RULES AND REGULATIONS
PENNSYLVANIA PUBLIC UTILITY COMMISSION
[52 PA. CODE CH. 75]
[36 Pa.B. 7562]
[Saturday, December 16, 2006][L-00050174]
Alternative Energy Portfolio Standards The Pennsylvania Public Utility Commission (Commission) on June 22, 2006, adopted a final rulemaking order which promotes onsite generation by customer-generators using renewable resource and eliminates barriers which may have previously existed regarding net metering.
Executive Summary
Pursuant to 73 P. S. § 1648.5, the Public Utility Commission is required to develop regulations governing net metering within this Commonwealth through a stakeholder process. This rulemaking is the final rulemaking resulting from the stakeholder process and the notice of proposed rulemaking. The regulations govern the process by which a customer-generator, as defined by the Alternative Energy Portfolio Standards Act (73 P. S. §§ 1648.1--1648.8), can begin net metering electric usage and production from alternative energy resources. The regu- lations also provide for metering capabilities that will be required and a compensation mechanism which reimburses customer-generators for surplus energy supplied to the electric grid.
Regulatory Review Commission
Under section 5(a) of the Regulatory Review Act (71 P. S. § 745.5(a)), on April 11, 2006, the Commission submitted a copy of the notice of proposed rulemaking published at 36 Pa.B. 1897 (April 22, 2006), to the Independent Regulatory Review Commission (IRRC) and the Chairpersons of the House Committee on Consumer Affairs and the Senate Committee on Consumer Protection and Professional Licensure for review and comment.
Under section 5(c) of the Regulatory Review Act, IRRC and the Committees were provided with copies of the comments received during the public comment period, as well as other documents when requested. In preparing the final-form rulemaking, the Department has considered all comments from IRRC, the House and Senate Committees and the public.
Under section 5.1(j.2) of the Regulatory Review Act (71 P. S. § 745.5a(j.2)), on November 1, 2006, the final-form rulemaking was deemed approved by the House and Senate Committees. Under section 5.1(e) of the Regulatory Review Act, the final-form rulemaking was deemed approved effective November 11, 2006.
Public Meeting held
June 22, 2006Commissioners Present: Wendell F. Holland, Chairman; James H. Cawley, Vice Chairman; Bill Shane; Kim Pizzingrilli, Statement follows; Terrance J. Fitzpatrick, Dissenting Statement follows
Final Rulemaking Re Net Metering for Customer-generators pursuant to Section 5 of the Alternative Energy Portfolio Standards Act, 73 P. S. § 1648.5; L-00050174
Implementation of the Alternative Energy Portfolio Standards Act of 2004: Net Metering; M-00051865
Final Rulemaking Order By the Commission:
The Alternative Energy Portfolio Standards Act of 2004 (the Act), includes directives that the Commission develop regulations for net metering and interconnection for customer-generators. In accordance with Section 5 of the Act, 73 P. S. § 1648.5, the Commission formally commenced its rulemaking process to establish regulations governing net metering for customer-generators by issuing a Proposed Rulemaking Order at these Dockets by Order entered November 16, 2005 (Proposed Rulemaking Order). The Commission proposed regulations establishing protocols for net metering to be used by customer-generators under the Act and sought comments on those proposed regulations. Comments have been filed by the following parties: the Independent Regulatory Review Commission (IRRC); the Department of Agriculture, the Department of Environmental Protection (DEP); The Honorable Michael L. Waugh, Pennsylvania State Senator on behalf of the Chesapeake Bay Commission; The Honorable Gibson C. Armstrong, Pennsylvania State Representative; Office of Consumer Advocate (OCA); Office of Small Business Advocate (OSBA); The Pennsylvania Farm Bureau; the Pennsylvania State Grange; the Energy Association of Pennsylvania (EAP); PECO Energy Company (PECO); PPL Electric Utilities Corporation (PPL); Citizens for Pennsylvania's Future (PennFuture); the Industrial Energy Consumers of Pennsylvania, the Met-Ed Industrial Users Group, the PP&L Industrial Customer Alliance, and the West Penn Power Industrial Intervenors (collectively, IECPA, et al.); American Mushroom Institute; Brubaker Farms; Citizens' Electric Company (Citizens') and Wellsboro Electric Company (Wellsboro); Keech Farm Service; Laurel Valley Farms; Lowe's Dairy; Mowrey's Sprucelawn Farms; Native Energy; Pine Hurst Acres; PV Now; RCM Biothane; Red Knob Farm; and Schrack Farms.
BACKGROUND Section 5 of the Act, 73 P. S. § 1648.5, provides as follows:
The commission shall develop technical and net metering interconnection rules for customer-generators intending to operate renewable onsite generators in parallel with the electric utility grid, consistent with rules developed in other states within the service region of the regional transmission organization that manages the transmission system in any part of this Commonwealth. The commission shall convene a stakeholder process to develop Statewide technical and net metering rules for customer-generators. The commission shall develop these rules within nine months of the effective date of this act.On March 3, 2005, the Commission convened an Alternative Energy Portfolio Standards Working Group (AEPS WG). The AEPS WG was established in order to provide a forum for considering the technical standards, business rules and regulatory framework necessary for Act 213's implementation. The Net Metering sub-group was formed out of the AEPS WG and was specifically tasked with developing proposed regulations governing net metering and interconnection standards.
The Net Metering sub-group met on several occasions to discuss and develop a set of proposed regulations in two parts. First, the Net Metering sub-group focused on Net Metering, the purpose of this rulemaking proceeding. Second, the Net Metering sub-group focused on interconnection standards, which is the subject of a separate rulemaking proceeding.
Participants in the Net Metering sub-group included representatives from Commission Staff, DEP, EAP, the Pennsylvania Farm Bureau, OCA, OSBA, PennFuture, the Small Generator Coalition with the Solar Energy Industries Association and several similar entities. As a result, the Net Metering sub-group had the benefit of a wide array of interests and broad expertise as it went through the process of developing proposed regulations.
At the initial meeting, participants were requested to discuss various issues which any net metering rulemaking would need to address. Following that meeting, Commission Staff issued a proposed issues list to the sub-group and called for comments to add any issues not already included and propose solutions. That issues list and call for comments was also posted on the Commission's web site. A second meeting was held to discuss the comments filed in response to the Staff generated issues list. On August 3, 2005, Commission Staff issued a proposed set of Net Metering regulations to the Net Metering sub-group and called for comments. The proposal was also posted on the Commission's web site.
Following the receipt of comments to the August 3, 2005 Staff proposal, the Commission adopted the Proposed Rulemaking Order. The Proposed Rulemaking Order was published 36 Pa.B. 571 (February 2, 2006). Comments were due 60 days from the date of publication. Comments have been received as set forth above.
DISCUSSION The Commission has reviewed each of the comments filed in this proceeding. We will address each of them as we go through the regulations seriatim.
Section 75.1. Definitions.
Many of the definitions in the proposed regulations merely state that a particular term or phrase shall have the same meaning as that set forth in the Act. In the final form regulations, we will provide the complete definition rather than just a reference to the Act. This will eliminate the need for a person to go to the Act for the definition. Also, the IRRC noted that to the extent cross references are used, they should be used consistently throughout the definitional section.
Customer-generator Positions of the Parties
The proposed definition of customer-generator adopts the definition of that term as used in the Act. That definition specifically provides that a customer-generator is a ''nonutility.'' DEP expresses the concern that the definition could be interpreted to exclude water utilities from participating in net metering. Accordingly, DEP requests that the Commission issue a clarifying statement that will remove barriers to non-electric utilities which desire to participate in net metering. Similarly, DEP requests that the Commission address the issue of net metering customers which do not meet the definition of ''customer-generator,'' but who still desire to net meter.
Disposition
We will decline to adopt DEP's suggestions in the context of this proceeding. As set forth in Section 75.11, the scope of these regulations pertains to net metering for customer-generators as mandated by Section 5 of the Act. To the extent that net metering issues exist outside of the scope of these regulations, they will be dealt with through general Commission processes and utility tariffs. We note that any utility customer, including another utility, is free to propose regulations or other Commission action to address their specific circumstances.
Section 75.11. Scope.
Positions of the Parties
PECO comments that the scope of the regulations should be clarified to state that a peak MW limitation exists so as to be consistent with the Act. In addition, PECO states that net metering under the Act should be limited to Tier I resources because Section 5 of the Act provides that net metering should be provided for customer-generators intending to operate renewable onsite generators.
Disposition
The framework of the regulations is built around the needs of customer-generators, as that term is defined in the Act. That definition is repeated in Section 75.1 of the regulations. Since the Act defines customer-generator with capacity limitations depending on the nature of the use (residential service, other service and service available during grid emergencies), there is no need to restate those limitations in Section 75.11. The limitations are inherent in the term customer-generator.
We will decline to adopt PECO's suggestion that net metering be offered only for Tier I resources. PECO is correct that Section 5 of the Act references renewable onsite generators; however we do not find that inclusion of Tier II resources is inconsistent with the Act or the provisions of the Code.
Section 75.12. Definitions.
Avoided Cost of Wholesale Power Positions of the Parties
The term is defined in the proposed regulations as the average locational marginal price (LMP)1 of energy, or its successor, over the annualized period in the applicable EDC's transmission zone. This term was taken directly from the New Jersey Model. LMP is commonly defined as the cost of providing the next MW to a specific location in the least-cost manner given transmission constraints.2 In response to our Proposed Rulemaking Order, the IRRC requested that we clarify our definition of the Avoided Cost of Wholesale Power. The IRRC also requested that we address the issue of why an average of avoided costs over the one year reporting period is the most appropriate methodology as opposed to the actual avoided cost for the specific billing period.
In comments to the Proposed Rulemaking Order, Citizens' and Wellsboro recommend that the Commission expand the definition of Avoided Cost of Wholesale Power to include an option for an EDC to base compensation for surplus generation on the actual avoided cost of wholesale power in lieu of the average annual LMP. Additionally the Companies state that it is inappropriate for the regulations to employ a proxy for the avoided cost of wholesale power when the actual avoided cost can be identified.
PPL and the EAP commented on this definition by suggesting that the ''annualized period'' be changed to ''billing period.''
Disposition
We agree with the IRRC that the definition of Avoided Cost of Wholesale Power should be clarified. We also agree with the other Parties commenting on this issue regarding the use of an actual cost of wholesale power in lieu of an annual average LMP. Additionally, we agree with the suggestion that we change ''annualized period'' to ''billing period.''
We support expanding the definition to allow an EDC to use the actual avoided cost of wholesale power when the EDC obtains the wholesale power supply to fulfill its POLR obligations through full-requirements, fixed rate contracts. Only currently effective binding contracts with identifiable negotiated rates may be relied upon to establish actual avoided cost.
By changing ''annualized period'' to ''billing period'' we are also addressing the concerns of the IRRC, the EAP and PPL. This change recognizes that compensation based upon billing cycle net deliveries will more closely reflect the avoided cost of wholesale power than an annualized average LMP. The same result occurs when we provide the option to an EDC to use actual costs when those costs are known from full-requirements, fixed rate supply contracts. Absent a known, fixed rate supply contract as described above, a billing period average LMP is an appropriate measure to determine compensation for billing period net deliveries into an EDC's system. Therefore, the definition for the Avoided Cost of Wholesale Power is revised to read as follows:
Avoided cost of wholesale power--The actual cost of wholesale power avoided by the EDC, due to the operation of the customer-generator's facility, pursuant to binding, full-requirements, fixed rate contracts, or, at the EDC's option, the average locational marginal price (LMP) of energy, or its successor, over the billing period in the applicable EDC's transmission zone.
Annualized Period Positions of the Parties
In our Proposed Rulemaking order we defined annualized period to mean the same as reporting period as contained in the Act. The IRRC recommended deletion of ''annualized period'' from § 75.12, and replacing it with the term ''reporting period'' throughout the regulation where we had previously used annualized period.
Disposition
Since this term has the same definition as ''reporting period'' as contained in Section 2 of the Act, 73 P. S. § 1648.2, we shall adopt the IRRC's recommendation.
Equipment Package Position of the Parties
The IRRC notes that equipment package is defined in the regulations but not used in the substantive provisions. The IRRC recommends that we delete this definition.
Disposition
We will adopt the IRRC's suggestion.
Meter Aggregation Most of the Parties commented on the proposed definitions of ''meter aggregation,'' ''physical meter aggregation'' and ''virtual meter aggregation.'' We will address those comments in our discussion of § 75.14.
Net metering Positions of the Parties
The IRRC recommended that the three part definition presented within our Proposed Rulemaking Order at § 75.12 be relegated to the body of the regulation. In support of this recommendation, the IRRC stated that the regulatory language includes substantive provisions regarding credits and costs, which are not appropriate for definitional sections. The IRRC recommended that the statutory definition of Net Metering at 73 P. S. § 1648.2 be used in § 75.12. PECO also suggested similar treatment.
Disposition
We agree with the IRRC and PECO and shall adopt the statutory definition found at Section 2 of the Act as the regulatory definition for Net Metering presented at § 75.12 of our regulations. The substantive provisions contained in the proposed § 75.12 are already found in §§ 75.13(c)--(f).
Section 75.13. General Provisions.
First Come, First Served Section 75.13(a) of the proposed regulations provides that EDCs shall offer net metering to customer-generators on a ''first come, first served basis.'' Several Parties expressed concerns regarding a perceived cap on the number of customer-generators that would be permitted to net meter.
Positions of the Parties
The IRRC notes that the Act mandates certain minimum percentages of Tier I and Tier II alternative energy sources for EDCs and EGSs. The IRRC expresses the concern that if net metering is restricted by a first come, first served process, the EDCs and EGSs may not be able to obtain the required percentages of Tier I energy. The IRRC suggests that this section be amended to provide flexibility to the EDCs and EGSs in order to enable them to meet the required percentages.
Both PennFuture and PV Now commented that a first come, first served limitation could result in larger Tier II resources taking up allotted net metering capacity at the expense of Tier I resources such as solar. PennFuture and PV Now recommend that the Commission act to preserve some capacity for Tier I resources.
Disposition
The use of a ''first come, first served'' process in the regulation establishes a queue for the processing of net metering requests. A secondary reason for the first come, first served process is the recognition that the physical capacity of any given distribution system to manage net metering and the potential for surplus energy to flow onto a particular distribution circuit is finite. At this point in time, it is simply impossible to project whether or when any given distribution circuit will reach its maximum limit for net metering. Accordingly, we will not establish a reserve capacity for Tier I resources in this rulemaking. In the event that a situation arises which suggests a need for such a reservation, the Commission can take appropriate action at that time.
We will also respectfully decline to adopt the IRRC's suggestion. The Act does place certain requirements on EDCs and EGSs regarding alternative energy sources. However, the bulk of those requirements will be met in the market place outside of net metering activity by customer-generators. The size and nature of the projects subject to the Act's net metering requirements are such that they are not expected to provide sufficient amounts of generation to enable EDCs and EGSs to meet the Act's requirements from those sources alone. While it is hoped that net metering projects subject to these regulations will provide some surplus alternative energy, the principal objective of the Act's net metering provision is to provide incentives to small customer-generators to use alternative energy sources.
EGS Net Metering--§§ 75.13(a) and (b) The proposed regulations expressly permit, but do not require, EGS's to offer net metering programs to their customers. Section 75.13(b) directs EDCs to develop net metering protocols which will enable EGSs to offer net metering programs over the EDCs' systems.
Positions of the Parties
DEP suggests that EDCs should be required to ''encourage'' EGSs to offer net metering. DEP also recommends setting a specific filing deadline for EDC tariffs. EAP comments that an EGS net metering program should not impact EDC distribution charges. In addition, EAP suggests that it be made clear that stranded cost treatment applies to EGS customers as well as EDC customers. Also, EAP requests that EGS programs must be consistent with the competitive metering rules of the applicable EDC territory. Finally, EAP requests that EGS net metering programs may only be offered under the two-bill, rate ready protocol. PECO suggests that § 75.13(a) should clearly state that EGSs must coordinate their programs with EDCs. PPL offers comments similar to those presented by the EAP.
Disposition
The proposed regulations purposely do not mandate specific provisions for EGS net metering programs. As set forth in the Proposed Rulemaking Order, we hope that EGSs will offer competing net metering products, but we decline to direct them to do so, leaving that type of decision to the market. Consistent with that position, we will not direct EDCs to encourage EGSs to offer net metering products. Also, once the regulations actually become effective, the Commission can direct that conforming tariffs be filed on or before a date certain by Order. We need not specify a time within the regulations.
The comments of the EAP, PECO and PPL are well founded. First, Section 2808(a) of the Code does not relieve a customer of its stranded cost obligation when the customer is served by an EGS. Nothing in this rulemaking conflicts with that provision or changes it in any way. Accordingly, while the comments on this issue are correct, we do not find a need to address it in this rulemaking.
Second, it will be necessary for any EGS offering a net metering product to coordinate its program with the EDC providing distribution services. To that end, we directed each EDC to establish protocols enabling EGSs to offer net metering. Issues such as the two-bill, rate ready protocol and compliance with competitive metering programs can be readily addressed in the net metering protocols directed in § 75.13(b). Those types of issues will be better addressed by EGSs and EDCs as implementation occurs and the EDCs develop the necessary protocols in their tariffs. They do not readily lend themselves to regulatory treatment. Accordingly, we will not address them in these regulations. We note that those protocols must be approved by the Commission through the tariff process.
Credit and Compensation--§ 75.13(c) and (d) (proposed §§ 75.13(c)--(e))
Several Parties, including the IRRC, raised concerns regarding the credit methodology and cash-out provisions of the proposed regulations. The concerns regarding credit issues are more fully discussed in relation to § 75.14(a) and (b) relating to metering. Concerns regarding the cash-out provisions for excess electricity supplied to the grid have already been addressed in our discussion of the definition of Avoided Cost of Wholesale Energy, above. As noted there, we have adopted the recommendation of the IRRC, the EAP and PPL and moved to a billing period payment rather than an annual reconciliation as originally proposed. We have changed former § 75.13(c) to recognize the revised treatment of meter aggregation programs. We have revised § 75.13(d) to provide for a monthly cash-out for excess generation supplied by cus- tomer-generators.
Insurance Requirements--§ 75.13(j)
(proposed § 75.13(k))Positions of the Parties
Citizens and Wellsboro request that proposed § 75.13(k)(now § 75.13(j)) be amended to require insurance for certain projects above a stated generating capacity limit.
Disposition
We will decline to adopt an insurance requirement at this time. EDCs and EGSs offering net metering programs may encourage customer-generators who decide to net meter to obtain insurance, but we will not mandate an insurance requirement. As the Commission developed the proposed regulations, an overwhelming majority of comments strongly recommended against such a requirement. Citizens and Wellsboro have added nothing to the discussion which convinces us that such a requirement is necessary.
§ 75.14. Meters and Metering
Single Bi-Directional Meter & Dual Meter Arrangements--§ 75.14(a)(b) Under § 75.14(a), the proposed regulations require that a customer-generator facility used for net metering be equipped with a single bi-directional meter that can measure and record the flow of electricity in both directions at the same rate. A dual meter arrangement may be substituted for a single bi-directional meter if the customer-generator agrees. Subsection (b) provides that if the customer-generator's existing metering equipment does not meet these requirements, the EDC must install new metering equipment at the EDC's expense.
Positions of the Parties
The EAP, Citizen's, Wellsboro, PPL, PECO and OSBA support a dual meter approach as opposed to the single bi-directional approach provided in Subsection (a) of the proposed regulations. Citizen's and Wellsboro note that nothing in the Act mandates that the Commission adopt a single meter approach to net metering. PECO adds that the customer-generator should not have the ultimate authority as to whether or not the dual meter arrangement is utilized.
As explained by PPL, under the dual meter approach, the customer is billed for delivery service in the same way that any other customer taking service on the same Rate Schedule is billed. The customer-generator is separately compensated for generation, Credits and any other attributes. The single-meter approach involves the netting of kilowatt-hours delivered to the customer and kilowatt-hours generated by the customer to produce a single bill calculated using delivery rates. EAP believes that the single meter approach results in all other ratepayers unreasonably subsidizing the distribution service for customer-generators. The OSBA adds that under the single meter approach, customer-generators would pay the CTC and ITC only on the difference between the kWh delivered to the customer-generator by the EDC and the kWh sent by the customer-generator over the EDC's distribution system. Since the customer-generator would pay the CTC or ITC on too few kWhs, the EDC would experience a shortfall. OSBA recommends that Subsection (a) be modified to ensure that the metering equipment must make a separate recording of the flow of electricity in each direction.
DEP recommends that the Commission establish a required meter accuracy standard in this rulemaking. DEP also recommends removing the phrase ''and record'' from the metering requirements out of a concern that this could lead to a misinterpretation of the section.
The IRRC suggests that the Commission should consider all of the possible metering alternatives in relation to the comments and explain why the metering approach selected is the best alternative.
Disposition
In response to the IRRC recommendation, the Commission reviewed the metering approach provided in the proposed regulations recommending a single bi-directional meter. The approach in the proposed regulations is a one-for-one kWh credit generated from the customer-generator. This methodology lends itself to a single, bi-directional meter approach. We also note that due to the treatment of stranded costs in § 75.15, the loss of any stranded costs would be minimal. In addition, certain minimum charges applicable to specific rate schedules will still be paid.
In the event that the EDC's meter would not be capable of operating in a bi-directional mode, then a dual meter application would be permitted at the EDC's expense. Bi-directional meters provide an immediate impact on the customer's bill while reducing administrative costs, an important factor in the successful implementation of net metering. The intent of the Act is to encourage the increased use of alternate energy and provide an immediate positive feedback to the customer-generator. Also, the intent of this Section is to provide some flexibility for the meter arrangement. However, the credit mechanism remains a kWh credit per kWh produced for the billing cycle. We note that this is consistent with the New Jersey credit mechanism.
With regard to DEP's comments regarding the phrase ''and record,'' we do not share the concern that the phrase will lead to a misinterpretation of the Section. The Regulations specifically state that the credit mechanism is a kWh-for-kWh credit. Thus, the ability to record energy produced and used will not affect the credit mechanism, but may become important in determining the production of renewable energy credits. We also note that the Commission's Regulations governing meter accuracy currently found at 52 Pa. Code §§ 57.20 and 57.21 remain in force. Accordingly, there is no need for an additional meter accuracy standard in this chapter.
Alternative Energy Credit Ownership--§ 75.14(d) Under § 75.14(d), the proposed regulations provide that in cases where a customer-generator expressly rejects ownership of the alternative energy credits, the EDC may secure ownership by supplying additional metering equipment if necessary.
Positions of the Parties
The OCA and the IRRC recommend that it must be made clear in the regulation that any solicitation from the EDC requesting that a customer give up title to credits can only be made in the context of a full and accurate description of the options open to the customer. The OCA and the IRRC suggest that the proposed regulations should be revised to incorporate a requirement that the EDC fully inform the customer of the value of the credits and other options for the credits.
PennFuture and PV Now comment that the regulations should clarify that the owner of the customer-generator facility, who invested in the technology, is the default owner of the alternative energy credits produced, unless the owner enters into a contract to do otherwise.
Citizens, Wellsboro, EAP, and PPL all suggest that any alternative energy credits produced by customer-generators should be owned by the customer-generator's EDC. The Parties state that once a kWh for kWh credit methodology is established, ownership of alternative energy credits should inure to the benefit of the EDC and its ratepayers.
Disposition
The OCA and the IRRC have raised legitimate concerns. We will add a provision to the regulations requiring EDCs, prior to gaining title to alternative energy credits, to fully inform customer-generators of the potential value of those credits and other options for disposing of those credits. The Commission will modify the regulations accordingly.
PennFuture and PV Now are correct that the regulations as proposed assume that the customer-generator is the owner of any renewable energy credits produced by the onsite generation. (§§ 75.13(h) and 75.14(c) and (d)). While those two Parties recommend a change in the regulations to provide that the owner of the generation facility owns the credits, we will decline to do so. The focus of these regulations is on customer-generators and how they may net meter pursuant to the Act. Nothing in the regulations or the Act precludes a customer-generator from divesting any ownership interest in renewable energy credits produced. In fact, § 75.13(h) expressly provides for those situations. We would expect that in the circumstances described by PennFuture and PV Now, the parties to the transaction would have some form of written agreement governing credit ownership. Such an arrangement would be fully consistent with the Regulations as currently proposed.
We will also decline to provide that ownership of alternative energy credits will be vested in the customer-generator's EDC. Ownership of alternative energy credits produced by onsite generation properly rests with the customer-generator unless a different arrangement has been agreed to by the customer-generator.
Meter Aggregation--§ 75.14(e) In the Proposed Rulemaking Order we proposed a restrictive definition of meter aggregation, limiting aggregation to a single rate class and to adjacent and contiguous properties owned and operated by a customer-generator. (See, §§ 75.12 and 75.14(e)). The IRRC re- quested an explanation of the limits for meter aggregation regarding rate class and property locations as well as the necessity and appropriateness of the limitations.
Positions of Parties
This section of the regulations also sparked the interest of seventeen commenters. The comments were in disagreement with the restrictive definition of meter aggregation and the meter location issue. We heard from farmers which operate anaerobic digesters such as Red Knob Farms, Mowrey's Sprucelawn Farms, Brubaker Farms, Laural Valley Farms, Keech Farm Services, LTD, Lowes Dairy, Pine Hurst Acres, Schrack Farm Partnership, and the American Mushroom Institute. Additional support for modifications were advanced by RCM Biothane, PV Now, Native Energy, PennFuture, DEP, the Pennsylvania Grange, the Pennsylvania Farm Bureau, the Chesapeake Bay Commission through Senator Waugh, Representative Armstrong and the Department of Agriculture.
Alternatively, EAP, Exelon, PPL and Citizens Electric, and Wellsboro recommended that the provision for virtual meter aggregation be deleted in its entirety and providing only for physical meter aggregation at the customer-generator's expense.
Disposition
The fundamental intent of Act is the expansion and increased use of alternative energy systems and energy efficiency practices. Regulatory and economical barriers have been in place that prevented systems such as anaerobic digesters from being more economical or further developed. This rulemaking provides an opportunity to advance the use of these alternative energy systems in a way that will benefit the customer-generator, ratepayers and the environment by allowing exceptions for this important class of customers. Accordingly, we will permit virtual meter aggregation for customer-generators.
As pointed out by the Pennsylvania Farm Bureau, the proposed definition and application of virtual meter aggregation do not fit the reality of a typical Pennsylvania farm operation that has adequate animal units to produce required amounts of manure for anaerobic digesters to operate efficiently. The Pennsylvania Department of Agriculture recently surveyed 26 farms in the state that either have manure digesters operating, digesters under construction or in the planning stages. Out of the 21 farm operations that responded to the survey, there are 148 individual meters involved, which represents an average of seven meters per farm.
Additionally, a study completed by Dr. James Cobb from the University of Pittsburgh, in 2005, titled Anaerobic Digesters on Dairy Farms, indicates a potential of 50-60 digesters being developed on Pennsylvania dairy farms in the foreseeable future. The digesters will not be developed to this extent if the proposed metering aggregation restrictions remain in place. In addition, PennFuture directed our attention to other types of projects which could meet the requirements for customer-generator net metering, but would be unable to avail themselves of virtual meter aggregation under the regulations as proposed.
Penn Future's comments are well directed and provide language that will help alternative generation expand as envisioned by the Act. First, the definition of ''meter aggregation'' should be changed to allow aggregation regardless of rate class on properties owned and/or leased and operated by a customer-generator. We have changed the regulations accordingly. Second, the issue of multiple rate classes can be addressed by first applying onsite generation to the meter through which the system feeds. Any excess energy generated would be credited equally to the other service meters on the farm location, allowing each meter to maintain its current rate class. Additionally, we will modify the language in § 75.14(e) from ''contiguous and adjacent properties owned and operated by the customer-generator'' to owned and /or leased parcels within two miles of the customer-generator's property lines to allow customer-generators to participate in net metering on a better economic footing. The customer-generator must be served by one EDC.
§ 75.15. Treatment of Stranded Costs
Positions of the Parties
In our Proposed Rulemaking Order we stated that if a net metering small commercial, commercial or industrial customer's annual self-generation resulted in a 10% or more reduction in distribution services and electricity purchases from the EDC when compared with the prior annual period, that net metering customer shall be responsible for its share of stranded costs, based upon the prior annual period, or base period if applicable. In its comments the IRRC questioned how the threshold of 10% or more was determined to be appropriate and would not compromise the utility's recovery of costs. The OSBA commented that 10% was not a de minimus amount and would result in other customers subsidizing the customer-generators' stranded cost obligation. In addition, the OSBA commented that a customer-generator would only pay stranded costs on the difference between kWh delivered and kWh used. According to the OSBA, this would result in a shortfall to the EDC which would have to be recovered from other ratepayers.
Several Parties commented that the stranded cost obligation should be waived altogether or receive some type of credit tied to the alternative generation. These included the Department of Agriculture, Native Energy, the Pennsylvania Farm Bureau, Pine Hurst Acres, PV Now, RCM Biothane, and Schrack Farms.
Disposition
As we set forth in the Proposed Rulemaking Order, when onsite generation results in ''significantly'' reduced purchases, a proportionate share of stranded cost recovery is mandated by Section 2808(a) of the Public Utility Code (Code), 66 Pa.C.S. § 2808(a). The OSBA's comments regarding a shortfall in stranded cost recovery completely ignores the operation of Section 2808(a) of the Code. Also, Section 2808(a) does not provide for a ''de minimus'' standard. The standard is a significant reduction in usage as a result of onsite generation. During the Commission's restructuring implementation, most of the EDCs issued tariff provisions which stated that a significant reduction in use for purposes of Section 2808(a) meant a reduction in use of 10% or more. Since the time those tariff provisions have been in effect, the Commission has received no complaints that such a threshold has operated to the detriment of any particular rate class or EDC. That is the basis for our use of the 10% threshold here.
Because of the requirements of Section 2808(a) of the Code we have no authority to adopt those comments which recommend a waiver or credit of stranded costs for customer-generators. Similarly, given our experience with the use of the 10% threshold, we decline to alter that threshold in this rulemaking.
Cost Recovery
Positions of the Parties
Several Parties have requested that to the extent that costs are incurred by EDCs for the provision of net metering, a section should be added to this Chapter which expressly provides that such costs are recoverable under Section 3(a)(3) of the Act, 73 P. S. § 1648.3(a)(3). These Parties include Citizens, Wellsboro, EAP and PPL.
Disposition
We will not address this issue in the context of this rulemaking. Section 3(a)(3) of the Act provides a description of the categories of recoverable costs and the mechanism available to seek recovery. This proceeding is not the appropriate vehicle to address issues arising under that Section of the Act.
CONCLUSION The modifications discussed herein address the concerns of the Parties and are in the public interest. We have reviewed all of the comments and, to the extent a Party's position was not adopted, it was nonetheless carefully considered. We wish to compliment all those who filed comments on the quality of the comments. They were extraordinarily helpful in arriving at a final rulemaking that is consistent with the Act, the Code and fulfills the Act's intent to remove barriers to net metering and provide appropriate treatment to customer-generators who wish to net meter.
Accordingly, under section 501 of the Public Utility Code, 66 Pa.C.S. §§ 501; section 5 of the Alternative Energy Portfolio Supply Act of 2004 (73 P. S. § 1648.5); sections 201 and 202 of the act of July 31, 1968, (P. L. 769 No. 240) (45 P. S. §§ 1201 and 1202), and the regulations promulgated thereunder in 1 Pa. Code §§ 7.1, 7.2 and 7.5; section 204(b) of the Commonwealth Attorneys Act (71 P. S. 732.204(b)); section 5 of the Regulatory Review Act (71 P. S. § 745.5) and section 612 of The Administrative Code of 1929 (71 P. S. § 232) and the regulations promulgated thereunder at 4 Pa. Code §§ 7.231--7.234, the Commission adopts the regulations at 52 Pa. Code §§ 75.1--75.15, as noted above and as set forth in Annex A; Therefore,
It Is Ordered that:
1. The regulations of the Commission, 52 Pa. Code, are amended by adding §§ 75.1 and 75.11--75.15 to read as set forth in Annex A.
2. The Secretary shall submit this order and Annex A for review by the designated standing committees of both houses of the General Assembly, and for review and approval by IRRC.
3. The Secretary shall submit this order and Annex A to the Office of Attorney General for approval as to legality.
4. The Secretary shall submit this order and Annex A to the Governor's Budget Office for review of fiscal impact.
5. The Secretary shall certify this order and Annex A and deposit them with the Legislative Reference Bureau for publication in the Pennsylvania Bulletin.
6. A copy of this order and Annex A be served upon the Department of Environmental Protection, all jurisdictional electric utility companies, licensed electric generation suppliers, the Office of Consumer Advocate, the Office of Small Business Advocate and all Parties filing comments in this proceeding.
7. These regulations shall become effective upon publication in the Pennsylvania Bulletin.
8. The contact persons for this rulemaking are Calvin Birge, Bureau of Conservation, Economics and Energy Planning, (717) 783-1555 (technical), and H. Kirk House, Office of Special Assistants, (717) 772-8495 (legal).
JAMES J. MCNULTY,
Secretary(Editor's Note: For the text of the order of the Independent Regulatory Review Commission, relating to this document, see 36 Pa.B. 782 (November 18, 2006).
Fiscal Note: Fiscal Note 57-244 remains valid for the final adoption of the subject regulations.
Implementation of the Alternative Energy Portfolio Standards Act of 2004 Public Meeting June 22, 2006
JUN-2006-OSA-0174*
M-00051865
L-00050174
Dissenting Statement of Commissioner
Terrance J. FitzpatrickThis matter involves a Final Rulemaking Order that adopts regulations governing net metering pursuant to the Alternative Energy Portfolio Standards Act, (''Act'') 73 P. S. § 1648.1 et seq. Because I disagree with the resolution of three issues in the regulations, I respectfully dissent.
Single Meter versus Dual Meter
The regulations adopted by the majority endorse a single meter approach to net metering, under which a customer-generator's bill is credited on a kWh-for-kWh basis. The important point here is not so much the mechanics of how the metering works, but the impact on the customer-generator's bill. Under this single meter approach, the customer-generator's bill is credited not just for the energy it sells back to the utility, but also for the volumetric charges for the customer's use of the distribution system when the customer-generator takes electricity from the grid. This credit to distribution charges may properly be characterized as a subsidy--the customer-generator avoids paying for its use of the grid and that burden falls on the utility's shareholders, and, in the longer term, on the utility's general body of customers.
The definition of ''net metering'' in the Act describes it simply as the ''means of measuring'' the difference between the electricity supplied by the utility and the electricity generated by a customer-generator. 73 P. S. § 1648.2 (definition of ''net metering''). Nothing in this definition suggests that customer-generators should be excused from paying for their use of the grid.
The Final Rulemaking Order (p. 17) states that the single meter policy is consistent with the net metering policy adopted in New Jersey. That fact is relevant in that the Act provides, among other things, that the Commission should look to be consistent with rules adopted by other states in the region. 73 P. S. § 1648.5. The Act does not, however, mandate that we march in lockstep with any other particular state, so the policies we adopt still must make sense in light of the language of the Act. In my view, nothing in the Act suggests that the use of the distribution system by customer-generators should be subsidized by others.
I agree with the comments of those parties who argue for a dual meter approach to net metering, under which a customer-generator's usage of electricity taken from the utility's grid would be measured separately from the electricity generated by the customer-generator. This would allow the utility to collect distribution charges on electricity supplied to the customer-generator, while still crediting the customer-generator for the electricity it generates. This approach has the added benefit of measuring the actual amount generated by the customer-generator for purposes of establishing the value of tradable alternative energy credits.
Virtual Meter Aggregation
The issue here is how to determine the number of accounts under which a customer-generator will be billed by the utility. This is important because, under rate schedules approved by this Commission, utilities recover some of their costs by charges on each account. Thus, if the Commission now adopts a policy that reduces the number of accounts, this impairs the ability of utilities to collect their costs. The governing principle in this area has been that each physical point of service is a separate account, unless usage on an established circuit grows to the point that the utility, for its own convenience, establishes an additional point of service to relieve the circuit. In addition, the settled practice is that a customer can only consolidate its number of accounts if it bears the expense of physically rewiring circuits to establish a single point of service.
The final regulations adopted by the Majority waive these principles for customer-generators. Under the ''virtual meter aggregation'' policy in these regulations, customer-generators will be permitted to establish a single account for parcels of land owned or leased by the customer-generator within two miles of the customer-generator's property lines. This extends the virtual aggregation policy set out in the proposed regulations, under which operations on contiguous parcels owned by the customer-generator would have been permitted to establish a single account.
The Final Rulemaking Order (p. 21) describes its action on this issue as removing ''regulatory and economic barriers'' that have prevented development of customer-generation. That is true only in the sense that withholding preferential treatment can be characterized as a ''regulatory or economic barrier.'' The established principles governing meter aggregation are designed to allow utilities to recover costs and to apportion these costs equitably among customers. The Final Rulemaking Order fails to acknowledge that the benefits it bestows on customer-generators result in additional burdens placed on others--utility shareholders and, in the long run, on the general body of customers. Nothing in the Act suggests that established meter aggregation principles should be waived to provide additional subsidies for customer-generators.
Ownership of Alternative Energy Credits
The final regulations assume that ownership of the alternative energy credits arising from net-metered generation rests with the customer-generators, unless otherwise agreed to by the customer-generator and the utility. This is assumed despite the statutorily-compelled purchase of this energy by the utility, and the subsidies and preferential treatment granted to customer-generators in the final regulations.
Under all of the circumstances, I believe that the utilities should be deemed to own the credits for the benefit of the general body of customers. Placing ownership of the credits with the utility would offset, to some extent, the burdens placed on other customers by the subsidies and preferences described above in the final regulations.
Conclusion
The General Assembly has determined in the Act that alternative forms of electric generation should be encouraged. In order to do so, it required that retail suppliers of electricity (utilities and competitive electric suppliers) purchase increasing percentages of alternative energy as part of their portfolio of supplies used to serve end-use customers. This assures that there will be a demand for alternative energy, even though alternative energy is generally more expensive than energy from conventional sources. Further, the General Assembly has required electric utilities to provide interconnection and net metering to customer-generators of alternative energy. While these measures can be expected to raise electricity prices, the General Assembly has determined that this price is justified in order to encourage development of alternative energy.
The final regulations regarding net metering adopted by the Commission grant subsidies and preferences for customer-generators beyond those established in the Act. The burden of paying for these policies will ultimately fall upon other customers during a period when rising fuel prices and more stringent environmental controls are already reversing a two-decade long trend of static electricity prices. For these reasons, I respectfully dissent.
Statement of Commissioner Kim Pizzingrilli
Implementation of the Alternative Energy Portfolio Standards Act of 2004--Net Metering Public Meeting June 22, 2006
JUNE-2006-OSA-0174*
M-00051865
L-00050174Today the Commission issues a final rulemaking relating to net metering for customer-generators intending to operate renewable onsite generators in parallel with electric distribution utilities' distribution systems. This rulemaking is another important component of the Commission's mission to successfully implement the Alternative Energy Portfolio Standards Act (AEPS). The regulations are the culmination of an extensive proceeding, which included an AEPS working group focused on net metering as well as significant input on proposals prior to the initiation of the formal proposed rulemaking.
When promulgating any set of new regulations, particularly ones of a highly technical nature such as these, it is imperative that we attempt to strike a balance on the competing perspectives on contentious issues. Here, in large part, we have successfully struck the necessary balance and I commend our staff and the parties to this proceeding for their efforts.
However, as is sometimes the case, the Commission was not able to find common ground on all issues raised by the parties. Here, in my opinion, the issue of one single bi-directional meter versus the use of dual meters is such an issue. Despite the existence of valid arguments on both sides of this matter, ultimately the Commission has determined to require the use of a single meter. While I will vote in support of these regulations, I share the concerns raised by Commissioner Fitzpatrick on this matter particularly relative to the single meter approach resulting in a subsidy provided to customer-generators by the electric distribution companies' other ratepayers.
In accordance with the Regulatory Review Act, the final regulations now require approval of the House and Senate Standing Committees, the Independent Regulatory Review Commission and the Attorney General prior to final publication.
[Continued on next Web Page] _______
1 LMP was instituted in PJM in April 1998. Before then, there had been a single system price, the market-clearing price (MCP).
2 See, National Regulatory Research Institute, publication 04-16, Commissioner Primer, LMP, at p. 9.
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.