PA Bulletin, Doc. No. 06-902

NOTICES

Notice of Comments Issued

[36 Pa.B. 2479]

   Section 5(g) of the Regulatory Review Act (71 P. S. § 745.5(g)) provides that the Independent Regulatory Review Commission (Commission) may issue comments within 30 days of the close of the public comment period. The Commission comments are based upon the criteria contained in section 5.2 of the Regulatory Review Act (71 P. S. § 745.5b).

   The Commission has issued comments on the following proposed regulation. The agency must consider these comments in preparing the final-form regulation. The final-form regulation must be submitted within 2 years of the close of the public comment period or it will be deemed withdrawn.


Reg. No. Agency/Title Close of
the Public
Comment
Period
IRRC
Comments
Issued
57-244 Pennsylvania Public Utility Commission
Alternative Energy Portfolio Standards
36 Pa.B. 571 (February 4, 2006)
4/5/06 5/5/06

Pennsylvania Public Utility Commission Regulation #57-244 (IRRC #2519)

Alternative Energy Portfolio Standards

May 5, 2006

   We submit for your consideration the following comments on the proposed rulemaking published in the February 4, 2006 Pennsylvania Bulletin. Our comments are based on criteria in Section 5.2 of the Regulatory Review Act (71 P. S. § 745.5b). Section 5.1(a) of the Regulatory Review Act (71 P. S. § 745.5a(a)) directs the Pennsylvania Public Utility Commission (PUC) to respond to all comments received from us or any other source.

1.  General--Economic impact; Feasibility; Need; Reasonableness.

Meter aggregation

   Meter aggregation is addressed in Sections 75.12 and 75.14(e) and in both sections is limited to ''a particular rate class on contiguous and adjacent properties.'' Commentators stated that this language has negative impacts on alternative energy projects located on farms. These commentators include the Department of Agriculture, the Department of Environmental Protection, agricultural associations and individual farmers. The PUC should explain why the limits for meter aggregation in regard to rate class and property location are necessary and appropriate.

One meter versus two meters

   In the Preamble, the PUC specifically requests comments regarding the metering approaches in the regulation. The regulation allows for several metering arrangements. Subsection 75.14(a) allows single bi-directional meters and also allows two meters if the customer-generator agrees. Subsection 75.14(b) allows the Electric Distribution Company (EDC) to install new meters if existing metering is not sufficient.

   We note that commentators provided examples where one metering arrangement was better in a particular situation than another. It would appear that some degree of flexibility is needed to address individual circumstances of alternative energy generators. The PUC should consider all of the possible metering alternatives in relation to the comments and explain why the metering approach selected is the best alternative.

2.  Section 75.12. Definitions.--Consistency with statute; Duplication; Need; Clarity.

Avoided cost of wholesale power

   This definition implies an average avoided cost over the one year reporting period. Since fuel costs vary, why is an average over the whole year the most appropriate as opposed to the actual avoided cost of the billing period?

Annualized period

   This definition states ''The term has the same meaning as 'reporting period' as that term is defined in section 2 of the act.'' Since the term ''reporting period'' is defined in 73 P. S. § 1648.2 and Section 75.1 of this regulation, it is confusing to create another term that means the same thing. This definition should be deleted and the term ''reporting period'' should be used consistently throughout the regulation.

Net metering

   The statutory definition of ''net metering'' at 73 P. S. § 1648.2 addresses measurement of electricity and states:

The means of measuring the difference between the electricity supplied by an electric utility and the electricity generated by a customer-generator when the renewable energy generating system is intended primarily to offset part or all of the customer-generator's requirements for electricity.

   The regulatory definition varies from the statutory definition and includes substantive provisions regarding credits and costs. Since substantive provisions within a definition cannot be enforced, we recommend using the statutory definition and moving the cost mechanisms to the body of the regulation.

3.  Section 75.13. General provisions.--Consistency with statute; Reasonableness; Economic impact.

Subsection (a) First come, first served basis

   Under 73 P. S. §§ 1648.3(b) and (c), the EDC and Electric Generation Suppliers (EGS) are directed to meet certain minimum percentages of Tier 1 and Tier 2 alternative energy sources within certain time periods. However, this subsection states the EDC and EGS must offer net metering on a ''first come, first served basis.'' If the EDC and EGS are directed in regulation to accept customer-generators on a ''first come, first served basis,'' the EDC and EGS may not have the flexibility to meet the percentages required by the statute. The PUC should amend this subsection to allow the EDC and EGS the flexibility to meet their statutory obligations. Alternatively, the PUC should explain how the EDC and EGS could meet their statutory obligations for both Tier 1 and Tier 2 alternative energy sources if they must accept customer-generators on a ''first come, first served basis.''

Subsection (c) Kilowatt-hour for kilowatt-hour basis

   This subsection requires the customer-generator to be credited on a kilowatt-hour for kilowatt-hour basis. This will reduce the customer-generator's bill for both generation costs and distribution costs. Commentators questioned whether it is fair to reduce the customer-generator's bill for distribution costs and whether other customers are then subsidizing the customer-generator. The PUC should explain how this method is equitable.

Subsections (c), (d) and (e) Timing of compensation

   These subsections establish payment for excess kilowatt-hours generated by a customer-generator at the end of the reporting period. Commentators from the electric utilities have suggested that they should be allowed to reconcile with the customer-generator monthly rather than extending these credits to the end of the reporting period. It would appear that all parties would benefit from a more immediate reconciliation. Why did the PUC choose to extend reconciliation to the end of the reporting period?

4.  Section 75.14. Meters and metering.--Reasonableness.

Subsection (d) Customer-generator rejects ownership of alternative energy credits

   This subsection establishes provisions for when a customer-generator expressly rejects ownership of alternative energy credits. The regulation should require the EDC to fully inform the customer-generator of the potential value and options available concerning these credits before a customer-generator rejects ownership.

5.  Section 75.15. Treatment of stranded costs.--Consistency with statute; Reasonableness; Economic impact.

   Under 66 Pa.C.S.A. § 2808(a) a competitive transition charge is required if on-site generation ''significantly reduces the customer's purchases of electricity.'' Also, the competitive transition charge is defined at 66 Pa.C.S.A. § 2803 as being ''designed to recover an electric utility's transition or stranded costs as determined by the commission.''

   This section of the regulation interprets a significant reduction as ''10% or more reduction in the customer's purchase of electricity.'' How did the PUC determine that the threshold of ''10% or more'' is appropriate and will not compromise the utility's recovery of costs?

6.  Miscellaneous Clarity.

   *  The definition of ''Act'' in Section 75.1, as printed in the Pennsylvania Bulletin version, contains a cross reference that should be corrected to 73 P. S. §§ 1648.1--1648.8.

   *  In Section 75.12, the term ''equipment package'' is defined but is not used in the regulation. Therefore, this definition should be deleted.

   *  In Section 75.12, Paragraph (ii) of the ''net metering'' definition uses the confusing phrase ''supplier/provider.'' It is not clear whether this refers to an EGS, EDC or both.

   *  Some of the definitions in Section 75.1 have ''the same meaning as defined in section 2 of the act'' and include a cross reference to 73 P. S. § 1648.2. However, other definitions do not include the cross reference. For consistency, the reference to 73 P. S. § 1648.2 should be added where appropriate.

ALVIN C. BUSH,   
Chairperson

[Pa.B. Doc. No. 06-902. Filed for public inspection May 19, 2006, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.