PA Bulletin, Doc. No. 17-750

NOTICES

Projects Approved for Minor Modifications

[47 Pa.B. 2529]
[Saturday, April 29, 2017]

 The Susquehanna River Basin Commission (Commission) lists the minor modifications approved for a previously approved project from August 16, 2016, to March 31, 2017.

 For further information contact Jason E. Oyler, General Counsel, (717) 238-0423, Ext. 1312, fax (717) 238-2436, joyler@srbc.net. Regular mail inquiries may be sent to the Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110-1788.

Supplementary Information

 This notice lists previously approved projects, receiving approval of minor modifications, described as follows, under 18 CFR 806.18 (relating to approval modifications) for the time period previously specified:

Minor Modifications Issued Under 18 CFR 806.18

 1. Essential Power Rock Springs, LLC, Rock Springs Generation Facility, Docket No. 20001203-2, Rising Sun District, Cecil County, MD; approval to change the authorized water use purpose, on an interim basis, to include bulk water supply to the neighboring Wildcat Point Generation Facility; Approval Date: August 16, 2016.

 2. Essential Power Rock Springs, LLC, Rock Springs Generation Facility, Docket No. 20001203-3, Rising Sun District, Cecil County, MD; approval to add Wildcat Point Generation Facility as a source for project consumptive water use to be used as a replacement for the existing sources and rescission of the approval for surface water withdrawal from the onsite stormwater pond; Approval Date: January 6, 2017.

 3. Old Dominion Electric Cooperative, Wildcat Point Generation Facility, Docket No. 20140308-1, Rising Sun District, Cecil County, MD; approval to add Rock Springs Generation Facility as a source for project consumptive water use, on an interim basis, until the approved new water source under Docket No. 20140308 is available; Approval Date: August 16, 2016.

 4. Old Dominion Electric Cooperative, Wildcat Point Generation Facility, Docket No. 20140308-2, Rising Sun District, Cecil County, MD; approval to change the authorized water use purpose to include bulk water supply to the neighboring Rock Springs Generation Facility; Approval Date: January 6, 2017.

 5. Patton Borough, Docket No. 20121221-1, Clearfield Township, Cambria County, PA; approval of an increase in the total system limit from 0.339 mgd established in Docket No. 20121221 to 0.632 mgd; Approval Date: September 26, 2016.

 6. Renovo Energy Center, LLC, Docket No. 20160608-1, Renovo Borough, Clinton County, PA; approval to add Renovo Borough Water Authority as a source for project consumptive water use, on an interim basis, until the approved new water source under Docket No. 20160608 is available; Approval Date: March 24, 2017.

Authority: Pub.L. 91-575, 84 Stat. 1509 et seq., 18 CFR Parts 806—808

Dated: April 18, 2017

ANDREW D. DEHOFF, 
Executive Director

[Pa.B. Doc. No. 17-750. Filed for public inspection April 28, 2017, 9:00 a.m.]