   (A)  Routine monitoring.

   (I)  Daily monitoring. Systems shall take daily samples at the entrance to the distribution system. Systems that must conduct additional monitoring in accordance with clause (B) shall continue to take routine daily samples at the entrance to the distribution system.

   (II)  Monthly monitoring.

   (-a-)  Systems shall take a three-sample set each month in the distribution system. The system shall take one sample at each of the following locations:

   (-1-)  As close to the first customer as possible.

   (-2-)  At a location representing an average residence time.

   (-3-)  At a location representing a maximum residence time.

   (-b-)  Systems that must conduct additional monitoring in accordance with subclause (III) may use the results of the additional monitoring to meet the monthly monitoring requirements of this subclause.

   (III)  Additional monitoring. If a daily sample at the entrance to the distribution system exceeds the chlorite MCL, the system shall take three samples in the distribution system on the following day. The system shall take one sample at each of the following locations:

   (-a-)  As close to the first customer as possible.

   (-b-)  At a location representing an average residence time.

   (-c-)  At a location representing a maximum residence time.

   (B)  Reduced monitoring. Chlorite monitoring in the distribution system required by clause (A)(II) may be reduced to one three-sample set per quarter after 1 year of monitoring where no individual chlorite sample taken in the distribution system under clause (A)(II) has exceeded the chlorite MCL and the system has not been required to conduct additional monitoring under clause (A)(III). The system may remain on the reduced monitoring schedule until either any of the three individual chlorite samples taken quarterly in the distribution system exceeds the chlorite MCL or the system is required to conduct additional monitoring under clause (A)(III), at which time the system shall revert to routine monitoring as prescribed by clause (A).

   (iii)  Bromate. Community water systems and nontransient noncommunity water systems that use ozone for disinfection or oxidation, or provide finished water that contains ozone, shall monitor for bromate.

   (A)  Routine monitoring. Systems shall take one sample per month for each treatment plant that uses ozone. Systems shall take the monthly sample at the entrance to the distribution system while the ozonation system is operating under normal conditions.

   (B)  Reduced monitoring. Systems required to analyze for bromate may reduce monitoring from monthly to quarterly provided that the system demonstrates that the average source water bromide concentration is less than 0.05 mg/L based upon representative monthly bromide measurements for 1 year. Systems on reduced monitoring shall continue to take monthly samples for source water bromide. Systems may remain on reduced bromate monitoring until the running annual average source water bromide concentration, computed quarterly, is equal to or greater than 0.05 mg/L based upon representative monthly measurements, at which time the system shall revert to routine monitoring as prescribed by clause (A).

   (iv)  Disinfection byproduct precursors. Systems that use either surface water or GUDI sources and that use conventional filtration shall monitor for disinfection byproduct precursors.

   (A)  Routine monitoring. Systems shall take monthly samples of the source water alkalinity, the source water TOC and postsedimentation TOC for each treatment plant that uses conventional filtration. Postsedimentation TOC can be taken at any point between sedimentation effluent and the entry point to the distribution system. The three samples shall be taken concurrently and at a time that is representative of both normal operating conditions and influent water quality.

   (B)  Reduced monitoring. Systems with an average postsedimentation TOC of less than 2.0 mg/L for 2-consecutive years, or less than 1.0 mg/L for 1 year, may reduce monitoring for source water alkalinity, source water TOC and postsedimentation TOC from monthly to quarterly for each applicable treatment plant. The system shall revert to routine monitoring as prescribed by clause (A) in the month following the quarter when the annual average postsedimentation TOC is not less than 2.0 mg/L.

   (C)  Early monitoring. Systems may begin monitoring to determine whether the TOC removal requirements of 40 CFR 141.135(b)(1) (relating to enhanced coagulation and enhanced softening performance requirements) can be met 12 months prior to the compliance date for the system. This monitoring is not required and failure to monitor during this period is not a violation. However, any system that does not monitor during this period, and then determines in the first 12 months after the compliance date that it is not able to meet the requirements of 40 CFR 141.135(b)(1) and shall therefore apply for alternate minimum TOC removal requirements under 40 CFR 141.135(b)(4) is not eligible for retroactive approval of the alternate minimum TOC removal requirements and is in violation. Systems may apply for alternate minimum TOC removal requirements any time after the compliance date.

   (13)  Monitoring requirements for disinfectant residuals. Community water systems and nontransient noncommunity water systems that use a chemical disinfectant or oxidant, or provide finished water that contains a chemical disinfectant or oxidant, shall monitor for disinfectant residuals. Transient noncommunity water systems that use chlorine dioxide as either a disinfectant or oxidant shall monitor for chlorine dioxide disinfectant residual. Systems that use either surface water or GUDI sources and that serve at least 10,000 persons shall begin monitoring by January 1, 2002. Systems that use either surface water or GUDI sources and that serve fewer than 10,000 persons, or systems that use groundwater sources, shall begin monitoring by January 1, 2004. Systems monitoring for disinfectant residuals shall take all samples during normal operating conditions. Compliance with the MRDLs and monitoring requirements for chlorine, chloramines and chlorine dioxide (where applicable) shall be determined in accordance with 40 CFR 141.132 and 141.133 (relating to monitoring requirements; and compliance requirements) which are incorporated herein by reference.

   (i)  Chlorine and chloramines. Systems shall measure the residual disinfectant level at the same points in the distribution system and at the same time that total coliforms are sampled, as specified in paragraph (3). Systems that used either surface water or GUDI sources may use the results of residual disinfectant concentration sampling conducted under paragraph (1) or (2) in lieu of taking separate samples.

   (ii)  Chlorine dioxide.

   (A)  Routine monitoring. Systems shall take one sample per day at the entrance to the distribution system. For any daily sample that exceeds the MRDL, the system shall conduct additional monitoring as specified in clause (B) in addition to the sample required at the entrance to the distribution system. Compliance shall be based on consecutive daily samples collected by the system under this clause.

   (B)  Additional monitoring. If a daily sample at the entrance to the distribution system exceeds the chlorine dioxide MRDL, the system shall take three samples in the distribution system on the following day. If chlorine dioxide or chloramines are used to maintain a disinfectant residual in the distribution system, or if chlorine is used to maintain a disinfectant residual in the distribution system and there are no disinfectant addition points after the entrance to the distribution system, the system shall take three samples as close to the first customer as possible, at intervals of at least 6 hours. If chlorine is used to maintain a disinfectant residual in the distribution system and there are one or more disinfection addition points after the entrance to the distribution system, the system shall take one sample at each of the following locations:

   (I)  As close to the first customer as possible.

   (II)  At a location representing an average residence time.

   (III)  At a location representing a maximum residence time.

§ 109.302.  Special monitoring requirements.

   (a)  The Department may require a public water supplier to conduct monitoring in addition to that required by § 109.301 (relating to general monitoring requirements) if the Department has reason to believe the public water system is not in compliance with the MCL, MRDL or treatment technique requirement for the contaminant.

   (b)  The Department may require a public water supplier to conduct additional monitoring to provide information on contamination of the water supply where a potential health hazard may exist in the water supply and monitoring required under § 109.301 may not be adequate to protect the public health.

   (c)  The Department may require a public water supplier to conduct special monitoring for an unregulated contaminant if the Department has reason to believe the contaminant is present in the public water system and creates a health risk to the users of the public water system.

   (d)  The Department will provide a schedule for sampling, instructions for sampling methods and handling samples, and analytical procedures to be followed by public water systems required to perform special monitoring.

   (e)  The Department may designate special monitoring requirements on a case-by-case basis for experimental facilities.

   (f)  To enable the Department to determine if a public water supplier is using a source directly influenced by surface water, the Department may require a public water supplier to conduct monitoring to evaluate the direct influence of surface water upon the source of supply. Monitoring shall be conducted for at least 6 months to include both the wet and dry periods of the year. Samples shall be taken from the collection facilities and measurements shall include the following:

   (1)  Daily field measurement of temperature, pH, specific conductance and turbidity.

   (2)  Daily measurement of water level, or flow, and precipitation necessary to establish climatic conditions.

   (3)  Weekly measurements for total coliform.

   (4)  Other measurements as required by the Department to evaluate the direct influence of surface water upon the source of supply.

   (g)  The Department may reduce or eliminate the monitoring required by subsection (f) if the public water supplier demonstrates and the Department determines that the source of supply is not directly influenced by surface water.

Subchapter D.  PUBLIC NOTIFICATION

§§ 109.401--109.406.  (Reserved).

§ 109.407.  General public notification requirements.

   (a)  Violation categories and other situations requiring a public notice. A public water supplier shall give public notice for the following circumstances:

   (1)  Failure to comply with an applicable State primary MCL or MRDL in Subchapter B (relating to MCLs, MRDLs or treatment technique requirements).

   (2)  Failure to comply with a prescribed treatment technique requirement in Subchapter B or Subchapter K (relating to lead and copper).

   (3)  Failure to perform water quality monitoring, as required by Subchapter C (relating to monitoring requirements) or Subchapter K.

   (4)  Operation under a variance or an exemption under Subchapter I (relating to variances and exemptions issued by the Department).

   (5)  Failure to comply with the requirements of any schedule that has been set under a variance or exemption.

   (6)  Occurrence of a waterborne disease outbreak or other waterborne emergency.

   (7)  Availability of unregulated contaminant monitoring data.

   (8)  Exceedance of the nitrate MCL by noncommunity water systems, when permitted by the Department in writing to exceed the MCL in accordance with 40 CFR 141.11(d) (relating to MCLs for inorganic contaminants).

   (b)  Definition of public notice tiers. Public notice requirements are divided into three tiers, to take into account the seriousness of the violation or situation and any potential adverse health effects that may be involved. The public notice requirements for each violation or situation identified in subsection (a) is determined by the tier to which it is assigned. This subchapter incorporates by reference the tier assignment for each specific violation or situation in the National Primary Drinking Water Regulations, 40 CFR Part 141, Subpart Q, Appendix A (relating to the tier assignment for each specific NPDWR violation and other situations requiring public notice), unless other tier assignments are established by regulations or order of the Department.

   (1)  Tier 1 public notice. Required for violations and situations specified in subsection (a) with significant potential to have serious adverse effects on human health as a result of short-term exposure. General violation categories and other situations requiring a Tier 1 public notice are specified in § 109.408(a) (relating to Tier 1 public notice--form, manner and frequency of notice).

   (2)  Tier 2 public notice. Required for all other violations and situations in subsection (a) with potential to have serious adverse effects on human health. General violation categories and other situations requiring a Tier 2 public notice are specified in § 109.409(a) (relating to Tier 2 public notice--form, manner and frequency of notice).

   (3)  Tier 3 public notice. Required for all other violations and situations in subsection (a) not included in Tier 1 and Tier 2. General violation categories and other situations requiring a Tier 3 public notice are specified in § 109.410(a) (relating to Tier 3 public notice--form, manner and frequency of notice).

   (c)  Public notice recipients.

   (1)  A public water supplier shall provide public notice to persons served by the public water system, in accordance with this subchapter. A public water system that sells or otherwise provides drinking water to another public water system, such as to a consecutive water, bulk water hauling or vended water system, shall give public notice to the owner or operator of the other water system. The other water system is responsible for ensuring that public notice is provided to the persons it serves.

   (2)  If a public water system has a violation in a portion of the distribution system that is physically or hydraulically isolated from other parts of the distribution system, the Department may allow the water supplier to limit distribution of the public notice to only persons served by that portion of the system which is out of compliance. Permission for limiting distribution of the notice shall be granted in writing by the Department.

   (3)  If a public water system has a violation involving a point-of-entry (POE) device, the Department may allow the water supplier to limit distribution of the public notice to only persons served by that POE device. Permission for limiting distribution of the notice shall be granted in writing by the Department.

   (4)  If a community water system has a Tier 1 violation, the water supplier shall also notify key public officials as designated in the community water system's emergency response plan under § 109.707(a) (relating to emergency response plan).

   (5)  If a noncommunity water system in which persons 17 years of age or under are cared for or educated, such as a school or day care center, has a Tier 1 violation, the water supplier shall also provide public notice directly to the parent or guardian of those persons.

   (6)  A water supplier shall provide a copy of the notice to the Department in accordance with the requirements under § 109.701(a)(4) (relating to reporting and recordkeeping).

§ 109.408.  Tier 1 public notice--form, manner and frequency of notice.

   (a)  General violation categories and other situations requiring a Tier 1 public notice. A public water supplier shall provide Tier 1 public notice for the following circumstances:

   (1)  Violation of the MCL for total coliforms when fecal coliforms or E. coli are present in the water distribution system, as specified in § 109.202(a)(2)  (relating to MCLs, MRDLs or treatment technique requirements), or when the water supplier fails to test for fecal coliforms or E. coli when any check sample tests positive for coliforms, as specified in § 109.301(3) (relating to general monitoring requirements).

   (2)  Violation of the MCL for nitrate, nitrite or total nitrate and nitrite, as defined in § 109.202(a)(2), or when the water supplier fails to take a confirmation sample within 24 hours of the system's receipt of the first sample showing an exceedance of the nitrate or nitrite MCL, as specified in § 109.301(7)(ii)(C)(V).

   (3)  Exceedance of the nitrate MCL by noncommunity water systems, where permitted by the Department in writing to exceed the MCL in accordance with 40 CFR 141.11(d) (relating to maximum contaminant levels for inorganic chemicals).

   (4)  Violation of the MRDL for chlorine dioxide, as defined in § 109.202(f)(2), when one or more samples taken in the distribution system the day following an exceedance of the MRDL at the entrance of the distribution system exceed the MRDL, or when the water supplier does not take the required samples in the distribution system, as specified in § 109.301.

   (5)  Violation of the turbidity MCL of 5 NTU based on an average for 2 consecutive days by a public water system using an unfiltered surface water source, as specified in § 109.202(a)(2).

   (6)  Violation of a treatment technique requirement for pathogenic bacteria, viruses and protozoan cysts as defined in § 109.202(c), resulting from a single exceedance of the maximum allowable turbidity limit.

   (7)  Occurrence of a waterborne disease outbreak, as defined in § 109.1 (relating to definitions), or other waterborne emergency that adversely affects the quality or quantity of the finished water including, but not limited to, the following:

   (i)  Failure or significant interruption in key water treatment processes.

   (ii)  A natural disaster that disrupts the water supply or distribution system.

   (iii)  A chemical spill or unexpected loading of possible pathogens into the source water that significantly increases the potential for drinking water contamination.

   (8)  Other violations or situations with significant potential to have serious adverse effects on human health as a result of short-term exposure, as determined by the Department on a case-by-case basis.

   (b)  Timing for a Tier 1 public notice. A public water supplier shall do the following:

   (1)  Provide a public notice as soon as possible, but no later than 24 hours after the water supplier learns of the violation or situation under subsection (a).

   (2)  Report the circumstances to the Department within 1 hour of discovery of the violation or situation in accordance with § 109.701(a)(3) (relating to reporting and recordkeeping).

   (3)  Initiate consultation with the Department as soon as possible, but no later than 24 hours after the water supplier learns of the violation or situation, to determine initial and any additional public notice requirements.

   (4)  Comply with initial and any additional public notification requirements that are established as a result of the consultation with the Department. These requirements may include the timing, form, manner, duration, frequency, and content of the initial and any repeat notices, and other actions reasonably designed to reach all persons served. The repeat notice frequency, if applicable, for a Tier 1 public notice shall be established as a result of the consultation, but may be no less often than once every 30 days as long as the violation or situation persists.

   (c)  Form and manner of a Tier 1 public notice. The form and manner used by a public water supplier shall fit the specific situation and shall be reasonably designed to reach residential, transient and nontransient users of the water system. To reach all persons served, a water supplier shall use, at a minimum, one or more of the following forms of delivery:

   (1)  Appropriate broadcast media, such as radio or television.

   (2)  Posting of the notice in conspicuous locations throughout the area served by the water system.

   (3)  Hand delivery of the notice to persons served by the water system.

   (4)  Another delivery method approved in writing by the Department.

§ 109.409.  Tier 2 public notice--form, manner and frequency of notice.

   (a)  General violation categories and other situations requiring a Tier 2 public notice. A public water supplier shall provide Tier 2 public notice for the following circumstances:

   (1)  All violations of the primary MCL, MRDL and treatment technique requirements in Subchapter B or K (relating to MCLs, MRDLs or treatment technique requirements; and lead and copper), except where a Tier 1 notice is required under § 109.408 (relating to Tier 1 public notice--form, manner and frequency of notice) or when the Department determines that a Tier 1 notice is required. The tier assignment for fluoride is not incorporated by reference. Under § 109.202(d) (relating to MCLs, MRDLs or treatment technique requirements), a public water system shall comply with the primary MCL for fluoride of 2 mg/L. As such, a public water supplier shall provide Tier 2 public notice for violation of the primary MCL for fluoride.

   (2)  Violations of the monitoring requirements in Subchapter C (relating to monitoring requirements)  or Subchapter K, when the Department determines that a Tier 2 rather than a Tier 3 public notice is required, taking into account potential health impacts and persistence of the violation.

   (3)  Failure to comply with the terms and conditions of any variance or exemption in place under Subchapter I (relating to variances and exemptions issued by the Department).

   (b)  Timing for a Tier 2 public notice. A public water supplier shall do the following:

   (1)  Report the circumstances to the Department within 1 hour of discovery of a violation under subsection (a)(1), in accordance with § 109.701(a)(3) (relating to reporting and recordkeeping).

   (2)  Provide the public notice as soon as possible, but no later than 30 days after the system learns of the violation. If the public notice is posted, the notice shall remain in place for as long as the violation or situation persists, but in no case for less than 7 days, even if the violation or situation is resolved. The Department may, in appropriate circumstances, allow additional time for the initial notice of up to 3 months from the date the system learns of the violation. The Department will not grant an extension across the board or for an unresolved violation. Extensions granted by the Department will be in writing.

   (3)  Repeat the notice every 3 months as long as the violation or situation persists, unless the Department determines that appropriate circumstances warrant a different repeat notice frequency. In no circumstances may the repeat notice be given less frequently than once per year. The Department will not allow less frequent repeat notices across the board; or for an MCL violation for total coliforms established under § 109.202(a)(2); or for a violation of a treatment technique requirement for pathogenic bacteria, viruses and protozoan cysts as defined in § 109.202(c); or for other ongoing violations. Determinations granted by the Department for less frequent repeat notices will be in writing.

   (c)  Form and manner of a Tier 2 public notice. A public water supplier shall provide the initial public notice and any repeat notices in a form and manner that is reasonably designed to reach all persons served in the required time period. The form and manner of the public notice may vary based on the specific situation and type of water system, but the public water supplier shall at a minimum meet the following requirements:

   (1)  Unless directed otherwise by the Department in writing, community water systems shall provide notice using the following forms of delivery:

   (i)  Mail or other direct delivery to each customer receiving a bill and to other service connections to which water is delivered by the public water system.

   (ii)  Any other method reasonably designed to reach other persons regularly served by the system, if they would not normally be reached by the notice required in subparagraph (i). Those persons may include those who do not pay water bills or do not have service connection addresses such as house renters, apartment dwellers, university students, nursing home patients or prison inmates. Other methods may include publication in a local newspaper, delivery of multiple copies for distribution by customers that provide their drinking water to others (such as apartment building owners or large private employers), posting in public places served by the system or on the Internet or delivery to community organizations.

   (2)  Unless directed otherwise by the Department in writing, noncommunity water systems shall provide notice using the following forms of delivery:

   (i)  Posting the notice in conspicuous locations throughout the distribution system frequented by persons served by the system, or by mail or direct delivery to each customer and service connection, when known.

   (ii)  Any other method reasonably designed to reach other persons served by the system if they would not normally be reached by the notice required in subparagraph (i). Those persons may include those served who may not see a posted notice because the posted notice is not in a location they routinely pass by. Other methods may include publication in a local newspaper or newsletter distributed to customers, use of e-mail to notify employees or students or delivery of multiple copies in central locations such as community centers.

§ 109.410.  Tier 3 public notice--form, manner and frequency of notice.

   (a)  General violation categories and other situations requiring a Tier 3 public notice. A public water supplier shall provide Tier 3 public notice for the following circumstances:

   (1)  Monitoring violations under Subchapter C or K (relating to monitoring requirements; and lead and copper), except when a Tier 1 notice is required under § 109.408 (relating to Tier 1 public notice--form, manner and frequency of notice)  or where the Department determines that a Tier 2 notice is required.

   (2)  Operation under a variance or an exemption granted under Subchapter I (relating to variances and exemptions issued by the Department).

   (3)  Availability of unregulated contaminant monitoring results, as required under 40 CFR 141.40 (relating to monitoring requirements for unregulated contaminants).

   (b)  Timing for a Tier 3 public notice.

   (1)  A public water supplier shall provide the public notice no later than 1 year after the public water system learns of the violation or situation or begins operating under a variance or exemption. Following the initial notice, the water supplier shall repeat the notice annually for as long as the violation, variance, exemption or other situation persists. If the public notice is posted, the notice shall remain in place for as long as the violation, variance, exemption or other situation persists, but in no case may the initial and annual repeat notice be posted for less than 7 days (even if the violation or situation is resolved).

   (2)  Instead of individual Tier 3 public notices, a public water supplier may use an annual report detailing all violations and situations that occurred during the previous 12 months, as long as the timing requirements of paragraph (1) are met.

   (c)  Form and manner of a Tier 3 public notice. A public water supplier shall provide the initial notice and any repeat notices in a form and manner that is reasonably designed to reach all persons served in the required time period. The form and manner of the public notice may vary based on the specific situation and type of water system, but the public water supplier shall, at a minimum, meet the following requirements:

   (1)  Unless directed otherwise by the Department in writing, community water systems shall provide notice using the following forms of delivery:

   (i)  Mail or other direct delivery to each customer receiving a bill and to other service connections to which water is delivered by the public water system.

   (ii)  Any other method reasonably designed to reach other persons regularly served by the system, if they would not normally be reached by the notice required in subparagraph (i). Those persons may include those who do not pay water bills or do not have service connection addresses such as house renters, apartment dwellers, university students, nursing home patients or prison inmates. Other methods may include publication in a local newspaper, delivery of multiple copies for distribution by customers that provide their drinking water to others (such as apartment building owners or large private employers), posting in public places or on the Internet or delivery to community organizations.

   (2)  Unless directed otherwise by the Department in writing, noncommunity water systems shall provide notice using the following forms of delivery:

   (i)  Posting the notice in conspicuous locations throughout the distribution system frequented by persons served by the system, or by mail or direct delivery to each customer and service connection, if known.

   (ii)  Any other method reasonably designed to reach other persons served by the system, if they would not normally be reached by the notice required in subparagraph (i). Those persons may include those who may not see a posted notice because the notice is not in a location they routinely pass by. Other methods may include publication in a local newspaper or newsletter distributed to customers, use of e-mail to notify employees or students or delivery of multiple copies in central locations such as community centers.

   (d)  Use of a CCR to meet the Tier 3 public notice requirements. For community water systems, the CCR required under § 109.416 (relating to CCR requirements)  may be used as a vehicle for the initial Tier 3 public notice and all required repeat notices, as long as the following conditions are met:

   (1)  The CCR is provided to persons served no later than 12 months after the system learns of the violation or situation as required under subsection (b).

   (2)  The Tier 3 notice contained in the CCR follows the content requirements under § 109.411 (relating to content of a public notice).

   (3)  The CCR is distributed following the delivery requirements under subsection (c).

§ 109.411.  Content of a public notice.

   (a)  Elements of a public notice. When a public water system is required to give public notice under this subchapter, each public notice shall include the following elements:

   (1)  A description of the violation or situation, including the contaminants of concern, and (as applicable) the contaminant levels.

   (2)  When the violation or situation occurred.

   (3)  Any potential adverse health effects from the violation or situation, including the standard language under subsection (d)(1) or (2), whichever is applicable.

   (4)  The population at risk, including subpopulations particularly vulnerable if exposed to the contaminant in their drinking water.

   (5)  Whether alternative water supplies should be used.

   (6)  What actions consumers should take, including when they should seek medical help, if known.

   (7)  What the system is doing to correct the violation or situation.

   (8)  When the water system expects to return to compliance or resolve the situation.

   (9)  The name, business address and telephone number of the water system owner, operator or designee of the public water system as a source of additional information concerning the notice.

   (10)  A statement to encourage the notice recipient to distribute the public notice to other persons served, using the standard language under subsection (d)(3), where applicable.

   (b)  Elements of a public notice for public water systems operating under a variance or exemption.

   (1)  If a public water system has been granted a variance or an exemption under Subchapter I (relating to variances and exemptions issued by the Department), the public notice shall contain the following elements:

   (i)  An explanation of the reason for the variance or exemption.

   (ii)  The date on which the variance or exemption was issued.

   (iii)  A brief status report on the steps the system is taking to install treatment, find alternative sources of water, or otherwise comply with the terms and schedules of the variance or exemption.

   (iv)  A notice of any opportunity for public input in the review of the variance or exemption.

   (2)  If a public water system violates the conditions of a variance or exemption, the public notice shall contain the ten elements listed in subsection (a).

   (c)  Presentation of a public notice.

   (1)  Each public notice required by this section shall:

   (i)  Be displayed in a conspicuous way when printed or posted.

   (ii)  Not contain overly technical language or print that is smaller than a font size of 10 points.

   (iii)  Not be formatted in a way that defeats the purpose of the notice.

   (iv)  Not contain language that nullifies the purpose of the notice.

   (2)  Each public notice required by this section shall comply with multilingual requirements, as follows:

   (i)  The public notice shall contain information in Spanish regarding the importance of the notice or contain a telephone number or address where persons served may contact the water system to obtain a translated copy of the notice or to request assistance.

   (ii)  For each non-English-speaking group other than Spanish-speaking that exceeds 10% of the consumers for systems serving at least 1,000 people or 100 consumers for systems serving less than 1,000 people, and speaks the same language other than English, the public notice shall contain information in the appropriate languages regarding the importance of the notice or contain a telephone number or address where persons served may contact the water system to obtain a translated copy of the notice or to request assistance in the appropriate language. The Department will make the final determination of which systems need to include this information.

   (d)  Standard language for a public notice. Public water systems shall include the following standard language in their public notice:

   (1)  Standard health effects language for primary MCL or MRDL violations, treatment technique violations, and violations of the condition of a variance or exemption. Public water systems shall include in each public notice appropriate health effects language. This subchapter incorporates by reference the health effects language specified in 40 CFR Part 141, Subpart Q, Appendix B (relating to standard health effects language for public notification), corresponding to each primary MCL, MRDL and treatment technique violation listed in 40 CFR Part 141, Subpart Q, Appendix A (relating to NPDWR violations and other situations requiring public notice), and for each violation of a condition of a variance or exemption, unless other health effects language is established by regulations or order of the Department. The health effects language for fluoride is not incorporated by reference. Public water systems shall include the following health effects language in each Tier 2 public notice for violation of the primary MCL of 2 mg/L for fluoride:

''This is an alert about your drinking water and a cosmetic dental problem that might affect children under nine years of age. At low levels, fluoride can help prevent cavities, but children drinking water containing more than 2 milligrams per liter (mg/L) of fluoride may develop cosmetic discoloration of their permanent teeth (dental fluorosis). Dental fluorosis, in its moderate or severe forms, may result in a brown staining and or pitting of the permanent teeth. This problem occurs only in developing teeth, before they erupt from the gums. Drinking water containing more than 4 mg/L of fluoride (the U.S. Environmental Protection Agency's drinking water standard) can increase your risk of developing bone disease.''

   (2)  Standard language for violations of monitoring requirements. Public water systems shall include the following language in their notice, including the language necessary to fill in the blanks, for all violations of monitoring requirements listed in 40 CFR Part 141, Subpart Q, Appendix A:

''We are required to monitor your drinking water for specific contaminants on a regular basis. Results of regular monitoring are an indicator of whether or not your drinking water meets health standards. During [insert compliance period], we ''did not monitor or test'' or ''did not complete all monitoring or testing'' for [insert contaminant(s)] and therefore cannot be sure of the quality of your drinking water during that time.''

   (3)  Standard language to encourage the distribution of the public notice to all persons served. Public water systems shall include in their notice the following language, if applicable:

''Please share this information with all the other people who drink this water, especially those who may not have received this notice directly (for example, people in apartments, nursing homes, schools, and businesses). You can do this by posting this notice in a public place or distributing copies by hand or mail.''

§ 109.412.  Special notice of the availability of unregulated contaminant monitoring results.

   (a)  Timing for a special notice. A community water system or nontransient, noncommunity water system required to monitor for an unregulated contaminant under 40 CFR 141.40 (relating to monitoring requirements for unregulated contaminants) shall notify persons served by the system of the availability of the results of the sampling no later than 12 months after the monitoring results are known.

   (b)  Form and manner of a special notice. The form and manner of the public notice shall follow the requirements for a Tier 3 public notice prescribed in § 109.410 (relating to Tier 3 public notice--form, manner and frequency of notice). A public water system may use an annual report or CCR to notify persons served by the system of the availability of the results of the sampling as long as the requirements under § 109.410(d) are met. The notice shall also identify a person and provide the telephone number to contact for information on the monitoring results.

§ 109.413.  Special notice for nitrate exceedances above MCL by noncommunity water systems, where granted permission by the Department.

   (a)  Timing for a special notice. A noncommunity water system granted permission by the Department in writing in accordance with 40 CFR 141.11(d) (relating to maximum contaminant levels for inorganic chemicals) to exceed the nitrate MCL shall provide notice to persons served according to the requirements for a Tier 1 notice under § 109.408(a) and (b) (relating to Tier 1 public notice--form, manner and frequency of notice).

   (b)  Form and manner of a special notice. Noncommunity water systems granted permission by the Department in writing to exceed the nitrate MCL in accordance with 40 CFR 141.11(d) shall provide continuous posting of the fact that nitrate levels exceed 10 mg/L and include the potential health effects of exposure, according to the requirements for a Tier 1 notice delivery under § 109.408(c) and the content requirements under § 109.411 (relating to content of a public notice).

§ 109.414.  Notice to new billing units or new customers.

   (a)  Requirements for community water systems. Community water systems shall give a copy of the most recent public notice for any continuing violation, the existence of a variance or exemption, or other ongoing situations requiring a public notice to all new billing units or new customers prior to or at the time service begins.

   (b)  Requirements for noncommunity water systems. Noncommunity water systems shall continuously post the public notice in conspicuous locations to inform new consumers of any continuing violation, variance or exemption, or other situation requiring a public notice for as long as the violation, variance, exemption or other situation persists.

§ 109.415.  Notice by the Department on behalf of the public water system.

   If a public water supplier fails to give notice to the public as required by this subchapter, the Department may perform this notification on behalf of the supplier of water and may assess costs of notification on the responsible water supplier.

   (1)  Public notice given by the Department on behalf of the public water system. If the Department gives the public notice required by this subchapter on behalf of the public water supplier, the Department will comply with this subchapter.

   (2)  Public water system responsibilities when public notice is given by the Department. If the Department gives public notice, the public water supplier remains responsible for ensuring that the requirements of this subchapter are met.

§ 109.416.  CCR requirements.

   This section applies only to community water systems and establishes the minimum requirements for the content of the annual CCR that each system must deliver to its customers. This report shall contain information on the quality of the water delivered by the system and characterize the risks, if any, from exposure to contaminants detected in the drinking water in an accurate and understandable manner.

   (1)  For the purposes of this section, the definitions of ''customer'' and ''detected'' established by the EPA under 40 CFR 141.151(c) and (d) (relating to definitions), respectively, are incorporated by reference.

   (2)  Each community water system shall deliver to its customers an annual CCR on the dates established by the EPA under 40 CFR 141.152 (relating to effective dates), which is incorporated by reference.

   (3)  Except as noted in subparagraphs (i)--(v), the annual report that a community water system provides to its customers shall contain all of the information, mandatory language and optional text specified by the EPA under 40 CFR 141.153 and 141.154 (relating to content of the reports; and required additional health information), which are incorporated by reference, and under 40 CFR 141, Subpart O, Appendix A (relating to regulated contaminants), which is incorporated by reference, unless other information, mandatory language or optional text is established by regulations or order of the Department. The health effects language for fluoride is not incorporated by reference. Public water systems shall include the health effects language specified in § 109.411(d)(1) (relating to content of a public notice)  for violation of the primary MCL of 2 mg/L fluoride.

   (i)  If a water system wants to use wording of its own choice in place of optional text, the water supplier shall submit the proposed wording to the Department for review and written approval prior to including it in its annual CCR. Once approved, the water supplier's wording may be used in future CCRs without further approval from the Department as long as it is not changed and is still applicable.

   (ii)  The CCR shall contain information in Spanish regarding the importance of the report or contain a telephone number or address where persons served may contact the water system to obtain a translated copy of the report or to request assistance.

   (iii)  For each non-English-speaking group other than Spanish-speaking that exceeds 10% of the residents for systems serving at least 1,000 people or 100 residents for systems serving less than 1,000 people, and speaks the same language other than English, the report shall contain information in the appropriate languages regarding the importance of the report or contain a telephone number or address where persons served may contact the water system to obtain a translated copy of the report or to request assistance in the appropriate language. The Department will make the final determination of which systems need to include this information.

   (iv)  For the purpose of defining how certain portions of a CCR shall appear, the term ''prominently display'' as used in 40 CFR 141.154(a) means that the information shall be printed either in a larger size typeface or bolded or enclosed within a border or all these so as to make the information conspicuous in comparison to the rest of the text appearing before and after the prominently displayed text. Prominently displayed text placed away from other text (such as, in a highlighted or boxed area) shall be printed no smaller than the text used elsewhere in the body of the report, excluding main or section titles.

   (v)  Information contained in a CCR shall appear in an easy-to-read format. Font sizes below 10 points or color combinations, or both, that make it difficult for persons to read and understand the information contained in the CCR may not be used.

   (4)  Report delivery and recordkeeping. Each community water system shall do the following:

   (i)  Mail or otherwise directly deliver to each customer and to the Department one copy of the annual CCR no later than the date the water system is required to distribute the CCR to its customers.

   (ii)  Make a good faith effort to reach consumers who do not get water bills. The Department will determine ''good faith'' based on those methods identified in 40 CFR 141.155(b) (relating to delivery requirements), which are incorporated by reference.

   (iii)  Submit in writing to the Department no later than 3 months after the delivery of the annual CCR:

   (A)  A certification that the annual CCR has been distributed to customers and that the information contained in the report is correct and consistent with the compliance monitoring data previously submitted to the Department.

   (B)  A description of what was done to meet the good faith effort requirement described in subparagraph (ii).

   (iv)  If another State agency or commission also regulates the community water system, submit a copy of the system's annual CCR to the other agency or commission upon the specific request of that agency or commission no later than the date the water system is required to distribute the CCR to its customers. Each State agency or commission shall determine the way it requests a copy of the system's CCR. Those agencies or commissions may include, but are not limited to, the following:

   (A)  The Pennsylvania Public Utility Commission and the Office of Consumer Advocate in the Office of the Attorney General, for water systems that are public utilities regulated under 66 Pa.C.S. (relating to Public Utility Code).

   (B)  The Department of Public Welfare for self-contained community water systems serving personal care or other group housing facilities.

   (C)  The Department of Health, for self-contained community water systems serving skilled healthcare facilities.

   (v)  Make copies of its annual CCR available to the public on request.

   (vi)  If a community water system serves 100,000 or more people, post its current year's report to a publicly accessible site on the Internet.

   (vii)  Retain copies of each annual CCR and the related information required in paragraph (3) on the premises of the system or at a convenient location near the premises for no less than 3 years after the date of its delivery to customers.

[Continued on next Web Page]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.