-76 from I-476 to U.S. 1
Install ITS elements
Environmental Studies, Preliminary Engineering and Final Design17. S. R. 0076, Section TM2
Montgomery County
I-76 from U.S. 1 to I-676
Install ITS elements
Environmental Studies, Preliminary Engineering and Final Design18. S. R. 0076, Section TM3
Philadelphia County
I-76 and PA 291 from I-676 to I-95 Install ITS elements
Environmental Studies, Preliminary Engineering and Final Design19. S. R. 4003, Section 13B
Philadelphia County
Allens Lane/SEPTA
Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design20. S. R. 2047, Section 01B
Bucks County
Hulmeville Avenue/Conrail
Bridge Replacement
Environmental Studies, Preliminary Engineering and Final Design21. S. R. 0030, Section 100
Chester County
Reconstruction of the U.S. 30 Coatesville-Downingtown Bypass from Exton Bypass to PA 10
Environmental Studies, Preliminary Engineering and Final Design22. S. R. 0202, Section 700
Bucks and Montgomery Counties
Review environmental related activities of Consultants and contractors to insure compliance with the commitments of the ROD and permit conditions Environmental MonitorEngineering District 8-0
1. S. R. 0022, Section 010
Dauphin County
S. R. 0022, Section 004
Lebanon County
Safety Improvements
Blue Ribbon Avenue in Dauphin County to I-78 in Lebanon County
Environmental, Preliminary Design, Final Design Multi-Phase Agreement
Project Manager: Mark Malhenzie (717) 783-50802. S. R. 0074
York County
Corridor Improvements
Red Lion Borough to Maryland State Line
Environmental, Preliminary Design, Final Design
Multi-Phase Agreement
Project Manager: Divyang Pathak (717) 787-7883
(NOTE: Likely advertisement is June)3. S. R. 0295, Section 001
York County
Susquehanna Trail Bridge
Bridge Replacement over Big Conewago Creek
Newberry and Conewago Townships
Project Manager: Richard Marshall (717) 783-51484. District-wide
Three (3) Design Open-End Agreements
Environmental, Preliminary Design, Final Design, Construction Consultation and Design Management
Project Manager: John Bachman (717) 783-4519Engineering District 9-0
1. S. R. 0220, Section 008
Bedford County
South Bedford Rehab.
Conc. Repair/Bridge Inspection
Preliminary and Final Engineering2. S. R. 6056
Bedford County
Pleasantville Mt. Improvements
Curve Reloc.
Preliminary Engineering/Environmental3. S. R. 4013
Blair County
Northern Altoona Access
Preliminary Engineering and Final Design4. I-0099
Blair County
Multi-Phase Redesign/Lane Addition of Plank Road Interchange
Preliminary Engineering5. S. R. 0219
Cambria County
Carrolltown to Clearfield County
Needs/Preliminary Engineering/Environmental6. S. R. 4021
Cambria County
Reconstruction of Number Nine Road
Preliminary Engineering/Environmental7. S. R. 0026
Huntingdon County
Huntingdon to Centre County Improvements
Preliminary Engineering/Final Design8. S. R. 0026, Section 016
Huntingdon County
Jackson Corner Slide
Major Geo-Tech work
Preliminary and Final Engineering/Environmental9. S. R. 0026, Section 018
Huntingdon County
McAlevey's Fort Improvements
Preliminary Engineering/Environmental10. S. R. 3001, Section 001
Huntingdon County
Little Valley Road Improvements
Final Design Engineering11. S. R. Various
Open-End for Environmental/Engineering
One or more Agreements12. S. R. Various
Open-End for Engineering/Environmental
One or more Agreements13. S. R. Various
Open-End for Construction and Permit Inspection
One or more Agreements14. S. R. Various
Open-End for Engineering/Utility Location and Design
One or more AgreementsEngineering District 11-0
1. S. R. 2004, Section B05
Freedom - Crider
Construction Inspection2. S. R. 2004, Section 006
Freedom - Crider
Construction Inspection3. S. R. 0108, Section L04
Mt. Jackson
Construction Inspection4. S. R. 1021, Section B01
Pine Run Road Bridge
Construction Inspection5. S. R. 4003, Section B01
Idlewild Road Bridge
Construction Inspection6. S. R. 0151, Section 016
Bockstown Road Bridge
Construction Inspection7. S. R. 4019, Section A06
Mt. Royal Boulevard Bridge
Construction Inspection8. S. R. 0351, Section 005
Conrail Railroad Bridge
Construction Inspection9. S. R. 0978, Section 002
North Branch Road Bridge
Construction Inspection10. S. R. 1005, Section 002
Country Club Road Bridge
Construction Inspection11. Open-End
Geotechnical12. S. R. 0079, Section A25
Neville Island Bridge Rehabilitation
Design13. S. R. 1042, Section A01
Allegheny Kiski Connector
Design - Multi-phase14. S. R. 0079, Section A23
I-79/Parkway Ramps
Design - Multi-phase15. S. R. 0048, Section A16
Mosside Boulevard Bridge
Multi-phase - Design16. S. R. 0051, Section A10
Final Design17. Open-End Contract
Bridge Design18. S. R. 0018, Section B13
Geneva CollegeThis advance notification is being provided by the Department of Transportation to allow the Consultants to begin building their team prior to the actual advertisement in the Pennsylvania Bulletin. The response time to submit a letter of interest on the above projects/open-end contracts will be six (6) calendar days.
LETTERS OF INTEREST ARE NOT REQUESTED AT THIS TIME. Specific advertisements will appear in future issues of the Pennsylvania Bulletin.
BRADLEY L. MALLORY,
Secretary
[Pa.B. Doc. No. 00-306. Filed for public inspection February 18, 2000, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.