NOTICES
Notice of Comments Issued
[46 Pa.B. 1979]
[Saturday, April 16, 2016]Section 5(g) of the Regulatory Review Act (71 P.S. § 745.5(g)) provides that the Independent Regulatory Review Commission (Commission) may issue comments within 30 days of the close of the public comment period. The Commission comments are based upon the criteria contained in section 5.2 of the Regulatory Review Act (71 P.S. § 745.5b).
The Commission has issued comments on the following proposed regulations. The agency must consider these comments in preparing the final-form regulation. The final-form regulation must be submitted within 2 years of the close of the public comment period or it will be deemed withdrawn.
Close of the Public IRRC Comments Reg. No. Agency/Title Comment Period Issued 57-311 Pennsylvania Public Utility Commission
Steam Heat Distribution System Safety
Regulations
46 Pa.B. 658 (February 6, 2016)3/7/16 4/6/16 57-313 Pennsylvania Public Utility Commission
Electric Safety Regulations
46 Pa.B. 654 (February 6, 2016)3/7/16 4/6/16
Pennsylvania Public Utility Commission Regulation #57-311 (IRRC #3131)
Steam Heat Distribution System Safety Regulations
April 6, 2016 We submit for your consideration the following comments on the proposed rulemaking published in the February 6, 2016 Pennsylvania Bulletin. Our comments are based on criteria in Section 5.2 of the Regulatory Review Act (71 P.S. § 745.5b). Section 5.1(a) of the Regulatory Review Act (71 P.S. § 745.5a(a)) directs the Pennsylvania Public Utility Commission (PUC) to respond to all comments received from us or any other source.
1. Section 61.1. Definitions.—Clarity.
Service line, service line of the customer and termination point
The definitions of the terms ''service line'' and ''service line of the customer'' include a description of a termination point, but use different language to describe the same point. For clarity, we recommend adding a definition of ''termination point'' and using that term in the definitions of ''service line'' and ''service line of the customer.''
Consistent use of terms
Existing Section 61.1 defines the term ''public utility.'' However, the following terms are used in the proposed regulation: ''steam public utility,'' ''steam utility,'' ''utility,'' ''steam facility,'' ''facility,'' ''steam distribution system'' and ''steam distribution utility.'' The regulation lacks clarity because these terms are not defined and appear to be used interchangeably. The PUC should define one term and use that term consistently throughout the regulation.
2. Section 61.41. Purpose and policy.—Clarity.
Subsection (d)(2) explains the safety requirements do not apply to the piping downstream of ''the customer's property line.'' Based on the definitions in Section 61.1, the termination point may be the property line or a point provided by contract. If the PUC adds a definition of ''termination point'' that term should be used. Otherwise, the language of this subsection should be amended to include the possibility that the point is described in contract.
3. Section 61.42. Safety and compliance with standard code.—Reasonableness; Implementation procedures; Statutory authority.
Subsection (a) Responsibility
This subsection begins with the phrase ''A steam utility shall use at all times every reasonable effort to properly warn and protect the public from danger. . . .'' Emphasis added. The word ''every'' might imply an obligation beyond a reasonable standard. While we fully agree with protection of persons from danger, it is not clear what additional standard is set by requiring ''every'' reasonable effort. For example, subsequent Paragraph (b) requires compliance with the standards established by the American Society of Mechanical Engineers (ASME). Does the language of Subsection (a) requiring ''every reasonable effort'' contemplate something beyond the ASME? The word ''every'' should be deleted unless the PUC can explain the need for it and clarify its meaning within the language of the overall regulation.
Subsection (b) Standard code
This subsection requires steam distribution pipeline facilities installed after the effective date of adoption of the proposed rulemaking to be designed, constructed, tested, operated and maintained in accordance with the most updated and applicable standards of ASME. We have two concerns. First, this section does not explain what standards apply to existing facilities. For example, would it be proper to maintain a facility designed and constructed in accordance with the standards in place at the time of construction? However, it might not be proper to use updated test and maintenance standards on that same facility using future updated standards. The regulation should include an explanation of what standards will be applied to existing utility facilities.
Second, the last sentence of this subsection states the PUC has the ''discretion to determine whether a redesign, repair, modification or replacement of a facility constitutes a new facility subject to these regulations.'' How can a utility comply with this sentence? Will a utility receive notice of this determination by the PUC prior to expending resources on design and construction? The PUC should explain how this sentence will be reasonably implemented.
Subsection (c) Statutory compliance
This subsection requires a steam utility to comply with section 1-11 of the act of December 10, 1974 (73 P.S. §§ 176—186), known as the ''Underground Utility Line Protection Act,'' and ''Pennsylvania One Call'' (PA One Call). House Bill 445, which would transfer enforcement authority to the PUC, is pending in the state legislature. We believe that adding subsection (c) is premature and should be deleted pending passage of the legislation into law and establishment of any memoranda of understanding between agencies to implement the legislation as it may pertain to the scope of this regulation.
Subsection (e) Records
The first sentence of this subsection is vague by requiring ''adequate records as required for compliance with this subsection.'' The view of what are ''adequate records for compliance'' could vary. We recommend that the PUC review and amend this requirement to clearly state what records are required.
4. Section 61.43. Notification of major construction.—Reasonableness.
This section addresses notification of proposed construction, including an estimated completion date. However, Paragraph (9) also requires ''Notification to the Commission of the completion date.'' If the PUC intends for a separate notification to be required, the regulation should clearly state so.
5. Section 61.44. Operating and maintenance plan.—Clarity.
There are two concerns with Subsection (a) which requires steam utilities to establish an operations and maintenance plan that complies with the new safety requirements and requires revisions to a plan to be submitted at least 30 days prior to the effective date of the plan. First, Veolia Energy Philadelphia, Inc. (VEPI) requests the PUC specify an exact date by which the plan is required to be in place. We agree that a due date should be added to the regulation.
Second, VEPI seeks clarification on whether ''the plan'' in the last sentence of Subsection (a) refers to the original plan, or if it is referring to subsequently revised plans? We agree. The PUC should clarify whether it is referring to the original plan or the revision.
6. Section 61.45. Security planning and emergency contact list.—Clarity.
Subsection (c) requires a steam utility to file with the PUC's Secretary, the Gas Safety Division and all municipalities a list of responsible officials who may be contacted in the event of an emergency. However, revisions to this list are to be reported only to the Gas Safety Division and affected municipalities, but not the PUC's Secretary. We question the need to require reporting to both the Secretary and the Gas Safety Division under issue 14 in these comments. However, if the PUC retains the dual reporting requirements, shouldn't the Commission's Secretary also receive the revisions?
7. Section 61.46. Customer education and information program.—Reasonableness; Clarity.
Subsection (b) states ''The program and the media used must be as comprehensive as necessary to reach all customers.'' This requirement is vague. How can a steam utility comply with it? It should be replaced with a specific standard.
8. Section 61.47. Employee training.—Clarity; Reasonableness.
There are three concerns with Subsection (a). First, it requires an employee involved in the operation, maintenance or testing of steam pipelines and related facilities to satisfactorily complete training at all progression levels to ensure effective and safe implementation of the procedures required under the chapter. It further states that every employee and supervisor must receive annual training. Since the regulation does not specify what training is required, Subsection (a) is vague regarding the training and progression levels. The regulation should specify what training is acceptable to the PUC and what constitutes satisfactory completion of the training.
Second, in what subjects must employees and supervisors receive annual training?
Finally, is it reasonable and appropriate for all employees in the operations, maintenance and testing to receive training at all progression levels?
9. Section 61.48 Periodic inspections.—Reasonableness.
Subsection (a) requires steam traps and trap piping assemblies to be inspected for general condition and proper operation at least three times each calendar year. NRG commented that three inspections per year are unnecessary because multiple inspections are often conducted for efficiency reasons and believe that one mandated safety inspection per year would be sufficient. The PUC should explain why three inspections per year are needed.
10. Section 61.49. Records.—Need; Reasonableness
The last sentence of this section states, ''Records and copies shall be kept on file at the steam utility's offices in this Commonwealth. . . .'' We have two concerns. First, it is not clear what the phrase ''and copies'' requires. Is the utility required to keep an extra copy of its records? The regulation should explain what copies are intended to be kept.
Second, to comply, a steam utility would be required to have offices in this Commonwealth. Is it necessary for this recordkeeping provision to require offices in Pennsylvania? If so, the PUC should explain the need for offices in this Commonwealth. If not, given that many records are kept electronically and could be kept in a central corporate location outside Pennsylvania, the phrase ''in this Commonwealth'' should be deleted.
11. Section 61.50. Welding; qualification and nondestructive testing.—Economic impact; Reasonableness; Protection of the public.
Both NRG and VEPI commented on this section. NRG states that it does random testing of welds and believes it is unsafe to do hydro tests in the field because of the potential for flash steam and water hammer. VEPI seeks clarification of whether air testing can be done. Additionally, VEPI suggests performing X-rays to determine the strength of field welds because it is safer than pressure testing and less intrusive to the distribution system. We have two recommendations. First, the PUC should review these comments and clarify the regulation to clearly state what types of testing are acceptable. Second, we recommend that the PUC explain why the testing required by the regulation is the best alternative.
12. Section 61.51. Steam leaks and emergency reports.—Clarity.
Subsection (b)
This subsection requires non-emergency leaks to be re-examined within 6 months from the date of discovery and repaired within a reasonable time. At the same time, Section 61.44(4) states that steam utilities must have an operating and maintenance plan that includes procedures to correct, within specified time frames, deficiencies found during inspections, evaluations, and tests required under the chapter. Are these two different standards for one type of leak? The PUC should review and reconcile these provisions.
Subsection (f)
There are two concerns. First, it requires a steam utility to have available, on or before the 16th day of each month, a summary analysis of its performance in responding to reports of steam leaks and emergencies. NRG asked for the date of the 16th to be moved to the end of the month to coincide with its normal operations. The PUC should consider using the end of the month.
Second, this subsection requires a ''summary analysis.'' What constitutes a summary analysis? The regulation should specify what information is required.
13. Section 61.53. Asbestos control.—Reasonableness; Implementation; Statutory Authority.
In the Preamble, the PUC requests public comment as to whether the proposed language best serves the public interest. Under this section, a steam utility must have procedures to safely manage and abate asbestos materials from accessible manholes, vaults and other areas that contain steam facilities. It also requires a steam utility to have a program to maintain, in safe condition, asbestos materials on exposed piping and fittings in the steam distribution system and eliminate asbestos materials to the extent practicable and feasible.
As the PUC observes, the public health threat of asbestos is well-known and well-documented. Asbestos is already regulated by several other entities including:
• The Pennsylvania Department of Labor and Industry lists asbestos as a hazardous substance under 34 Pa. Code Chapter 323 and, therefore, regulates asbestos;
• The Pennsylvania Department of Environmental Protection regulates asbestos including asbestos disposal at 25 Pa. Code Section 273.414;
• The Environmental Protection Agency; and
• The Occupational Safety and Health Administration.
While we agree that asbestos must be carefully handled, controlled and disposed, we question what the PUC regulation of asbestos adds and whether it may possibly conflict with or duplicate existing regulations. Therefore, we ask the PUC to explain its authority to regulate asbestos, how exercising that authority enhances the safety already in place to regulate asbestos, what expertise the PUC has to offer in the regulation of asbestos that other entities do not have and how exercising its authority will not conflict with the multiple state and federal authorities that already regulate asbestos.
14. Reports and Notices.—Need; Reasonableness.
Need for two notices or reports
Sections 61.43, 61.44(a), 61.45(c) and 61.46(c) require steam heat utilities to file or notify both the Secretary of the PUC and the Gas Safety Division. For example, Section 61.43 requires that ''A steam utility shall notify the Commission and the Gas Safety Division of proposed major construction. . . .'' Why are two notices necessary of proposed major construction and what does the PUC do with each notice? In each instance, the PUC should justify the need and reasonableness of requiring the utility to make two filings or notices of the same information. Additionally, the PUC should revise the response to Regulatory Analysis Form Question 19 to reflect the reporting requirements imposed by the regulation.
Record retention
Section 61.51(f) requires a steam utility to have available a summary analysis of its performance in responding to reports of steam leaks and emergencies. The length of time that a steam utility is required to keep records under this section is not stated. Section 61.12 (relating to interruptions of service) requires records to be preserved for a period of 6 years. Section 61.49 (relating to records) requires steam utilities to maintain records documenting inspections, maintenance, tests and all other matters required under the chapter to be kept for at least 3 years. Why does the time period for record retention vary between sections? The PUC should clarify the recordkeeping retention requirements throughout the regulation.
Pennsylvania Public Utility Commission
Regulation #57-313 (IRRC #3132)
Electric Safety Regulations
April 6, 2016 We submit for your consideration the following comments on the proposed rulemaking published in the February 6, 2016 Pennsylvania Bulletin. Our comments are based on criteria in Section 5.2 of the Regulatory Review Act (71 P.S. § 745.5b). Section 5.1(a) of the Regulatory Review Act (71 P.S. § 745.5a(a)) directs the Pennsylvania Public Utility Commission (PUC) to respond to all comments received from us or any other source.
1. Section 57.1. Definitions.—Consistency with statute; Reasonableness; Need; Clarity.
EDC—Electric distribution company or electric utility
There are two concerns. First, this definition includes two terms: ''electric distribution company'' and ''electric utility.'' Including the term ''electric utility'' is ambiguous because the definition refers to the statutory definition ''electric distribution company.'' To be consistent with the statute, the term ''electric utility'' should be deleted from this definition. The regulation should define and use the single term used in the statute: ''electric distribution company.''
Second, the Office of Consumer Advocate (OCA) commented that it believes this definition may not include ''substantial electric facilities'' situated in Pennsylvania that are owned by public utilities yet may not fit within the definition of EDC, such as Trans-Allegheny Interstate Line Company. Does the definition of EDC encompass all of the entities intended to comply with this regulation? If the PUC agrees with the OCA and can clearly establish that the Public Utility Code provides the PUC with jurisdiction over the safety of these other facilities, the PUC should add another term to the definitions and body of the regulation so that the regulation encompasses the safety of the other facilities.
Service point or point of delivery
We have three concerns. First, the Energy Association of Pennsylvania (EAP) commented that the use of two terms for a single definition could cause uncertainty and confusion in practice. We agree that using two terms lacks clarity. We recommend that the regulation define and use one term.
Second, the Pennsylvania AFL-CIO Utility Caucus (AFL-CIO) advocates using the National Electric Safety Code (NESC) definition because the NESC definition applies in circumstances where the electric utility may not have designated a point of interconnection. The PUC should review this definition to ensure it encompasses as many circumstances as possible.
Third, the definition states the demarcation point is ''the location designated by the EDC. . . .'' The designation of this point should be established by the EDC in its PUC approved tariff, as reflected in proposed Subsection 57.28(a). To be consistent with Subsection 57.28(a), the definition should include additional language to state the location designated by the EDC ''in its PUC approved tariff,'' or similar language.
National Electric Safety Code (NESC)
We agree with the commentators that a definition of this term should be added to this section.
2. Section 57.28. Electric safety standards.—Statutory authority; Reasonableness; Duplication; Implementation procedure; Clarity.
Subsection (a) Duties and responsibilities
This subsection states the separation of duties and responsibilities . . . ''shall be effectively described in the EDC's tariff that is filed with and approved by the Commission.'' (Emphasis added.) Since the tariff is approved by the PUC, the word ''effectively'' is not needed. The term is also unclear. We recommend deleting the word ''effectively'' from Subsection (a).
Paragraph (a)(1) Duty of an EDC
There are two concerns. First, this paragraph begins with the phrase ''An EDC shall use every reasonable effort to properly warn and protect the public from danger. . . .'' (Emphasis added.) EAP commented that the word ''every'' implies the legal obligation exceeds a reasonable standard and requires additional extraordinary action by a utility to reduce hazards which is clearly not the law. While we fully agree with protection of persons from danger, it is not clear what additional standard is set by requiring ''every'' reasonable effort. For example, subsequent Paragraph (b)(2) requires compliance with the standards established by the NESC. Does the language of Paragraph (a)(1) requiring ''every reasonable effort'' imply something beyond the NESC? The word ''every'' should be deleted unless the PUC can explain the need for it and clarify its meaning within the language of the overall regulation.
Second, this paragraph ends with the phrase ''. . . by reason of its provision of electric distribution service and its associated equipment and facilities.'' (Emphasis added.) EAP commented that the wording of the regulation could imply this regulation applies to the safety of electric distribution services beyond its associated equipment and facilities. We agree that the use of the word ''and,'' emphasized above, implies this safety regulation applies to both the broad category of electric distribution services and the associated equipment and facilities. We recommend that the wording of this phrase be reviewed and amended to clearly state what it applies to.
Paragraph (a)(2) Customer responsibility
This paragraph would establish the PUC regulation and enforcement of all electric utility customers to safely maintain and inspect wiring and equipment beyond the service point (e.g., within the customer's home in most circumstances). Is the PUC's actual intent for this provision to regulate customers or is the intent to state that the EDC is not responsible for customer's wiring and equipment? A regulation establishes a binding norm between an agency, in this case the PUC, and the regulated community, in this case the customer. The Preamble does not establish a statutory basis or justification for the PUC to regulate maintenance of wiring and equipment owned by the customer beyond the service point. Therefore, as the regulation is worded, it is not clear that the PUC has this jurisdiction or how the PUC would enforce this paragraph. While we believe the customer should be diligent in the area of electric safety, the PUC should delete this paragraph from the regulation in its entirety. Alternatively, if the PUC believes it has jurisdiction to regulate customers in this manner, it should provide a thorough explanation of the statutory authority to regulate them, the need to regulate them and how it would enforce this regulation.
Subsection (b) Safety code
This subsection states:
''A jurisdictional EDC shall comply with all of the following minimum safety standards:(1) This chapter.(2) The standards established by the National Electrical Safety Code.(3) The procedures established by the EDC and set forth in the EDC's internal company procedures.(4) The standards established by sections 1—11 of the act of December 10, 1974 (73 P.S. §§ 176—186), known as the Underground Utility Line Protection Act, and Pennsylvania One Call.(5) Other applicable and governing State and Federal laws and regulations.''EAP commented and provided justification for deleting all but Paragraph (2). We agree and explain our concerns with each paragraph below.
Paragraphs (b)(1) and (5)
EAP believes Paragraphs (1) and (5), which require compliance with this chapter and other applicable laws and regulations, are unnecessary because they restate existing obligations and are so overly broad as to be vague. We agree that Paragraphs (1) and (5) are not needed. We recommend deleting them unless the PUC can provide justification for why they are needed.
Paragraph (b)(3)
This paragraph would assimilate an EDC's internal company procedures as an enforceable PUC regulation. EAP questions whether such a proposed standard is either authorized or practical. EAP cites two court decisions in support of its position: PUC v. Philadelphia Electric Company, 522 Pa. 338, 561 A.2d 1224 (Pa. Supreme Ct. 1989) and Pickford v. PUC, 4 A.3d 707 (Pa. Commw. Ct. 2010). What happens if the PUC disagrees with an internal procedure, but is bound to enforce it by this regulation? Most importantly, the PUC would be delegating its regulatory authority to safety ''procedures established by the EDC and set forth in the EDC's internal company procedures.'' This would allow an EDC to unilaterally write its own safety regulations via its internal documents and furthermore to amend them at the EDC's discretion, independent of the PUC, and outside the Regulatory Review Act process which provides for public comment, Standing Committee review and our review. For these reasons, we strongly recommend deleting Paragraph (3).
Paragraph (b)(4)
EAP observes, in addition to other concerns, that Paragraph (4) is premature because House Bill 445, which would transfer enforcement authorities to the PUC, has not been passed into law. We agree that Paragraph (4) is premature in this area and should be deleted pending passage of the legislation into law and establishment of any memoranda of understanding between agencies to implement the legislation as it may pertain to the scope of this regulation.
Implementation of the NESC and revisions to the NESC
In regard to Paragraph (b)(2), which adopts the standards established by the NESC, there are two concerns. First, EAP suggested adding a 180-day period after a new edition of the NESC takes effect to allow for training and implementation. EAP provided suggested language. We agree that an implementation period should be included in the regulation.
Second, several commentators suggest adding language to clarify that the NESC standards in place at the time of a facility's installation should be the standards that apply to that facility. The PUC should consider adding language to clarify what standards apply to existing facilities when the NESC is updated.
Subsection (c) Enforcement
Commentators question what data the regulation requires by requiring ''raw data'' and further question whether this is a new category of information. The PUC should further explain the need for this data and clarify the regulation to more clearly state what data is required.
Subsection (d) Records
We have two concerns. First, the first sentence is vague by requiring ''adequate records as required for compliance with the safety code.'' The view of what are ''adequate records for compliance'' could vary. We recommend that the PUC review and amend this requirement to clearly state what records are required for compliance.
Second, the second sentence of this subsection restates an existing requirement under Section 57.11. Since Section 57.11 independently establishes this reporting requirement, this sentence is duplicative and not needed in Subsection (d).
3. Coordination of safety with other utilities.—Protection of the public health, safety and welfare.
Three parties commented on coordination of safety with other utilities: the AFL-CIO, and a joint comment by Pennsylvania American Water Company and System Local 537, Utility Workers of America, AFL-CIO. These comments described concerns for safety when water and sewer utilities are working in close proximity to electric utility lines and there is potential for an electric line to energize the work area of another utility, presenting a direct hazard to their workers.
To avoid the circumstances described in the comments, we recommend that the PUC consider an amendment to coordinate the individual utility safety and reliability provisions in 66 Pa.C.S. § 1501 and the overall safety of those who work for other utilities under its jurisdiction. While it may be possible to amend this rulemaking to address these circumstances, we defer to the PUC to determine whether to include an amendment in this rulemaking or to address this concern in a separate proposed regulation which would allow more opportunity for comment and to build consensus on the language of the amendment to the regulation.
4. Existing gas service regulation at 52 Pa. Code § 59.33—Reasonableness.
Almost all of the comments from the electric industry include references to the existing gas safety regulation found at 52 Pa. Code § 59.33. These comments compare this proposed regulation to the existing language of the gas regulation and question why the electric safety requirements differ from the gas safety requirements. We believe the commentators raise valid points and we too question why the standards would vary. We will review the PUC responses to these public comments as part of our consideration of whether the final regulation is in the public interest.
GEORGE D. BEDWICK,
Chairperson
[Pa.B. Doc. No. 16-675. Filed for public inspection April 15, 2016, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.