NOTICES
PENNSYLVANIA PUBLIC UTILITY COMMISSION
Electric Utilities
[39 Pa.B. 390]
[Saturday, January 17, 2009]A-2009-2082652. PPL Electric Utilities Corporation. Application of PPL Electric Utilities Corporation for approval of the siting and construction of the proposed Pennsylvania portion of the Susquehanna-Roseland Power Line Project in portions of Lackawanna, Luzerne, Monroe, Pike and Wayne County, Pennsylvania.
Formal protests and petitions to intervene must be filed in accordance with 52 Pa. Code (relating to public utilities). Filings must be made with the Secretary of the Pennsylvania Public Utility Commission (Commission), P. O. Box 3265, Harrisburg, PA 17105-3265, with a copy served on the applicant on or before February 27, 2009. The documents filed in support of the application are available for inspection and copying at the Office of the Secretary between 8 a.m. and 4:30 p.m., Monday through Friday, and at the applicant's business address.
Applicant: PPL Electric Utilities Corporation
Through and By Counsel: Paul E. Russell, Associate General Counsel, PPL Services Corporation, Two North Ninth Street, Allentown PA 18106
and
David B. MacGregor, Esquire, Post & Schell, P.C., Four Penn Center, 1600 John F. Kennedy Boulevard, Philadelphia, PA 19103-2808
____
Electric Utilities A-2009-2082832. PPL Electric Utilities Corporation. Application of PPL Electric Utilities Corporation for a finding that a building to shelter control equipment at the 500-230 kV substation to be constructed in the Borough of Blakely, Lackawanna County, PA, is reasonably necessary for the convenience or welfare of the public.
Formal protests and petitions to intervene must be filed in accordance with 52 Pa. Code (public utilities). Filings must be made with the Secretary of the Pennsylvania Public Utility Commission, P. O. Box 3265, Harrisburg, PA 17105-3265, with a copy served on the applicant on or before February 27, 2009. The documents filed in support of the application are available for inspection and copying at the Office of the Secretary between 8 a.m. and 4:30 p.m., Monday through Friday, and at the applicant's business address.
Applicant: PPL Electric Utilities Corporation
Through and By Counsel: Paul E. Russell, Associate General Counsel, PPL Services Corporation, Two North Ninth Street, Allentown, PA 18106
and
David B. MacGregor, Esquire, Post & Schell, P.C., Four Penn Center, 1600 John F. Kennedy Boulevard, Philadelphia, PA 19103-2808
Application of PPL Electric Utilities Corporation A-2009-2082652--For Approval of the Siting and Construction of the Proposed Pennsylvania Portion of the Susquehanna-Roseland Power Line Project in Portions of Lackawanna, Luzerne, Monroe, Pike and Wayne Counties, PA.
A-2009-2082832--For a Finding that a Building to Shelter Control Equipment at the 500-230 kV Substation to be constructed in the Borough of Blakely, Lackawanna County, PA, is Reasonably necessary for the convenience or welfare of the public.
Notice This is to inform you that an Initial prehearing conference on the previous-captioned case will be held as follows:
Type: Initial Prehearing Conference Date: Friday, March 6, 2009 Time: 10 a.m. Location: Hearing Room 1
Plaza Level
Commonwealth Keystone Building
400 North Street
Harrisburg, PA 17120
Presiding: Administrative Law Judge Susan D. Colwell
P. O. Box 3265
Harrisburg, PA 17105-3265
Phone: (717) 783-5452
Fax: (717) 787-0481Person with a disability, who wish to attend the prehearing, may be able to make arrangements for your special needs. Call the scheduling office at the Commission at least 2 business days prior to the conference.
* Scheduling Office: (717) 787-1399
* AT&T Relay Service number for persons who are deaf or hearing-impaired: (800) 654.5988
JAMES J. MCNUTLTY,
Secretary
[Pa.B. Doc. No. 09-96. Filed for public inspection January 16, 2009, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.