Bid Opportunity
[51 Pa.B. 7785]
[Saturday, December 11, 2021]AMD 32(2722)102.1 (DGS 193-38), Abandoned Mine Reclamation Project, Blacklick Creek Treatment Facility (Wehrum), Blacklick Township, Cambria County, and Buffington and East Wheatfield Townships, Indiana County. The principal items of work and approximate quantities include:
Mobilization and demobilization, 1 lump sum Implementation of the erosion and sediment pollution control plan: phase 1 erosion and sediment controls, 1 lump sum Implementation of the erosion and sediment pollution control plan: remaining project areas, 1 lump sum Implementation of the erosion and sediment pollution control plan: removal of erosion and sediment controls, 1 lump sum Implementation of the erosion and sediment pollution control plan: maintenance of erosion and sediment controls,
24 per monthClearing and grubbing 1 lump sum Access roads and parking: construction of gravel access roads, 32,500 square feet Access roads and parking: access road maintenance stone, 500 tons Access roads and parking: removal of gravel access roads, 1 lump sum Access roads and parking: construction of bituminous treatment facility access Roads, turn-arounds and parking areas, 1 lump sum Removal and disposal of solid waste, 20 tons Site grading, excavating, dewatering and backfilling: excavation and backfill, 27,000 cubic yards Site grading, excavating, dewatering and backfilling: hard rock removal, 2,000 cubic yards Site grading, excavating, dewatering and backfilling: toe keys and subsurface drains, 1,500 linear feet Site grading, excavating, dewatering and backfilling: soil liner, 3,700 cubic yards Potable water supply, 1 lump sum Sanitary sewerage, 1 lump sum Post construction stormwater management: retentive grading, 1 lump sum Post construction stormwater management: rain garden best management practice (BMP), 1 lump sum Post construction stormwater management: infiltration basin BMP, 1 lump sum Post construction stormwater management: stormwater conveyance, 1 lump sum Restoration, seeding and soil supplements: seed bed preparation, 24.3 acres Restoration, seeding and soil supplements: agricultural limestone, 145.8 tons Restoration, seeding and soil supplements: commercial fertilizer, 24,300 pounds Restoration, seeding and soil supplements: seed, 1,500 pounds Restoration, seeding and soil supplements: mulching, 24.3 acres Restoration, seeding and soil supplements: aggregate, 1,525 tons Chain link fences and gates, 1 lump sum Aggregate pad area preparation, 1 lump sum Diversion and care of water, 1 lump sum Stream crossing: temporary stream crossing, 7 each Stream crossing: permanent stream crossing, 4 each Drilling boreholes: drilling to competent bedrock sized to accommodate 8 inches in diameter Casing, 140 linear feet Drilling boreholes: drilling borehole sized to accommodate 16 inches in diameter casing, 437 linear feet Drilling boreholes: drilling borehole sized to accommodate 20 inches in diameter steel Surface casing, 254 linear feet Drilling boreholes: drilling borehole sized to accommodate 24 inches in diameter steel surface casing, 70 linear feet Drilling boreholes: drilling borehole sized to accommodate 10 inches HDPE or PVC, 733 linear feet Drilling boreholes: drilling borehole sized to accommodate 4 inches PVC riser, 305 linear feet Drilling boreholes: downhole camera survey, 4 each Furnishing and installing casing pipe: 8 inches in diameter steel surface casing pipe, 140 linear feet Furnishing and installing casing pipe: 16 inches in diameter stainless steel, schedule 20 casing pipe, 437 linear feet Furnishing and installing casing pipe: 20 inches in diameter stainless steel, schedule 20 casing pipe, 254 linear feet Furnishing and installing casing pipe: 24 inches in diameter steel surface casing pipe, 70 linear feet Furnishing and installing casing pipe: 10 inches in diameter PVC pipe, 733 linear feet Furnishing and installing casing pipe: 4 inches in diameter PVC pipe, 305 linear feet Sealing of boreholes, 6 each Abandonment of shafts and slope entry: cement, 550 tons Abandonment of shafts and slope entry: flyash, 4,050 dry tons Abandonment of shafts and slope entry: sand, 700 tons Abandonment of shafts and slope entry: aggregate (stone), 850 tons Abandonment of shafts and slope entry: coarse aggregate, 200 tons Abandonment of shafts and slope entry: rock fill, 600 tons Abandonment of shafts and slope entry: drilling, 750 linear feet Abandonment of shafts and slope entry: casing, 750 linear feet Abandonment of shafts and slope entry: reinforced concrete caps, 2 each Abandonment of shafts and slope entry: 7-day compressive strength, 9 each Abandonment of shafts and slope entry: 28-day compressive strength, 9 each Abandonment of shafts and slope entry: synthetic precipitation leaching procedure, 3 each Commercial no. 16 mine water collection and conveyance system, 1 lump sum Cast-in-place concrete: vinton extraction wells # 1 and # 2 buildings foundations, floor slabs, stairs, loading docks and roof access ladder landing pads, 1 lump sum Cast-in-place concrete: wehrum extraction wells # 1 and # 2 buildings foundations, floor slabs and roof access ladder landing pads, 1 lump sum Cast-in-place concrete: reaction tanks (T-800 and T-900) foundation, 1 lump sum Cast-in-place concrete: reaction tanks (T-800 and T-900) walls, 1 lump sum Cast-in-place concrete: maelstrom oxidizers (T-600 and T-700) platform column foundations, piers and stair landing pad, 1 lump sum Cast-in-place concrete: control building column foundations and grade wall footings, 1 lump sum Cast-in-place concrete: control building column piers and grade wall, 1 lump sum Cast-in-place concrete: control building floor slab, sump, trenches and containment curbs, 1 lump sum Cast-in-place concrete: garage building column foundations and grade wall footings, 1 lump sum Cast-in-place concrete: garage building column piers and grade walls, 1 lump sum Cast-in-place concrete: garage building floor slab and hose bib pad, 1 lump sum Cast-in-place concrete: blowers pad, 1 lump sum Cast-in-place concrete: blending tank (T-402) foundation and hydrated lime silo (S-1601) foundation, 1 lump sum Cast-in-place concrete: clarifier (T-1000) foundation and sludge sump, 1 lump sum Cast-in-place concrete: clarifier (T-1000) wall and effluent trough, 1 lump sum Cast-in-place concrete: clarifier (T-1100) foundation and sludge sump, 1 lump sum Cast-in-place concrete: clarifier (T-1100) wall and effluent trough, 1 lump sum Cast-in-place concrete: clarifier's access platform column foundations, piers and stair landing pad, 1 lump sum Cast-in-place concrete: valve access platform column foundations, piers and stair landing pad, 1 lump sum Cast-in-place concrete: cutthroat flume walls and concrete fill between walls and metal flume, 1 lump sum Cast-in-place concrete: off-spec pond pump vault foundation and walls, 1 lump sum Cast-in-place concrete: polishing pond pump vault foundation and walls, 1 lump sum Cast-in-place concrete: generator pad, utility water storage tank (T-1900) foundation, Xfer switch and AC condensers pad and pipe support pad by utility water storage tank, 1 lump sum Cast-in-place concrete: pump pads (for pumps P-1401, P-1402, P-2101, P-2102, P-1501 and P-1502), pad for service water pumps (P-1900A and P-1900B) and bladder tank (P-902) pad. Located in the control building, 1 lump sum Cast-in-place concrete: trough support column foundations, 1 lump sum Cast-in-place concrete: light pole foundations, 22 each Pre-cast concrete: install and finish pre-cast hollow core roof for vinton extraction well # 1 building, 1 lump sum Pre-cast concrete: install and finish pre-cast hollow core roof for vinton extraction well # 2 building, 1 lump sum Pre-cast concrete: install and finish pre-cast hollow core roof for wehrum extraction well # 1 building, 1 lump sum Pre-cast concrete: install and finish pre-cast hollow core roof for wehrum extraction well # 2 building, 1 lump sum Unit masonry, 1 lump sum Structural steel: vinton extraction well # 1 and vinton extraction well # 2 buildings' roof framing, handrail posts, rails and toeplates at roof and handrail posts, permanent rails, removable rails and toe plates at dock area, 1 lump sum Structural steel: wehrum extraction well # 1 and wehrum extraction well # 2 buildings' roof framing, handrail posts, rails and toe plates at roof, 1 lump sum Structural steel: blend tank platform framing, grating handrail posts, rails and toe plates and stairs, 1 lump sum Structural steel: reaction tanks (T-800 and T-900) platform framing, grating, handrail posts, rails and toe plates and stairs, 1 lump sum Structural steel: maestrom oxidizers (T-600 and T-700) support framing, platform framing walkways framing, grating, handrail posts, rails and toe plates and stairs 1 lump sum Structural steel: off-spec pond pumps (P-1202A and P-1202B) vault platform support framing, grating, handrail posts, rails and toe plates, 1 lump sum Structural steel: polishing pond pumps (P-1201A and P-1201B) vault platform support framing, grating, handrail posts, rails and toe plates, 1 lump sum Structural steel: clarifiers' access platform framing, grating, handrail posts rails and toe plates and stairs, 1 lump sum Structural steel: valve access platform framing, grating, handrail posts, rails and toe plates and stairs, 1 lump sum Structural steel: pipe supports located inside control building and near service water storage tank, 1 lump sum Structural steel: light stanchions and supports located throughout the facility, 1 lump sum Structural steel: trough supports, 1 lump sum Metal fabrication: ladders, vinton extraction well # 1 building, 1 lump sum Metal fabrication: ladders, vinton extraction well # 2 building, 1 lump sum Metal fabrication: ladders, wehrum extraction well # 1 building, 1 lump sum Metal fabrication: ladders, wehrum extraction well # 2 building, 1 lump sum Metal fabrication: baffles, reaction tank T-800, 1 lump sum Metal fabrication: baffles, reaction tank T-900, 1 lump sum Metal fabrication: half-pipe baffles, reaction tank T-800, 1 lump sum Metal fabrication: half-pipe baffles, reaction tank T-900, 1 lump sum Metal fabrication: elevated flumes F-800 from maelstrom oxidizer T-600 to reaction tank T-800 and F-900 from maelstrom oxidizer T-700 to reaction tank T-900, 1 lump sum Metal fabrication: elevated flume F-801 from reaction tank T-800 to clarifier T-1000, 1 lump sum Metal fabrication: elevated flume F-901 from reaction tank T-900 to clarifier T-1100, 1 lump sum Metal fabrication: pipe bollards, 10 each Mine water extraction pumps and appurtenances: vinton extraction well, 2 each Mine water extraction pumps and appurtenances: wehrum extraction well, 2 each Masonry pump buildings: vinton extraction well # 1 building, 1 lump sum Masonry pump buildings: vinton extraction well # 2 building, 1 lump sum Masonry pump buildings: wehrum extraction well # 1 building, 1 lump sum Masonry pump buildings: wehrum extraction well # 2 building, 1 lump sum Mine water pipe, valves and appurtenances: mine water pipe, 20" HDPE gravity and pressure pipe, 4,420 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 12" HDPE pressure pipe, 210 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 8" HDPE pressure pipe, 415 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 20" SS pressure pipe, 32 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 10" SS pressure pipe, 12 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 8" SS pressure pipe, 130 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 4" SS pressure pipe, 12 linear feet Mine water pipe, valves and appurtenances: mine water pipe, 1" and 1/2" SS pressure pipe at pressure gages, drains, and the like, 20 linear feet Mine water pipe, valves and appurtenances: air/vacuum release valve assembly complete, 5 each Mine water pipe, valves and appurtenances: cleanout assemblies, 11 each Mine water pipe, valves and appurtenances: HDPE/steel pipe waterline testing, 1 lump sum Process pipe, valves and appurtenances: process water pipe, 3" pipe and under, all materials, 3,330 linear feet Process pipe, valves and appurtenances: process water pipe, 4" CS pipe, 500 linear feet Process pipe, valves and appurtenances: process water pipe, 6" CS pipe, 870 linear feet Process pipe, valves and appurtenances: process water pipe, 4" HDPE pipe, 1,800 linear feet Process pipe, valves and appurtenances: process water pipe, 6" HDPE pipe, 930 linear feet Process pipe, valves and appurtenances: process water pipe, 8" HDPE pipe, 27,530 linear feet Process pipe, valves and appurtenances: process water pipe, 10" HDPE pipe, 570 linear feet Process pipe, valves and appurtenances: process water pipe, 16" HDPE pipe, 30 linear feet Process pipe, valves and appurtenances: process water pipe, 20" HDPE pipe, 600 linear feet Process pipe, valves and appurtenances: process water pipe, 24" HDPE pipe, 200 linear feet Process pipe, valves and appurtenances: air/vacuum release valve assembly—complete, 1 each Process pipe, valves and appurtenances: cleanout assemblies, 12 each Process pipe, valves and appurtenances: HDPE/steel pipe waterline testing, 1 lump sum Service water system, 1 lump sum Blending tank and appurtenances, 1 lump sum Decarbonation tanks and appurtenances, 1 lump sum Reaction tanks and appurtenances, 1 lump sum Flocculating clarifiers, 1 lump sum Relocation and upgrade of the lancashire hydrated lime system, 1 lump sum Lancashire repair—breezeway closure, 1 lump sum Dry polymer mix and feed system, 1 lump sum Sludge disposal and sludge recycle pumps: sludge disposal pumps, 4 each Sludge disposal and sludge recycle pumps: sludge recycle pumps, 3 each Miscellaneous pumps: off-spec pond pumps, 2 each Miscellaneous pumps: treatment building sumps, 2 each Noise control, 1 lump sum Replacement wetland: off-site topsoil, 150 tons Replacement wetland: spent mushroom substrate, 580 cubic yards Replacement wetland: mulching materials, 0.36 acre Replacement wetland: wetland seed mix, 8 pounds Polishing pond and constructed wetland: polishing pond, 1 lump sum Polishing pond and constructed wetland: constructed wetland, 1 lump sum Rough carpentry, 1 lump sum Interior architectural woodwork, 1 lump sum Building insulation, 1 lump sum Flashing and sheet metal, 1 lump sum Joint sealers, 1 lump sum FRP doors and aluminum frames, 1 lump sum Overhead coiling doors, 1 lump sum Door hardware, 1 lump sum Metal building systems, 1 lump sum HVAC equipment and ducting, 1 lump sum Plumbing, 1 lump sum Painting and coating, 1 lump sum Specialty signs, 1 lump sum Fire extinguishers and accessories, 1 lump sum Toilet accessories, 1 lump sum Metal lockers, 1 lump sum Instrumentation, 1 lump sum SCADA system: PLC panel, 1 lump sum SCADA system: remaining items, 1 lump sum Electrical power and lighting: generator, 1 lump sum Electrical power and lighting: automatic transfer switch, 1 lump sum Electrical power and lighting: motor control center, 1 lump sum Electrical power and lighting: VFDs, 1 lump sum Electrical power and lighting: power distribution transformers, 1 lump sum Electrical power and lighting: three phase panel boards, 1 lump sum Electrical power and lighting: remaining items, 1 lump sum Electrical power and lighting: service fees to Penelec, 1 invoice Security system and intrusion detection: cameras, 4 each Security system and intrusion detection: installation of security system and intrusion detection, 1 lump sum Commissioning, demonstration and operator training: start-up/wet commissioning, 1 lump sum Commissioning, demonstration and operator training: contractor operational period, 1 lump sum Commissioning, demonstration and operator training: onsite training services, 1 lump sum Office facility, 1 lump sum This bid issued on November 5, 2021, and bids will be opened on January 13, 2022, at 2 p.m. A mandatory prebid conference is scheduled for December 15, 2021, at 10 a.m. Representatives from the Department of Environmental Protection (Department) will meet the contractors at the Department of Environmental Protection, Bureau of Abandoned Mine Reclamation, Cambria Office, 1st Floor, Room 1A and 1B, 286 Industrial Park Road, Ebensburg, PA 15931. Failure to attend the prebid conference will be cause for rejection of the bid. Bid documents, including drawings in PDF format and AutoCAD Map 3D format, may be downloaded for free beginning on the issue date from the Department of Environmental Protection by going to www.BidExpress.com. This project is financed by the Federal government under the authority given it by the Surface Mining Control and Reclamation of Act of 1977 (act) (30 U.S.C.A. §§ 1201—1328) and is subject to the act and to the Federal grant for this project. Contact the Construction Contracts Section at (717) 787-7820 or RA-ConstructionContr@pa.gov for more information on this bid.
PATRICK McDONNELL,
Secretary
[Pa.B. Doc. No. 21-2071. Filed for public inspection December 10, 2021, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.