§ 291.221.  Daily operational records.

   (a)  A person or municipality that disposes of residual waste by land application shall make and maintain an operational record for each day that the residual waste is applied.

   (b)  The daily operational record shall include the following:

   (1)  The type, percent solids and weight or volume of the residual waste that was applied.

   (2)  The name, mailing address, county and state of each generator of residual waste.

   (3)  The transporters of the residual waste.

   (4)  The particular map location of the area being used for land application of residual waste, and the weight or volume of residual waste this area received in the previous calendar year.

   (5)  A record of deviations from the permit.

   (6)  General weather conditions during disposal.

   (7)  The application rate for residual waste.

   (8)  A record of actions taken to correct violations of the act, the environmental protection acts and this title.

   (9)  A description of waste handling problems or emergency disposal facilities.

   (c)  If residual waste is being stored at the site, the operator shall maintain, on forms provided by the Department, accurate operational records sufficient to determine whether the waste is being stored in accordance with § 291.204 (relating to storage of residual waste).

   (d)  Daily operational records shall be retained for the life of the facility bond, or longer if determined by the Department to be necessary to meet the standards of the environmental protection acts. These records shall be made available to the Department upon request.

§ 291.222.  Annual operation report.

   (a)  A person or municipality that applies residual waste to land under this chapter shall submit to the Department an annual operation report for each permitted facility on or before March 1 of each year.

   (b)  The annual operation report, which shall be submitted on a form supplied by the Department, shall include the following:

   (1)  The weight or volume of each type of residual waste received, and the weight or volume applied to each field or other application area.

   (2)  The type, percent solids and weight or volume of residual waste received from each generator, including the name, mailing address, county and state of each generator.

   (3)  A current certificate of insurance, as specified in § 287.373(a) (relating to proof of insurance coverage), evidencing continuous coverage for comprehensive general liability insurance as required by § 287.371 (relating to insurance requirement).

   (4)  Changes in ownership of the land where the operation is conducted or a change in a lease agreement for the use of the land that may affect or alter the operator's rights upon the lands.

   (5)  The annual groundwater monitoring evaluation if groundwater monitoring is required by the Department.

   (6)  For agricultural utilization facilities which have received residual waste in the calendar year, a chemical analysis of soil for each field or soil series at the facility for pH, phosphorus, cadmium, zinc, copper, nickel, lead, chromium, mercury and any other constituents contained in the waste that may be leached into the environment, as determined under § 287.132 (relating to chemical analysis of waste), unless otherwise specified by the Department in the permit. The procedure for soil sampling and analysis shall be consistent with the Department guidelines.

   (7)  Certification that the operator has received the analysis or certification required by § 287.54 (relating to chemical analysis of waste) for each type of residual waste or special handling waste received at the facility, and that the residual waste that is received at the facility meets the conditions in the facility's permit.

   (c)  The annual operation report shall also contain a topographic map of the same scale and contour interval as the map required under § 291.103 (relating to maps and related information), showing the field boundaries where residual waste has been applied, and the volume applied to each field or other designated application area.

   (d)  The annual operation report shall be accompanied by a nonrefundable annual permit administration fee in the form of a check payable to the ''Commonwealth of Pennsylvania'' for the following amounts:

   (1)  Six hundred dollars for the agricultural utilization of residual waste.

   (2)  Nineteen hundred dollars for land reclamation of residual waste.

   (e)  The Department may waive any of the requirements of this section if no residual waste was disposed of by land application in the previous year.

Subchapter D.  ADDITIONAL REQUIREMENTS FOR THE AGRICULTURAL UTILIZATION OF RESIDUAL WASTE

ADDITIONAL APPLICATION REQUIREMENTS

§ 291.301.  Additional application requirements.

   In addition to the requirements of Subchapter B (relating to general application requirements for the land application of residual waste), an application for a permit for agricultural utilization of residual waste shall include the following:

   (1)  A projected 3-year crop rotation plan, including the type of farming operation, type of crop, planting sequence, crop management and use of the crops.

   (2)  An operations map showing the location of groundwater monitoring devices that exist or are proposed for the facility.

   (3)  A nutrient management plan for the site, including:

   (i)  A description of the kind and amount of fertilizers or soil conditioners that will be placed on the site in addition to residual waste.

   (ii)  The number and kind of animals on the farm or property, as well as the total nutrient value of manure produced by those animals, and the location where the manure is placed.

   (iii)  An explanation and analysis of the effect on the soil from the additional nutrients that would be supplied by the residual waste.

   (iv)  The benefit to the soil or farming operation that the waste would provide.

ADDITIONAL OPERATING REQUIREMENTS

§ 291.311.  General requirements.

   (a)  In addition to the requirements of Subchapter C (relating to general operating requirements for the land application of residual waste), a person or municipality that applies residual waste for agricultural utilization shall comply with this section and §§ 291.312--291.316, unless the person or municipality has obtained a permit from the Department for land reclamation. In that case, the person or municipality shall comply with the applicable provisions of Subchapter E (relating to additional requirements for land reclamation).

   (b)  A person or municipality may not apply residual waste for agricultural utilization that contains a constituent in such high concentrations that it requires a loading rate which would give the residual waste little or no nutrient or soil conditioning value in the soil.

§ 291.312.  Site characteristics.

   A person or municipality may not apply residual waste to a site unless the site complies with the following:

   (1)  The site shall have soils that fall within the United States Department of Agriculture textural classes of sandy loam, loam, sandy clay loam, silty clay loam or silt loam, unless otherwise approved by the Department in the permit.

   (2)  The site shall have a minimum depth from surface to seasonal high water table of 11 inches.

   (3)  Slopes to be utilized for agricultural utilization may not exceed 25%, unless otherwise approved in writing by the Department.

   (4)  Soil pH shall be 6.5 or greater prior to land application, unless the Department allows the operator to increase pH by application of residual waste or other material.

   (5)  Except as provided in paragraph (6), soil pH shall be maintained at 6.5 or greater for the life of land application operations.

   (6)  If the site is planted with nursery crops that require a pH of less than 6.5, the Department may approve a soil pH of 5.8 or greater in the permit.

§ 291.314.  (Reserved).

§ 291.315.  Water quality monitoring.

   (a)  If required by the Department as part of the permit, the operator shall conduct groundwater monitoring. The groundwater monitoring shall be in accordance with §§ 288.252--288.258, as required by the Department, and the terms and conditions of the permit, and shall continue for the period specified in § 293.262 (relating to cessation of operations).

   (b)  For purposes of interfacing with §§ 288.252--288.258, the following terms apply:

   (1)  The term ''disposal area'' is substituted with ''area where land application occurs.''

   (2)  The term ''residual waste landfill'' is substituted with ''land application facility.''

   (3)  The term ''disposed'' is substituted with ''land applied.''

§ 291.316.  Soil-pore water monitoring.

   If required by the Department, based upon the waste and site characteristics, the operator shall conduct soil-pore water monitoring and accurately characterize soil-pore water at the facility.

Subchapter E.  ADDITIONAL REQUIREMENTS FOR LAND RECLAMATION

ADDITIONAL OPERATING REQUIREMENTS

§ 291.412.  Site characteristics.

   A person or municipality may not apply residual waste under a land reclamation permit unless the site complies with the following:

   (1)  Slopes to be utilized for residual waste application may not exceed 35%, unless otherwise approved in writing by the Department.

   (2)  Soil pH shall be 6.5 or greater prior to residual waste application unless the Department in the permit allows the operator to increase pH by application of residual waste or other material. In that case, soil pH shall be 6.0 or greater at the end of the first year following the initial application of residual waste and 6.5 or greater at the end of the second year following the initial application of residual waste.

   (3)  Except as provided in paragraph (2), soil pH shall be maintained at 6.5 or greater during the life of application operations.

§ 291.414.  Weather.

   (a)  The operator may not apply residual waste between October 15 and April 15.

   (b)  The Department may approve the storage of residual waste between October 15 and May 30 in the permit if the operator makes a satisfactory demonstration under Chapter 299, Subchapter A (relating to standards for storage of residual waste). The storage may not exceed in amount the residual waste necessary to reclaim the permitted area that was prepared for residual waste application prior to October 15.

§ 291.416.  Water quality monitoring.

   (a)  If required by the Department as part of the permit, the operator shall conduct groundwater monitoring. The groundwater monitoring shall be in accordance with §§ 288.252--288.258, as required by the Department, and the terms and conditions of the permit, and shall continue for the period specified in § 293.262 (relating to cessation of operations).

   (b)  For purposes of interfacing with §§ 288.252--288.258, the following terms apply:

   (1)  The term ''disposal area'' is substituted with ''area where land application occurs.''

   (2)  The term ''residual waste landfill'' is substituted with ''land application facility.''

   (3)  The term ''disposed'' is substituted with ''land applied.''

§ 291.417.  Soil-pore water monitoring.

   If required by the Department, based upon waste and site characteristics, the operator shall conduct soil-pore water monitoring and accurately characterize soil-pore water at the facility.

Subchapter F.  (Reserved)

§§ 291.501--291.503.  (Reserved).

§§ 291.511--291.517.  (Reserved).

§§ 291.521--291.528.  (Reserved).

CHAPTER 293.  TRANSFER FACILITIES FOR RESIDUAL WASTE

Subchapter A.  GENERAL

§ 293.1.  Scope.

   (a)  This chapter sets forth application and operating requirements for transfer facilities. The requirements in this chapter are in addition to the applicable requirements in Chapter 287 (relating to residual waste management--general provisions).

   (b)  The Department may waive or modify a requirement of this chapter for permitted transfer facilities at which no actual loading, unloading or transferring of residual waste occurs, if the absence of the loading, unloading or transferring activity renders the requirement unnecessary.

Subchapter B.  APPLICATION REQUIREMENTS FOR TRANSFER FACILITIES

§ 293.102.  Operating plan.

   (a)  An application to operate a transfer facility shall contain a narrative description of the general operating plan for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be received at the facility, the process to be used at the facility, the daily operational methodology of the proposed process, the loading rate, the proposed capacity of the facility and the expected life of the facility.

   (b)  An application shall contain a plan for an alternative waste handling or disposal system during periods when the proposed facility is not in operation, including procedures to be followed in case of equipment breakdown. Procedures may include the use of standby equipment, extension of operating hours and contractual agreements for diversion of residual waste to other facilities.

   (c)  An application shall contain a plan for training equipment operators and other personnel concerning the operation and approved design of the facility, including safety measures to prevent injuries.

   (d)  An application shall contain a plan for assuring that solid waste received at the facility is consistent with § 293.201 (relating to basic limitations).

   (e)  An application shall contain the proposed operating hours of the proposed facility.

   (f)  An application shall contain a narrative describing the procedures for inspection and monitoring of incoming waste.

§ 293.103.  Maps and related information.

   (a)  An application shall contain a topographic map of the proposed permit area and adjacent area, including necessary narrative descriptions, which shows the following:

   (1)  The boundaries and names of present owners of record of land, both surface and subsurface, and including easements, rights-of-way and other property interests, for the proposed permit area and adjacent area; the boundaries of the land within the proposed permit area; and a description of title, deed or usage restrictions affecting the proposed permit area.

   (2)  The boundaries of the land to be affected over the estimated total life of the proposed facility.

   (3)  The location and name of surface water bodies such as springs, streams, lakes, ponds, wetlands, constructed or natural drains, and irrigation ditches that are located on or within 1/4 mile of the proposed facility.

   (4)  The location and name of public and private water sources that are located on or within 1/4 mile of the proposed facility. If more than 50 wells are located within the 1/4-mile radius, the applicant may identify only the closest wells in each direction and generally describe the location and number of wells within the 1/4-mile radius.

   (5)  The location of rights-of-way for high-tension power lines, pipelines, railroads and public and private roads within 300 feet of the proposed facility.

   (6)  The location of buildings in use by a person within 300 feet of the proposed facility.

   (7)  The anticipated location of water quality monitoring points if monitoring is required by the Department.

   (8)  The boundaries of land within the proposed permit area or adjacent area identified in § 293.202 (relating to areas where transfer facilities are prohibited).

   (9)  The municipalities in which the permit area is proposed to be located.

   (10)  The location of the 100-year floodplain boundaries.

   (11)  The location of access roads to and within the proposed permit area, including slopes, grades and lengths of the roads.

   (12)  The location of barriers, fences and similar facilities required by § 293.212 (relating to access control).

   (13)  The water diversion, collection, conveyance, erosion and sedimentation control, treatment, storage and discharge facilities to be used.

   (14)  The solid waste storage or loading/unloading areas.

   (15)  The areas of land for which a bond will be posted under Chapter 287, Subchapter E (relating to bonding and insurance requirements).

   (16)  The location and use of buildings and related facilities which will be used in the operation.

   (17)  The location of scales and weigh stations to be used in the operation.

   (18)  For noncaptive residual waste transfer facilities, a designated area for vehicles for use in the event of the detection of waste containing radioactive material. The designated area shall, by location or shielding, protect the environment, facility staff and public from radiation originating in the vehicle. The Department's ''Guidance Document on Radioactivity Monitoring at Solid Waste Processing and Disposal Facilities,'' Document Number 250-3100-001, describes various factors to consider in determining an appropriate designated area.

   (b)  The applicant shall also show the location of a permanent benchmark for horizontal and vertical control.

§ 293.106.  Soil and groundwater monitoring plan.

   (a)  If required by the Department, the applicant shall submit a groundwater monitoring plan to detect groundwater degradation from the facility.

   (b)  If required by the Department, the applicant shall submit a soil monitoring plan capable of detecting soil contamination from the facility.

§ 293.109.  Contingency plan.

   An application shall contain a contingency plan consistent with §§ 293.241--293.243 (relating to emergency procedures). The plan shall include a Preparedness, Prevention and Contingency (PPC) Plan that is consistent with the Department's most recent guidelines for the development and implementation of PPC Plans.

§ 293.110.  Daily volume.

   The application shall contain a proposed maximum daily volume for the facility, and a detailed justification for the volume, based on §§ 287.126 and 287.127 (relating to requirement for environmental assessment; and environmental assessment).

§ 293.111.  Radiation protection action plan.

   (a)  An application for a noncaptive residual waste transfer facility shall contain an action plan specifying procedures for monitoring for and responding to radioactive material entering the facility, as well as related procedures for training, notification, recordkeeping and reporting.

   (b)  The action plan shall be prepared in accordance with the Department's ''Guidance Document on Radioactivity Monitoring at Solid Waste Processing and Disposal Facilities,'' Document Number 250-3100-001, or in a manner at least as protective of the environment, facility staff and public health and safety and which meets all statutory and regulatory requirements.

   (c)  The action plan shall be incorporated into the transfer facility's approved waste analysis plan under § 287.134 (relating to waste analysis plan).

Subchapter C.  OPERATING REQUIREMENTS FOR TRANSFER FACILITIES

GENERAL PROVISIONS

§ 293.201.  Basic limitations.

   (a)  A person or municipality may not own or operate a transfer facility unless the Department has first issued a permit to that person or municipality for the facility under this chapter.

   (b)  A person or municipality that operates a transfer facility shall comply with the following:

   (1)  The operating requirements of the act, this subchapter and the applicable requirements of Chapter 287 (relating to residual waste management--general provisions).

   (2)  The plans and specifications in the permit, the terms and conditions of the permit, the environmental protection acts, this title and orders issued by the Department.

   (c)  A person or municipality that operates a transfer facility may not allow residual waste or special handling waste to be received or handled at the facility unless the Department has specifically approved handling the waste in the permit.

   (d)  A person or municipality that operates a transfer facility may not:

   (1)  Mix solid waste with, or store solid waste in proximity to other solid waste to create a risk of fire or explosion, or a risk of the accumulation of poisonous or otherwise harmful vapors or gases.

   (2)  Allow explosive waste to be stored, processed or disposed at the facility.

   (3)  Allow hazardous waste to be stored, processed or disposed at the facility.

   (e)  A person or municipality may not store, process or dispose of municipal waste, other than special handling waste, at the facility. Special handling municipal waste may be handled at the facility only if the Department has specifically approved handling the waste at the facility.

   (f)  All approved mitigation measures identified in the permit application shall be completed before a facility may accept waste unless a later date is authorized in writing by the Department for technical reasons.

   (g)  The following radioactive material controlled under specific or general license or order authorized by any Federal, state or other government agency may not be processed at the facility, unless specifically exempted from disposal restriction by an applicable Pennsylvania or Federal statute or regulation:

   (1)  Naturally occurring and accelerator produced radioactive material.

   (2)  Byproduct material.

   (3)  Source material.

   (4)  Special nuclear material.

   (5)  Transuranic radioactive material.

   (6)  Low-level radioactive waste.

   (h)  The following radioactive material may not be processed at the facility, unless approved in writing by the Department and the processing does not endanger the environment, facility staff or public health and safety.

   (1)  Short-lived radioactive material from a patient having undergone a medical procedure.

   (2)  TENORM.

   (3)  Consumer products containing radioactive material.

   (i)  The limitations in subsections (g) and (h) do not apply to radioactive material as found in the undisturbed natural environment of this Commonwealth.

§ 293.202.  Areas where transfer facilities are prohibited.

   (a)  Except for areas that were permitted prior to July 4, 1992, a transfer facility may not be operated:

   (1)  In the 100-year floodplain of a water in this Commonwealth, unless the Department approves in the permit a method of protecting the facility from a 100-year flood consistent with the Flood Plain Management Act (32 P.S. §§ 679.101--679.601) and the Dam Safety and Encroachments Act (32 P. S. §§ 693.1--693.27).

   (2)  In or within 300 feet of an exceptional value wetland.

   (3)  In or within 100 feet of a wetland other than an exceptional value wetland, unless the storage and processing take place in an enclosed facility and no adverse impacts to the wetland will occur or storage and processing will not occur within that distance and one of the following applies:

   (i)  If the operation is in or along the wetland, the operator has received a permit from the Department under Chapter 105 (relating to dam safety and waterway management).

   (ii)  If the operation is not in or along the wetland, no adverse hydrologic or water quality impacts will result.

   (4)  Within 300 feet measured horizontally from an occupied dwelling, unless the owner has provided a written waiver consenting to the facility being closer than 300 feet. The waiver shall be knowingly made and separate from a lease or deed unless the lease or deed contains an explicit waiver from the owner.

   (5)  Within 100 feet of a perennial stream, unless one of the following applies:

   (i)  The storage and processing take place in an enclosed facility and no adverse hydrologic or water quality impacts will result.

   (ii)  The facility transfers waste to barges at the transfer facility location.

   (iii)  Storage and processing that is not enclosed will not occur within that distance and no adverse hydrologic or water quality impacts will result.

   (6)  Within 50 feet of a property line, unless one of the following applies:

   (i)  The storage and processing take place in an enclosed facility.

   (ii)  The owner of the adjacent property has provided a written waiver consenting to the facility being closer than 50 feet. The waiver shall be knowingly made and separate from a lease or a deed unless the lease or deed contains an explicit waiver from the owner.

   (iii)  Actual storage and processing of waste is not occurring within that distance.

   (7)  If a school, park or playground is nearby, the following apply:

   (i)  Except for an expansion of a residual waste transfer station permit issued prior to January 13, 2001, for a residual waste transfer station permit issued on or after January 13, 2001, within 300 yards of the following:

   (A)  A building which is owned by a school district or school and used for instructional purposes.

   (B)  A park.

   (C)  A playground.

   (ii)  The current property owner of a school building, park or playground may waive the 300-yard prohibition by signing a written waiver. Upon receipt of the waiver, the Department will waive the 300-yard prohibition and will not use the prohibition as the basis for the denial of a new permit.

   (b)  Except as provided in subsection (c), this section does not apply to features that may come into existence after the date of the first newspaper notice under § 287.151 (relating to public notice by applicant).

   (c)  This section does not apply to features that may come into existence after the date of the first newspaper notice under this subsection if the following apply:

   (1)  The person or municipality publishes a notice of intent to file an application for a transfer facility permit. The notice, which is separate from the newspaper notice required by § 287.151, shall be published once a week for 3 consecutive weeks in a newspaper of general circulation in the area where the facility is proposed to be located. The notice shall include a brief description of the location and proposed operation of the facility.

   (2)  The person or municipality files an administratively complete application under § 287.202 (relating to completeness review) with the Department within 1 year from the date of the first newspaper notice under this subsection.

   (d)  The Department may waive the isolation distances in this section for areas that were included in the permit area of a permit application that was determined by the Department to be administratively complete before July 4, 1992.

DAILY OPERATIONS

§ 293.211.  Signs and markers.

   (a)  A person or municipality that operates a noncaptive transfer facility shall identify the facility for the duration of operations by posting and maintaining a sign which will be clearly visible and can be easily seen and read at the junction of each access road and public road unless otherwise approved by the Department. The sign shall be constructed of a durable, weather-resistant material. The sign shall show the name, business address and telephone number of the person or municipality that operates the facility, the operating hours of the facility and the number of the current permit authorizing operations at the facility.

   (b)  Permit area markers and the benchmark for horizontal and vertical control shall be:

   (1)  Posted and maintained for the duration of the operation to which they pertain.

   (2)  Clearly visible, readable and uniform throughout the operation.

   (3)  Permanently fixed and made of a durable material.

§ 293.212.  Access control.

   (a)  A gate or other barrier shall be maintained at potential vehicular access points to block unauthorized access to the site when an attendant is not on duty.

   (b)  The operator shall maintain a fence or other suitable barrier around the site sufficient to prevent unauthorized access.

   (c)  Access to the site shall be limited to times when an attendant is on duty.

§ 293.213.  Access roads.

   (a)  Access roads shall be designed, constructed and maintained to prevent erosion to the maximum extent possible and to prevent contributions of sediment to streams or runoff outside the site.

   (b)  A crossing of a perennial or intermittent stream or a wetland shall be made using bridges, culverts or similar structures. Bridges, culverts or other encroachments or water obstructions shall meet the requirements of Chapter 105 (relating to dam safety and waterway management).

   (c)  An access road shall have a drainage system that is compatible with the natural drainage system, structurally stable, and which will safely conduct the peak flow from a 25-year, 24-hour precipitation event. The drainage system shall comply with Chapter 102 (relating to erosion control).

   (d)  An access road shall be paved or surfaced with asphalt, gravel, cinders or other equivalent material approved by the Department in the permit. An access road shall be capable of withstanding the load limits projected by the applicant under § 293.104 (relating to plan for access roads). The maximum sustained grade of an access road may not exceed 12%.

   (e)  An access road negotiable by loaded collection vehicles shall be provided from the entrance gate of the area to unloading areas, treatment facilities or impoundments.

   (f)  Roads shall be constructed on a base that is capable of withstanding anticipated loads.

   (g)  Disturbed areas adjacent to a road shall be vegetated or otherwise stabilized to prevent erosion.

   (h)  An access road shall be maintained to control dust and to prevent or control the tracking of mud on and off site.

§ 293.214.  Measuring waste.

   (a)  An operator of a residual waste transfer facility that has received, is receiving or will receive 30,000 or more cubic yards of solid waste in a calendar year shall weigh solid waste when it is received. The scale used to weigh solid waste shall conform to 3 Pa.C.S. Chapter 41 (relating to the Consolidated Weights and Measures Act) and 70 Pa. Code Part I (relating to weighmasters). The operator of the scale shall be a licensed public weighmaster under 3 Pa.C.S. Chapter 41 and 70 Pa. Code Part I.

   (b)  The operator of a facility that is not required by subsection (a) to weigh waste when it is received shall accurately measure waste by volume or weight prior to unloading.

§ 293.215.  Operations and equipment.

   (a)  Loading, unloading, storage, compaction and related activities shall be conducted in an enclosed building, unless otherwise approved by the Department in the permit.

   (b)  The operator shall maintain on the site equipment necessary for operation of the facility in accordance with the permit. The equipment shall be maintained in an operable condition.

   (c)  If a breakdown of the operator's equipment occurs, the operator shall utilize standby equipment as necessary to comply with the act, the environmental protection acts, this subchapter and its permit conditions.

   (d)  Equipment shall be operated and maintained to prevent solid waste from being unintentionally removed from the storage area.

   (e)  Equipment shall be cleaned at frequencies specified in the permit based on scheduled or emergency maintenance periods.

   (f)  The operator of a transfer facility shall inspect and monitor incoming waste to ensure that the receipt of waste is consistent with this article.

§ 293.216.  Unloading area.

   (a)  The approach and unloading area shall be adequate in size and design to facilitate the rapid unloading of solid waste from the collection vehicles and the unobstructed maneuvering of the vehicles and other equipment.

   (b)  The loading areas and unloading areas shall be constructed of impervious material which is capable of being cleaned by high pressure water spray and shall be equipped with drains or sumps connected to a sanitary sewer system or treatment facility to facilitate the removal of water. Drains or treatment systems may be connected to a sanitary sewer system if a waste characterization is submitted to the sewage treatment plant operator, and the operator finds that the treatment plant can fully treat the waste stream. Leachate may also be collected in holding tanks prior to its transport to the sewage treatment plant.

   (c)  If the facility has an unloading pit, the facility shall have in place truck wheel curbs and tie downs that are sufficient to prevent trucks from backing into the pit or falling into the pit while unloading.

   (d)  An attendant or clearly marked signs shall direct vehicles to the unloading area.

   (e)  The operator shall ensure that collection vehicles unload waste promptly in unloading areas.

   (f)  Residual waste shall be confined to the unloading area and the approved storage areas.

§ 293.217.  Cleaning and maintenance.

   (a)  Areas within the building shall be kept clean.

   (b)  The operator may not allow putrescible waste to remain at the transfer facility at the end of the working day or for more than 24 hours, except that putrescible waste may remain at a transfer facility for any period of time up to 72 hours over a weekend or 3-day weekend if the transfer facility permit so provides.

   (c)  Plumbing shall be properly maintained, and the floors shall be well drained.

   (d)  Macerators, hammermills and grinders shall be cleanable and shall be equipped with drains that connect to a treatment facility. Drains or treatment systems may be connected to a sanitary sewer system if a waste characterization is submitted to the sewage treatment plant operator, and the operator finds that the treatment plant can fully treat the waste stream.

   (e)  Provision shall be made for the routine operational maintenance of the facility.

§ 293.218.  Air resources protection.

   (a)  The operator shall implement fugitive air contaminant control measures, and shall otherwise prevent and control air pollution in accordance with the Air Pollution Control Act (35 P. S. §§ 4001--4015), Article III (relating to air resources) and § 293.219 (relating to nuisance minimization control).

   (b)  A person or municipality may not cause or allow open burning at the facility.

§ 293.219.  Nuisance minimization and control.

   (a)  The operator shall control and minimize the attraction, harborage or breeding of vectors.

   (b)  The operator also shall control and minimize conditions not otherwise prohibited by this subchapter that are harmful to the environment or public health, or which create safety hazards, odors, dust, noise, unsightliness or other public nuisances.

§ 293.221.  Litter.

   (a)  The operator may not allow litter to be blown or otherwise deposited offsite.

   (b)  Blown off and intercepted litter shall be collected at least weekly from fences, roadways, tree line barriers and other barriers and disposed or stored in accordance with the act and this article, unless a greater frequency is set forth in the permit.

§ 293.222.  Daily volume.

   A person or municipality operating a transfer facility may not receive solid waste at the facility in excess of the maximum daily volume approved in the permit.

§ 293.223.  Radiation monitoring and response for noncaptive residual waste transfer facilities.

   (a)  An operator shall implement the action plan approved under § 293.111 (relating to radiation protection action plan).

   (b)  An operator shall monitor incoming waste in accordance with the Department's ''Guidance Document on Radioactivity Monitoring at Solid Waste Processing and Disposal Facilities,'' Document number 250-3100-001, or in a manner at least as protective of the environment, the facility staff and the public health and safety. Monitoring shall meet the requirements of this section and the facility's approved radiation protection action plan.

   (c)  Radiation detector elements shall be as close as practical to the waste load and in an appropriate geometry to monitor the waste. The radiation monitoring system shall be set to alarm at a level no higher than 10 microroentgen per hour (uR/hr) above the average background at the facility when any of the radiation detector elements is exposed to a Cesium-137 gamma radiation field. Radiation detector elements shall be shielded to maintain the average background below 10 uR/hr. If capable of energy discrimination, the radiation monitoring system shall be set to detect gamma rays of a 50 kiloelectron volt (keV) energy and higher.

   (d)  An operator shall have portable radiation monitors capable of determining the radiation dose rate and presence of contamination on a vehicle that has caused an alarm. Upon a confirmed exceedance of the alarm level in subsection (c), a radiological survey of the vehicle shall be performed.

   (e)  An operator shall notify the Department immediately and isolate the vehicle when radiation dose rates of 20 µSv/hr (2 mrem/hr) or greater are detected in the cab of a vehicle, 500 µSv/hr (50 mrem/hr) or greater are detected from any other surface, or contamination is detected on the outside of the vehicle.

   (f)  Monitoring equipment shall be calibrated at a frequency specified by the manufacturer, but not less than once a year.

   (g)  If radioactive material is detected, the vehicle containing the radioactive material may not leave the facility without written Department approval and an authorized United States Department of Transportation exemption form.

SOIL AND WATER PROTECTION

§ 293.231.  General requirements.

   (a)  The operator may not cause or allow a point or nonpoint source discharge in violation of The Clean Streams Law from or on the facility to surface waters of this Commonwealth.

   (b)  A transfer facility shall be operated to prevent and control water pollution. An operator shall operate and maintain necessary water pollution treatment facilities until water pollution from or on the facility has been permanently abated.

   (c)  The operator may not cause water pollution on or off the site.

   (d)  The operator may not cause contamination of soil on or off the site.

§ 293.232.  Soil erosion and sedimentation control.

   The operator shall manage surface water and control erosion and sedimentation to:

   (1)  Divert surface water away from the storage area with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, and supported by written calculations and also comply with Chapter 102 (relating to erosion control).

   (2)  Meet the requirements of Chapters 102 and 105 (relating to erosion and sediment control; and dam safety and waterway management).

   (3)  Prevent erosion to the maximum extent possible, including where possible, using revegetation.

§ 293.233.  Soil and groundwater monitoring.

   (a)  If required by the Department as part of the permit, the operator shall conduct soil or groundwater monitoring, or both. The groundwater monitoring shall be in accordance with §§ 288.252--288.258, as required by the Department, and the terms and conditions of the permit, and shall continue for the period specified in § 293.262 (relating to cessation of operations).

   (b)  For purposes of interfacing with §§ 288.252--288.258, the following terms apply:

   (1)  The term ''disposal area'' is substituted with ''area where storage and processing occur.''

   (2)  The term ''residual waste landfill'' is substituted with ''transfer facility.''

   (3)  The term ''disposed'' is substituted with ''stored or processed.''

§ 293.234.  Water supply replacement.

   (a)  An operator that adversely affects a water supply by degradation, pollution or other means shall restore the affected supply at no additional cost to the owner or replace the affected water supply with an alternate source that is of like quantity and quality to the original supply at no additional cost to the owner.

   (b)  A temporary water supply shall be provided as soon as practicable but no later than 48 hours after one of the following:

   (1)  Receipt of information showing that the operator is responsible for adversely affecting the water supply.

   (2)  Receipt of notice from the Department that the operator is responsible for adversely affecting the water supply.

   (c)  A permanent water supply shall be provided as soon as practicable but no later than 90 days after one of the following:

   (1)  Receipt of information showing that the operator is responsible for adversely affecting the water supply.

   (2)  Receipt of notice from the Department that the operator is responsible for adversely affecting the water supply.

   (d)  Permanent water supplies include development of a new well with a distribution system, interconnection with a public water supply or extension of a private water supply, but do not include provision of bottled water or a water tank supplied by a bulk water hauling system, which are temporary water supplies.

EMERGENCY PROCEDURES

§ 293.241.  Hazard prevention.

   A transfer facility shall be designed, constructed, maintained and operated to prevent and minimize the potential for fire, explosion or release of solid waste constituents to the air, water or soil of this Commonwealth that could threaten public health or safety, public welfare or the environment.

RECORDKEEPING AND REPORTING

§ 293.251.  Daily operational records.

   (a)  A person or municipality that operates a transfer facility shall make and maintain an operational record for each day that residual waste is received, processed or transported offsite.

   (b)  The daily operational record shall include the following:

   (1)  The type and weight or volume of the solid waste received.

   (2)  The name, mailing address, county and state of each generator of residual waste.

   (3)  The transporters of the solid waste.

   (4)  The destination of the solid waste, including the facility name, the county and state in which it is located and the type and weight or volume of waste transported.

   (5)  The type and weight or volume of materials which are used or reclaimed.

   (6)  A description of waste handling problems or emergency activities.

   (7)  A record of deviations from the approved design or operational plans.

   (8)  A record of activities for which entries are needed to comply with the annual operation report required in § 293.252 (relating to annual operation report).

   (9)  A report of actions taken to correct violations of the act, the environmental protection acts and this title.

   (10)  A record of rejected waste loads, and the reasons for rejecting the loads.

   (11)  For noncaptive facilities, a record of each incident in which radioactive material is detected in waste loads. The record shall include:

   (i)  The date, time and location of the occurrence.

   (ii)  A brief narrative description of the occurrence.

   (iii)  Specific information on the origin of the material, if known.

   (iv)  A description of the radioactive material involved, if known.

   (v)  The name, address and telephone numbers of the supplier or handler of the radioactive material and the name of the driver.

   (vi)  The final disposition of the material.

   (c)  The operator shall maintain accurate operational records sufficient to determine whether residual waste is being stored in accordance with Chapter 299, Subchapter A (relating to standards for storage of residual waste).

   (d)  Daily operational records shall be retained for the life of the facility bond, or longer if determined by the Department to be necessary to meet the standards of the environmental protection acts. These records shall be made available to the Department upon request.

§ 293.252.  Annual operation report.

   (a)  A person or municipality that operates a transfer facility shall submit to the Department an annual operation report on or before June 30 of each year.

   (b)  The annual operating report, which shall be submitted on a form supplied by the Department, shall include the following:

   (1)  The weight or volume of each type of solid waste received.

   (2)  The weight or volume of each material used, reclaimed or marketed.

   (3)  The destination of the solid waste, including the facility name, the county and state in which it is located, and the type and weight or volume of waste transported.

   (4)  A current certificate of insurance as specified in § 287.373(a) (relating to proof of insurance coverage), evidencing continuous coverage for comprehensive general liability insurance as required by § 287.371 (relating to insurance requirement).

   (5)  Changes in the previous year concerning the information required by §§ 287.124 and 287.125 (relating to identification of interests; and compliance information). The report shall also state if no changes have occurred.

   (6)  A change in the ownership of the land upon which the facility is located or a change in a lease agreement for the use of the land that may affect or alter the operator's rights upon the lands.

   (7)  A written update of the total bond liability for the facility under § 287.331 (relating to bond amount determination). If additional bond is determined to be necessary, it shall be submitted to the Department within 90 days after the annual report is due.

   (8)  Certification that the operator has received the analysis or certification required by § 287.54 (relating to chemical analysis of waste) for each type of residual waste or special handling waste received at the facility, and that the residual waste or special handling waste that is received at the facility meets the conditions in the facility's permit.

   (9)  A record of detected radioactive materials.

   (c)  The annual operation report shall be accompanied by a nonrefundable annual permit administration fee of $900 in the form of a check payable to ''Commonwealth of Pennsylvania.''

CESSATION AND CLOSURE

§ 293.262.  Cessation of operations.

   (a)  Upon cessation of transfer operations at the facility, the operator shall remove solid waste and structures or other materials which contain or are contaminated with solid waste, and shall provide for the processing or disposal of the waste or material in accordance with the act, the environmental protection acts and this title.

   (b)  An operator required under § 293.233 (relating to soil and groundwater monitoring) to conduct soil monitoring may discontinue soil monitoring upon, cessation of processing operations with the Department's approval. In deciding whether to allow discontinuance of monitoring, the Department will consider the operational history of the facility, the likelihood that soil contamination will manifest itself in the future and other factors.

   (c)  An operator required under § 293.233 to conduct groundwater monitoring may discontinue groundwater monitoring after cessation of processing operations and cleanup only upon written approval by the Department. In deciding whether to allow discontinuance of monitoring, the Department will consider the operational history of the facility, the likelihood that groundwater contamination will manifest itself in the future, whether the remediation standards in § 287.342(c) (relating to final closure certification) are met and maintained and other relevant factors.

CHAPTER 295.  COMPOSTING FACILITIES FOR RESIDUAL WASTE

Subchapter B.  APPLICATION REQUIREMENTS FOR COMPOSTING FACILITIES

OPERATIONS

§ 295.111.  Operating plan.

   An application to operate a composting facility shall contain the following:

   (1)  A narrative description of the general operating plan for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be composted at the facility, the suitability of the waste for composting, the composting process to be used at the facility, the daily operational methodology of the proposed process, the proposed processing and storage capacity of the facility and the expected life of the facility.

   (2)  A plan for an alternative waste handling or disposal system during periods when the proposed facility is not in operation, including procedures to be followed in case of equipment breakdown. Procedures may include the use of standby equipment, extension of operating hours or contractual agreements for diversion of residual waste to other facilities.

   (3)  A plan for sampling and analyzing the compost.

   (4)  A description of the anticipated quality of the compost.

   (5)  A plan for the anticipated recovery rate of compost from the process, and plans for the reuse, sale or marketing of the compost.

   (6)  A plan for managing compost if markets for the sale or reuse of compost become unavailable.

   (7)  A plan for the proposed location and method for disposal or processing of residue produced by operation of the facility.

   (8)  A plan for assuring that solid waste received at the facility is consistent with § 295.201 (relating to basic limitations).

   (9)  A plan for training equipment operators and other personnel concerning the operation and approved design of the facility.

   (10)  The proposed operating hours of the proposed facility.

   (11)  A narrative describing the procedures for inspection and monitoring of incoming waste.

§ 295.112.  Maps and related information.

   (a)  An application shall contain a topographic map of the proposed permit area and adjacent area, including necessary narrative descriptions, which shows the following:

   (1)  The boundaries and the names of the present owners of record of land, both surface and subsurface, including easements, rights-of-way and other property interests, for the proposed permit area and adjacent area; the boundaries of the land within the proposed permit area; and a description of title, deed or usage restrictions affecting the proposed permit area.

   (2)  The boundaries of land to be affected over the estimated total life of the proposed operation.

   (3)  The location and name of surface water bodies, such as springs, streams, lakes, ponds, wetlands, constructed or natural drains and irrigation ditches that are located on the proposed permit area and adjacent area.

   (4)  The location and name of public and private water sources that are located on the proposed permit area and adjacent area.

   (5)  The location of rights-of-way for high-tension power lines, pipelines, railroads and public and private roads within 300 feet of the proposed facility.

   (6)  The location of buildings in use within 300 feet of the proposed facility.

   (7)  The anticipated location of water quality monitoring points.

   (8)  The boundaries of land within the proposed permit area or adjacent area identified in § 295.202 (relating to areas where composting facilities are prohibited).

   (9)  The location of underground mine shafts on the proposed permit area and on adjacent areas.

   (10)  The municipalities in which the permit area is proposed to be located.

   (11)  The location of the 100-year floodplain boundaries in the permit area and adjacent area.

   (12)  The location of barriers, fences and similar structures required by § 295.213 (relating to access control).

   (13)  Water diversion, collection, conveyance, sedimentation and erosion control, treatment, storage and discharge facilities to be used.

   (14)  Composting pads, tipping areas, storage areas, windrow, and loading/unloading areas.

   (15)  Areas of land for which a bond will be posted under Chapter 287, Subchapter E (relating to bonding and insurance requirements).

   (16)  The location, size and use of buildings and related facilities which will be used in the operation, including the horizontal and vertical dimensions.

   (17)  The location of scales and weigh stations to be used in the operation.

   (18)  Utilities to be installed at the facility.

   (19)  The location of access roads to the site, including slopes, grades and lengths of the roads.

   (20)  For noncaptive residual waste composting facilities, a designated area for vehicles for use in the event of the detection of waste containing radioactive material. The designated area shall, by location or shielding, protect the environment, facility staff and public from radiation originating in the vehicle. The Department's ''Guidance Document on Radioactivity Monitoring at Solid Waste Processing and Disposal Facilities,'' Document Number 250-3100-001, describes various factors to consider in determining an appropriate designated area.

   (b)  The applicant shall also submit a grid coordinate system for the entire proposed permit area. The horizontal control system shall consist of a grid not to exceed 200-foot-square sections. A permanent benchmark for horizontal and vertical control shall be shown. The grid system shall be tied to the benchmark and the baseline.

§ 295.119.  Daily Volume.

   The application shall contain a proposed maximum daily volume for the facility, and a detailed justification for the volume, based on §§ 287.126 and 287.127 (relating to requirement for environmental assessment; and environmental assessment).

§ 295.120.  Radiation protection action plan.

   (a)  An application for a noncaptive residual waste composting facility shall contain an action plan specifying procedures for monitoring for and responding to radioactive material entering the facility, as well as related procedures for training, notification, recordkeeping and reporting.

   (b)  The action plan shall be prepared in accordance with the Department's ''Guidance Document on Radioactivity Monitoring at Solid Waste Processing and Disposal Facilities,'' Document Number 250-3100-001, or in a manner at least as protective of the environment, facility staff and public health and safety and which meets all statutory and regulatory requirements.

   (c)  The action plan shall be incorporated into the facility's approved waste analysis plan under § 287.134 (relating to waste analysis plan).

COMPOSTING

§ 295.121.  Composting pad design.

   (a)  An application shall contain plans and specifications for the design, construction and maintenance of composting pads that will be required for the proposed facility.

   (b)  The application shall also contain a plan for inspection of composting pads or vessels to ensure its integrity.

   (c)  Composting pad or vessel plans and designs shall be consistent with § 295.231 (relating to composting pad or vessel).

[Continued on next Web Page]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.