[49 Pa.B. 3088]
[Saturday, June 15, 2019]

CPC 18.167: New Storage Facility. The general project description includes construction of a new 17,200 square foot storage building employing pre-engineered metal building construction and all associated site and utility construction.

 1. General Contractor: The general contractor will serve as the lead contractor and be responsible for coordination of the entire project with other prime contractors. The general contractor's scope of work generally includes but is not limited to: all site grading, cut and fill; domestic and fire protection water utilities beginning at a point 5 feet beyond the building wall; natural gas utility beginning at a point 5 feet beyond the building wall; sanitary sewer utility beginning at a point 5 feet beyond the building wall; excavation and backfill for foundations; concrete footings; CMU foundations; concrete slab-on-grade; pre-engineered metal building frame (including insulated roof and wall panels); exterior brick masonry wainscot around the perimeter of the building; interior CMU partitions, door, frames and hardware; window; overhead coiling doors; rack system; painting; site concrete work; asphalt paving; and seeding and mulching of lawn areas.

 2. HVAC Contractor: The HVAC contractor's scope of work generally includes but is not limited to: exterior grade-mounted air handling units; sheet metal ductwork; fabric ductwork; toilet and janitor's closet exhaust systems; split system heat pump; and automatic temperature control system.

 3. Plumbing/Fire Protection Contractor: The plumbing/fire protection contractor's scope of work generally includes but is not limited to: below grade sanitary piping; above ground sanitary and vent piping; domestic hot-water and cold-water piping; pipe insulation; plumbing fixtures; floor drains; point-of-use electric hot water heaters; and automatic sprinkler system.

 4. Electrical Contractor: The electrical contractor's scope of work generally includes but is not limited to: coordination of electric service to the building with PP&L; MDP branch circuit panels; transformers; conduit and wire for power and lighting; light fixtures; receptacles; security system; fire alarm detection system; voice and data drops; and fiber optic connection to the MDF at the existing House Print Shop building.

 The issue date of the request for proposals will be on the June 24, 2019. A mandatory preproposal conference will be held on July 8, 2019, at 9:30 a.m. in Room 630, Main Capitol Building, Harrisburg, PA. The proposal receipt date is July 17, 2019, at 2 p.m. Project documents may be obtained by contacting Vitetta, Attention: Sharon Hindermyer, (717) 612-4611, Hindermyer@vitetta.com.

DAVID L. CRAIG, 
Executive Director

[Pa.B. Doc. No. 19-893. Filed for public inspection June 14, 2019, 9:00 a.m.]