Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 14-2176

NOTICES

SUSQUEHANNA RIVER BASIN COMMISSION

Public Hearing

[44 Pa.B. 6739]
[Saturday, October 18, 2014]

 The Susquehanna River Basin Commission (Commission) will hold a public hearing on November 6, 2014, at 2:30 p.m. at the Pennsylvania State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg, PA. The public hearing will end at 5 p.m. or at the conclusion of public testimony, whichever is sooner. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. The projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for December 5, 2014, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is November 17, 2014.

 For further information contact Jason Oyler, Regulatory Counsel, (717) 238-0423, Ext. 1312, fax (717) 238-2436.

 Information concerning the applications for these projects is available at the Commission Water Resource Portal at www.srbc.net/wrp. Materials and supporting documents are available to inspect and copy in accordance with the Commission's Access to Records Policy at www.srbc.net/pubinfo/docs/2009-02%20Access%20to%20Records%20Policy%209-10-09.PDF.

Supplementary Information

 The public hearing will cover the following projects:

Projects Scheduled for Action:

 1. Project Sponsor and Facility: Anadarko E&P Onshore, LLC (Pine Creek), Watson Township, Lycoming County, PA. Application for renewal of surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 20101201).

 2. Project Sponsor and Facility: EQT Production Company (West Branch Susquehanna River), Greenwood Township, Clearfield County, PA. Application for surface water withdrawal of up to 0.900 mgd (peak day).

 3. Project Sponsor and Facility: Geary Enterprises (Buttermilk Creek), Falls Township, Wyoming County, PA. Application for renewal of surface water withdrawal of up to 0.099 mgd (peak day) (Docket No. 20100907).

 4. Project Sponsor and Facility: Heidelberg Township Municipal Authority, Heidelberg Township, Lebanon County, PA. Application for renewal of groundwater withdrawal of up to 0.115 mgd (30-day average) from existing public water supply Well 5 (Docket No. 19820602).

 5. Project Sponsor and Facility: IBM Corporation, Village of Owego, Tioga County, NY. Application for groundwater withdrawal of up to 0.002 mgd (30-day average) from Well 415.

 6. Project Sponsor and Facility: Jay Township Water Authority, Jay Township, Elk County, PA. Application for groundwater withdrawal of up to 0.265 mgd (30-day average) from Byrnedale Well #1.

 7. Project Sponsor and Facility: Keister Miller Investments, LLC (West Branch Susquehanna River), Mahaffey Borough, Clearfield County, PA. Application for surface water withdrawal of up to 2.000 mgd (peak day).

 8. Project Sponsor and Facility: LHP Management, LLC (Muncy Creek), Muncy Creek Township, Lycoming County, PA. Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20120607).

 9. Project Sponsor and Facility: New Morgan Borough Utilities Authority, New Morgan Borough, Berks County, PA. Application for groundwater withdrawal of up to 0.275 mgd (30-day average) from Well PW-1.

 10. Project Sponsor and Facility: New Morgan Borough Utilities Authority, New Morgan Borough, Berks County, PA. Application for groundwater withdrawal of up to 0.275 mgd (30-day average) from Well PW-3.

 11. Project Sponsor and Facility: New Oxford Municipal Authority, Oxford Township, Adams County, PA. Application for groundwater withdrawal of up to 0.144 mgd (30-day average) from Oxen Country Meadows Well 1.

 12. Project Sponsor: Pennsylvania Department of Environmental Protection—South-central Regional Office, City of Harrisburg, Dauphin County, PA. Facility Location: Leacock Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.590 mgd (30-day average) from Stoltzfus Well.

 13. Project Sponsor: Pennsylvania Department of Environmental Protection—South-central Regional Office, City of Harrisburg, Dauphin County, PA. Facility Location: Leacock Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.432 mgd (30-day average) from Township Well.

 14. Project Sponsor and Facility: Somerset Regional Water Resources, LLC (Salt Lick Creek), New Milford Township, Susquehanna County, PA. Application for renewal of surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 20100905).

 15. Project Sponsor and Facility: Southwestern Energy Production Company (Susquehanna River), Eaton Township, Wyoming County, PA. Application for surface water withdrawal of up to 2.000 mgd (peak day).

 16. Project Sponsor and Facility: SWEPI, LP (Cowanesque River), Nelson Township, Tioga County, PA. Application for renewal of surface water withdrawal of up to 0.533 mgd (peak day) (Docket No. 20100604).

 17. Project Sponsor and Facility: Talisman Energy USA, Inc. (Seeley Creek), Wells Township, Bradford County, PA. Application for renewal of surface water withdrawal of up to 0.750 mgd (peak day) (Docket No. 20100914).

 18. Project Sponsor and Facility: Talisman Energy USA, Inc. (Wyalusing Creek), Stevens Township, Bradford County, PA. Application for renewal of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 20100915).

 19. Project Sponsor and Facility: Tenaska Resources, LLC (Cowanesque River), Westfield Township, Tioga County, PA. Application for renewal of surface water withdrawal of up to 0.750 mgd (peak day) (Docket No. 20100910).

 20. Project Sponsor and Facility: Upper Halfmoon Water Company, Halfmoon Township, Centre County, PA. Application for groundwater withdrawal of up to 0.396 mgd (30-day average) from Well 6.

Project Scheduled for Action Involving a Diversion:

 1. Project Sponsor: Seneca Resources Corporation. Project Facility: Impoundment 1, receiving groundwater from Seneca Resources Corporation Wells 5H and 6H and Clermont Wells 1, 3 and 4, Norwich Township, McKean County, PA. Application for into-basin diversion from the Ohio River Basin of up to 1.473 mgd (peak day).

Opportunity to Appear and Comment

 Interested parties may appear at the hearing to offer comments to the Commission on any project listed previously. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Ground rules will be posted on the Commission's web site, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement these rules at the hearing. Written comments on any project listed previously may also be mailed to Jason Oyler, Regulatory Counsel, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110-1788, or submitted electronically through http://www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed or electronically submitted must be received by the Commission on or before November 17, 2014, to be considered.

Authority: Pub. L. No. 91-575, 84 Stat. 1509 et seq., 18 CFR Parts 806—808.

Dated: October 3, 2014.

ANDREW D. DEHOFF, 
Executive Director

[Pa.B. Doc. No. 14-2176. Filed for public inspection October 17, 2014, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.