NOTICES
Federal Consistency under the Coastal Zone Management Act
[42 Pa.B. 2251]
[Saturday, April 21, 2012]The United States Army Corps of Engineers (Corps) published a notice regarding the reissuance of 48 Nationwide Permits (NWPs) and the issuance of two new NWPs at 77 FR 10184 (February 21, 2012). Some of the NWPs authorize discharges into or encroachments upon waters of the United States in this Commonwealth. These NWPs became effective on March 19, 2012. The Corps' Baltimore District Office has also published Regional Conditions that apply to the NWPs within this Commonwealth on March 19, 2012 (SPN 12-32).
The issuance of NWPs is a Federal action subject to review for consistency with the enforceable policies of the Commonwealth's Coastal Resources Management Program (CRM). The Commonwealth is required under 15 CFR Part 930, Subpart C (relating to consistency for Federal agency activities) to make its Coastal Zone Management Act (CZMA) determination by May 21, 2012 (77 FR 10184). CRM is reviewing these NWPs and their Regional Conditions for Pennsylvania and is soliciting comments as part of the CZMA Federal consistency review process.
Additionally, Regional Conditions for NWPs 3, 13, 19, 35 and 36 published by the Corps' Huntingdon District on March 19, 2012, (LRH-201100098) for the State of Ohio are subject to CRM review under the Commonwealth's National Oceanic and Atmospheric Administration approved (January 9, 2007) interstate consistency program.
Following review of the NWPs and the Regional Conditions proposed by the Corps' Baltimore and Huntington Districts, the Department of Environmental Protection (Department) proposes to make a determination that the NWPs are consistent with the enforceable policies of the Commonwealth's CRM program.
CRM's enforceable policies can be found on the Department's web site at http://www.dep.state.pa.us/river/reference/reference.htm, select Program Guidance Document from the ''Downloadable Materials'' section. CRM's enforceable policies are described in Chapter 2—Coastal Zone Policy Framework.
For further information concerning the NWPs, contact the United States Army Corps of Engineers, David Olson at (202) 761-4922 or access the Corps' Regulatory Home Page at http://www.usace.army.mil/CECW/Pages/cecwo_ reg.aspx.
Persons wishing to comment on the proposed CRM Federal consistency determination of the NWPs or Regional Conditions are invited to do so within 30 days of this notice. Prior to final action on this Federal activity, consideration will be given to any comments, suggestions or objections which are submitted in writing by May 21, 2012. Comments should be submitted to Karen Price, Interstate Waters Office, P. O. Box 8465, Harrisburg, PA 17105-8465. Requests should contain the name, address and telephone number of the person commenting, identification of the notice to which the comments are addressed and a concise statement of comments, objections or suggestions. No comments submitted by facsimile transmission will be accepted.
Comments may be submitted electronically to the Department at kprice@pa.gov. A subject heading of the proposal must be included in each transmission. Comments submitted electronically must also be received by the Department by May 21, 2012.
The Corps is reissuing 48 of the 49 NWPs, general conditions and definitions with some modifications and 2 new NWPs, 3 new general conditions and 3 new definitions. These final NWPs were effective on March 19, 2012.
Except in instances where the Pennsylvania Statewide Programmatic General Permit (PASPGP-4) issued by the Corps in July 2011 does not apply, the Corps has indicated it will suspend these NWPs. This suspension will preserve the one-stop State and Federal permitting process the Corps presently offers under PASPGP-4 while maintaining the current level of protection provided to our wetlands and water resources.
Nationwide Permits
1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Associated Intake Structures 8. Oil and Gas Structures 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys 11. Temporary Recreational Structures 12. Utility Line Activities 13. Bank Stabilization 14. Linear Transportation Projects 15. United States Coast Guard Approved Bridges 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20. Response Operations for Oil and Hazardous Substances 21. Surface Coal Mining Activities 22. Removal of Vessels 23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 25. Structural Discharges 26. [Reserved] 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 29. Residential Developments 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access and Dewatering 34. Cranberry Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Commercial and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. [Reserved] 48. Commercial Shellfish Aquaculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects
Nationwide Permit General Conditions
1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Bird and Bald and Golden Eagle Permits 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Pre-Construction Notification Federal consistency of the NWPs is also conditional upon their certification under section 401 of the Federal Clean Water Act (33 U.S.C.A. § 1341) by the Department of Environmental Protection, Bureau of Waterways Engineering and Wetlands, Division of Wetlands, Encroachments and Training. A separate notice regarding the Section 401 Water Quality Certification was published at 42 Pa.B. 2101 (April 14, 2012).
MICHAEL L. KRANCER,
Secretary
[Pa.B. Doc. No. 12-743. Filed for public inspection April 20, 2012, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.