Bid Opportunity

[49 Pa.B. 7132]
[Saturday, November 30, 2019]

OSM 35(2080)105.1 (DGS 193-43 Phase 1), Abandoned Mine Reclamation Project, Sterry Creek South-Dolph Mine Fire, Olyphant Borough, Lackawanna County. The principal items of work and approximate quantities include:

1 Mobilization and Demobilization 1 lump sum
2A1 Implementation of the Erosion and Sediment Pollution Control Plan—Rock Construction Entrance—Geotextile Installation 360 square yards
2A2 Implementation of the Erosion and Sediment Pollution Control Plan—Rock Construction Entrance—AASHTO
# 1 Aggregate Placement
160 tons
2A3 Implementation of the Erosion and Sediment Pollution Control Plan—Rock Construction Entrance—AASHTO
# 1 Aggregate Removal
160 tons
2A4 Implementation of the Erosion and Sediment Pollution Control Plan—Rock Construction Entrance—Geotextile Removal 360 square yards
2B1 Implementation of the Erosion and Sediment Pollution Control Plan—Compost Filter Sock—Install and Maintain 18" Compost Filter Sock 2,410 linear feet
2B2 Implementation of the Erosion and Sediment Pollution Control Plan—Compost Filter Sock—Install and Maintain 24" Compost Filter Sock 200 linear feet
2B3 Implementation of the Erosion and Sediment Pollution Control Plan—Compost Filter Sock—Remove Stakes and Cut Open 18" Compost Filter Sock 2,410 linear feet
2B4 Implementation of the Erosion and Sediment Pollution Control Plan—Compost Filter Sock—Remove Stakes and Cut Open 24" Compost Filter Sock 200 linear feet
2C Implementation of the Erosion and Sediment Pollution Control Plan—Rock Filter Outlets 4 each
2D Implementation of the Erosion and Sediment Pollution Control Plan—Pumped Water Filter Bag 3 each
2E Implementation of the Erosion and Sediment Pollution Control Plan—Orange Construction Fence 200 linear feet
3 Clearing and Grubbing 1 lump sum
4A Access Roads—Access Road ''A'' 1 lump sum
4B Access Roads—Access Road ''D'' 1 lump sum
4C Access Roads—Access Road ''E'' 1 lump sum
5 Access Gate 3 each
6 Underground Utility Line Equipment Crossing 10 each
7 Temporary Stream Crossing 1 each
8A Water Storage Ponds—Pond 1 1 each
8B Water Storage Ponds—Pond 2 1 each
8C Water Storage Ponds—Pond 3 1 each
9B Water Supply—Develop 2018 Drawdown Well Water Source 1 lump sum
9C Water Supply—Develop Valley View Drive Water Source 1 lump sum
9D Water Supply—Water 50,000 per 1,000 gallons
11 Fire Fighting Foam 8,000 gallons
12A Excavation/Backfilling—Overburden/Quenched Material 1,367,500 cubic yards
12B Excavation/Backfilling—Special Handling of Coal 139,100 cubic yards
12C Excavation/Backfilling—Excavation for Backfilling/
Final Grading
755,000 cubic yards
12D Excavation/Backfilling—Alkaline Addition Materials 2,500 tons
13A Blasting—Blasting 559,500 cubic yards
13B Blasting—Preblast Survey 9 each
13C Blasting—Postblast Survey 9 each
14 Drilling Monitoring Boreholes 300 linear feet
15 Steel Casing for Boreholes 300 linear feet
16A Rolled Erosion Control Products—NAG C350 3,900 square yards
16B Rolled Erosion Control Products—NAG SC250 1,280 square yards
16C Rolled Erosion Control Products—NAG W3000 5,150 square yards
17A Seeding—Seed Mixture 1 95 acres
17B Seeding—Seed Mixture 2 20 acres
17C Seeding—Supplements 115 acres
17D Seeding—Mulch 115 acres
18 Fence Removal 7,200 linear feet
19 Office Facility 1 lump sum
Principal Items of Work and Approximate Quantities: Alternate Bid # 1
5 Access Gate 1 each
7 Temporary Stream Crossing 1 each
9A Develop Marshwood Reservoir Water Source 1 lump sum
10 Jack and Bore of State Road 1 lump sum

 This bid issues on November 15, 2019, and bids will be opened on January 9, 2020, at 2 p.m. Bid documents, including drawings in PDF format and AutoCAD Map 3D format, may be downloaded for free beginning on the issue date from the Department of Environmental Protection by going to www.BidExpress.com. A mandatory prebid conference is scheduled for December 18, 2019, at 10 a.m. at the Department of Transportation, Maintenance District 4-0/Lackawanna County 4-2, 1034 Morgan Highway, Clarks Summit, PA 18411. Failure to attend the prebid conference will be cause for rejection of the bid. This project is financed by the Federal government under the authority given it by the Surface Mining Control and Reclamation Act of 1977 (act) (30 U.S.C.A. §§ 1201—1328) and is subject to the act and to the Federal grant for this project. Contact the Construction Contracts Section at (717) 787-7820 or RA-ConstructionContr@pa.gov for more information on this bid.

PATRICK McDONNELL, 
Secretary

[Pa.B. Doc. No. 19-1785. Filed for public inspection November 27, 2019, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.