Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 97-245

PROPOSED RULEMAKING

ENVIRONMENTAL QUALITY BOARD

[25 PA. CODE CH. 77]

Noncoal Regulations

[27 Pa.B. 875]

   The Environmental Quality Board (Board) proposes to amend Chapter 77 (relating to noncoal mining). The amendments are the result of the Department of Environmental Protection's (Department) Regulatory Basics Initiative to revise regulations which impose disproportionate economic costs, which are obsolete or redundant, which are prescriptive or technology specific, and which lack clarity.

   This proposal was adopted by the Board at its meeting of December 17, 1996.

A.  Effective Date

   These proposed amendments will go into effect upon publication in the Pennsylvania Bulletin as final rulemaking.

B.  Contact Persons

   For further information contact Evan T. Shuster, Chief, Division of Monitoring and Compliance, Bureau of Mining and Reclamation, P. O. Box 8461, Room 203 Executive House, Harrisburg, PA 17105-8461 (717) 787-7846, or Leigh Cohen, Assistant Counsel, Bureau of Regulatory Counsel, P. O. Box 8464, Rachel Carson State Office Building, Harrisburg, PA 17105-8464 (717) 787-7060. Information regarding submitting comments on this proposal appears in Section I of this Preamble. Persons with a disability may use the AT&T Relay Service by calling (800) 654-5984 (TDD users) or (800) 654-5988 (voice users). This proposal is available electronically through the Department's Web site (http://www.dep.state.pa.us).

C.  Statutory Authority

   These amendments are proposed under the rulemaking authority of the following acts:  section 11(a) of the Noncoal Surface Mining Conservation and Reclamation Act (Noncoal SMCRA) (52 P. S. § 3311(a)); section 5(b) of The Clean Streams Law (35 P. S. § 691.5(b)); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20) which authorizes the Board to adopt regulations necessary for the Department to perform its work.

D.  Background and Purpose

   In August 1995, the Department announced the Regulatory Basics Initiative to revise regulations which impose disproportionate economic costs, which are obsolete or redundant, which are prescriptive or technology specific, and which lack clarity. Under this initiative the Department solicited public input through a notice in the Pennsylvania Bulletin and the Department's web site (http://www.dep.state.pa.us). The amendments being proposed at this time are the result of suggestions from the public and the Department's own review of its regulations. Additionally, the Department proposes to insert, where appropriate, equivalent measures in standard international metric units.

E.  Summary of Regulatory Requirements

   A description of the revisions to Chapter 77 follows:

§ 77.1 (relating to definitions)

   The amendment adds a definition for ''general permit.'' The term is used extensively in proposed Subchapter J (relating to general permits) which establishes procedures for developing general permits.

§ 77.51 (relating to license requirement)

   This amendment replaces the terms ''small noncoal license'' and ''small noncoal exemption,'' with a general reference to the Noncoal Surface Mining Conservation and Reclamation Act (Noncoal SMCRA) (52 P. S. §§ 3301--3826) requirements for liability insurance.

§ 77.53 (relating to suspension and revocation)

   Subsection (a) is revised to correctly refer to § 77.51(e) which deals with issuing and renewing licenses.

§ 77.54 (relating to fees)

   New language is inserted to acknowledge that alternate fee requirements may be established in Noncoal SMCRA which will supersede the requirements of this section.

§ 77.102 (relating to compliance with existing permits)

   Noncoal surface mine permits issued prior to the effective date of this chapter (March 17, 1990) contain a condition which requires reclamation concurrent with the progress of the proposed mining operation to the highest extent possible. This requirement was in the regulations prior to March 17, 1990. In some cases, concurrent reclamation may not have been fully addressed in the approved mining plans in these earlier permits. In other cases changing market conditions and long term overburdened storage have created conditions whereby reclamation is not current with the progress of mineral extraction. These conditions create large and extremely expensive reclamation obligations for this type of operation. These obligations can likely exist after all mineral extraction is completed and income from the mining operation has ceased. If this obligation is not fulfilled by the permittee, the obligation passes to the Commonwealth. In order to minimize the chance that this situation will occur, this section is revised to allow the Department to require a modification to mining and reclamation plans in permits issued prior to March 17, 1990, in order to comply with the applicable concurrent reclamation requirements, to the extent that it is practicable.

§ 77.108 (relating to permits for small noncoal operations)

   The title of this section is revised by deleting the word ''general.'' The use of this term is confusing since this section does not deal with general permits as that term is used in Noncoal SMCRA. Other amendments to this section increase the allowable yearly tonnage limit for small noncoal operations from 2,000 to 10,000 tons per year; add a reference to § 77.163 (relating to right of entry); and require a blast plan if blasting will occur.

   Language is added to subsection (f) to indicate clearly that the Department is responsible for publishing public notice of applications and bond releases in the Pennsylvania Bulletin and that the requirement to publicize notices in local newspapers does not apply to activities authorized under this section.

   The allowable production on small noncoal permits is increased from 2,000 to 10,000 tons per year with the limit applied to each permit issued under this section. A provision requiring mineral production by an applicant's family to be attributed to the applicant is no longer appropriate and is deleted.

   The remaining revisions to § 77.108 establish a minimum bond of $1,000 and basic reclamation standards for bond release. The conditions under which the Department may delegate some of its regulatory functions to a conservation district are revised to refer to operations authorized under this section, as provided by the Noncoal SMCRA.

   The proposed amendments to this section will enable a person who holds a large noncoal mining license to obtain a small noncoal permit in appropriate situations.

§ 77.109 (relating to noncoal exploration activities)

   The amendments to this section provide for a less complex authorization process for noncoal exploration activities conducted outside a permit area and less prescriptive performance standards. The information to be provided in a notice of intent to conduct exploration activities is more clearly described.

§ 77.110 (relating to permit waiver--oil and gas well site development)

   The language in this section is proposed to be replaced with a statement that oil and gas well borrow areas which meet the requirements of section 603.1 of the Oil and Gas Act (58 P. S. § 601.603a) are exempt from the provisions of the Noncoal SMCRA.

§ 77.126 (relating to criteria for permit approval or denial)

   This proposed amendment requires the Department to make written findings for permit approval or denial. Language is inserted to clarify the cross reference to § 77.504 (relating to distance limitations and areas designated as unsuitable for mining). Present § 77.126(a)(6) is being deleted since it is redundant and is covered by amended § 77.126(a)(8). These revisions also include language which clearly states that the applicant for a permit transfer must obtain a noncoal license and that the Department will consider the State and Federal endangered species acts in its permit decisions. An incorrect reference in subsection (b)(2) has been corrected.

§ 77.128 (relating to permit terms)

   The proposed amendments expand reasons for which the Department may grant an extension of time for commencement of mining activities to include conditions beyond the control of the permittee when there has been no negligence on the permittee's part.

§ 77.142 (relating to public notice of permit revision)

   This section is proposed to be rewritten to identify specific types of major permit revisions which are required to have public notice. Presently many minor changes to a permit, which have insignificant impacts on the environment and the public, are required to have public notices.

§ 77.144 (relating to transfer of permit)

   The vague language of subsection (c)(1) is proposed to be replaced with a specific reference to § 77.126(a)(6)--(8) which requires the new operator be in compliance with this section and the Noncoal SMCRA. The proposed language does not change the requirements of this section.

§ 77.164 (relating to personal injury and property damage insurance information)

   Language which exempts small noncoal permits from the requirement to provide proof of liability insurance is proposed to be deleted. The new language requires proof of insurance when required by the Noncoal SMCRA. The current language of the Noncoal SMCRA exempts operators who produce less than 2,000 tons (1,960 metric tons) per year from the requirement for liability insurance. Related changes are being made to § 77.231 (relating to terms and conditions for liability).

§ 77.165 (relating to proof of publication)

   This proposed amendment provides that a copy of the weekly advertisements can be submitted as an alternative to a notarized proof of publication.

§ 77.204 (relating to period of liability)

   Current language in this section refers to the Noncoal SMCRA and other environmental acts. This reference is replaced with language from section 9(j) of the Noncoal SMCRA (52 P. S. § 3309(j)) which provides that the Department may release a bond in whole or in part if the Department is satisfied that the reclamation covered by the bond has been accomplished as required by the Noncoal SMCRA.

§ 77.205 (relating to bond adjustments)

   A new provision is proposed to be added which requires the Department to notify the permittee, surety and a person with a property interest in collateral, who has requested this notice of any proposed adjustment to the bond. The provision also provides the permittee an opportunity for an informal conference to discuss bond adjustments prior to the adjustments. The title of this section is revised to read ''bond adjustments.''

§ 77.231 (relating to terms and conditions for liability insurance)

   This proposed amendment references Noncoal SMCRA as the basis for the requirement for liability insurance, and deletes the reference to an operator's status as a small noncoal operator.

§ 77.241 (relating to scope)

   This section is proposed to be amended to provide that the bond release procedures of §§ 77.242 and 77.243 (relating to procedures for seeking release of bond; and criteria and schedule for release of bond) will be followed unless other requirements are specified by these regulations or by a general permit issued. These proposed amendments will allow the Department to develop specific bond release procedures for general permits.

§ 77.242 (relating to procedures for seeking release of bond)

   The proposed amendments require an applicant for bond release to submit the proof of publication within 60 days after filing the application for bond release. This change provides the applicant for bond release a longer time period in which it may submit the proof of publication. Additional language provides that the application will not be considered complete and may be returned if the proof of publication is not received within the 60-day period.

§ 77.243 (relating to criteria and schedule for release of bond)

   This proposed revision replaces a vague and undefined standard for initial bond release with a requirement that land be stabilized to prevent accelerated erosion and sedimentation as specified in Chapter 102 (relating to erosion control).

§ 77.401 (relating to responsibilities)

   This section describes the general requirement for permit applicants to provide information on environmental resources on areas which may be affected by proposed mining activities. A new provision allows the Department to waive any requirements of this subchapter for specific categories of surface mining operations if the information is not needed to evaluate potential impacts on the public and the environment.

§ 77.403 (relating to description of hydrology and geology--general requirements)

   The present regulations convey the impression that similar hydrologic and geologic descriptions may be needed for all types of noncoal operations. The proposed amendments require that an applicant submit geologic and hydrologic information to the extent it is necessary for the Department to evaluate the potential hydrologic impacts of the type of noncoal mining operation being proposed. Subsection (b) is revised to limit the Department's authority to require modeling and other predictive techniques to situations in which the proposed mining has the potential to impact streams or water supplies.

§ 77.456 (relating to reclamation information)

   This section is proposed to be reworded to require reclamation plans to be designed to provide for reclamation which is as concurrent as possible with the progress of mining. An additional change requires a timetable for reclamation activities to meet the requirements of § 77.595 (relating to concurrent reclamation) which relates to concurrent reclamation.

§ 77.461 (relating to dams, ponds, embankments and impoundments)

   This amendment provides that hydrologic and geologic information in general and design plans are required only when requested by the Department. The present regulation requires hydrologic and geologic information for all impounding structures covered by this section. Specific information is often not needed to evaluate sediment ponds.

§ 77.502 (relating to signs and markers)

   The changes to this section require signs which identify a permit to be posted within 60 days after permit issuance. The present regulation is not clear regarding the time period when these signs are to be installed. This amendment also requires the telephone number of the operator to be identified on the sign. The purpose of this is to provide the public with evidence that a permit has been issued on a specific area particularly when the permit is not activated for a long period after permit issuance.

§ 77.503 (relating to casing and sealing of drilled holes)

   These proposed amendments replace the phrase ''Prevent, to the maximum extent possible,'' with the word ''minimize.'' This change is proposed so that the language of this section remains consistent with a similar section in the coal mining regulations which are also being revised under the Regulatory Basics Initiative. These proposed amendments do not weaken or diminish the effectiveness of this performance standard. This amendment also deletes subsection (d) dealing with barriers around oil and gas wells. The identical language is found at § 77.504(c).

§ 77.504 (relating to distance limitations and areas designated unsuitable for mining)

   To maintain consistent terminology within this chapter ''surface mining operations'' is replaced with ''surface mining activities.'' A minor editorial change is made in subsection (c). The principal revision to this section provides that waivers to allow mining activities within 300 feet (91.4 meters) of an occupied dwelling or commercial or industrial building which are signed by a property owner remain effective for subsequent purchasers of the dwelling or building if the purchaser had constructive knowledge of the waiver at time of purchase. The revision also defines what is meant by ''constructive knowledge.''

§ 77.527 (relating to sediment controls)

   The title is proposed to be revised to more accurately indicate the applicability of this section to the more general ''sediment controls.'' Additional changes clarify when sediment controls other than sediment ponds may be used. The subsection dealing with removal of ponds and facilities is modified to include other controls.

§ 77.562 (relating to preblasting surveys)

   The proposed revisions to this section replace a confusing and unenforceable standard for the exemption from requiring preblasting surveys with precise values in a graph (Figure 1). Figure 1 represents levels of ground vibration below which the probability of threshold damage to a dwelling, such as hairline cracks in plaster or drywall, is virtually zero. At higher vibration frequencies the allowable vibration level may exceed the current design standard of 0.5 inches per second peak particle velocity. At extremely low vibration frequencies, the allowable level will be less than 0.5 inches per second. Figure 1 is the result of extensive research by the United States Bureau of Mines (USBM). A discussion of this research can be found in USBM Report of Investigations #8507, Structure Response and Damage Produced by Ground Vibration From Surface Mine Blasting. Additional references to USBM research may be obtained from the person identified in Section B of this Preamble.

   These proposed amendments include provisions which describe how the operator must monitor blasting for compliance with the vibration levels in Figure 1 and which prohibit additional blasting if vibration levels exceed the levels in Figure 1 and preblasting surveys have not been offered. These proposed amendments also clarify that the right to a preblasting survey extends to schools, churches, commercial and industrial buildings.

§ 77.564 (relating to surface blasting requirements)

   These proposed amendments clarify the provision that the maximum peak particle velocity does not apply at a structure owned by the permittee.

§ 77.572 (relating to permit line setback)

   This section is proposed to be rewritten to eliminate confusing language dealing with the distance that a highwall must be set back from the boundary of the bonded area.

§ 77.594 (relating to final slopes)

   Additional language clarifies when the Department will consider approving a final slope greater than 35° on terraced reclamation slopes. The proposal also indicates that the final safety bench in unconsolidated materials is needed to provide for safe exit from a postmining impoundment.

§ 77.595 (relating to concurrent reclamation)

   This section is proposed to be amended by inserting a requirement that reclamation procedures conform to the reclamation plan required by § 77.456. A new subsection is added which specifies the conditions under which reclamation may be delayed until mineral extraction is completed. Reasons for these delays must be explained in the reclamation plan. In any event, reclamation must begin within 30 days of the end of mineral extraction. The purpose of these amendments is to eliminate safety hazards from highwalls as soon as practicable.

Subchapter J (relating to general permits)

   This new subchapter authorizes the Department to develop general permits for categories of noncoal mining where the Department determines that the operations within that category are similar in nature and can be adequately regulated utilizing standard specifications and conditions. It describes the nature of a general permit and that the general permit is a substitute for individual permits. Subchapter J establishes the minimum contents of a general permit, the procedures for issuing a general permit and the requirements for operators wishing to register under the general permit. Finally, the proposal requires persons who operate under the general permit to maintain a mining operator's license and comply with the terms and conditions of the permit, the regulations and applicable laws.

F.  Benefits, Costs and Compliance

   Executive Order 1996-1 requires a cost/benefit analysis of the proposed amendments.

Benefits

   These amendments are proposed in order to revise noncoal mining regulations which impose disproportionate economic costs, regulations which are obsolete or are redundant, regulations which are prescriptive or technology specific, and regulations which lack clarity. The noncoal mining industry, the Department and the public will benefit from these amendments.

   Benefits to the general public cannot be quantified. They include more timely reclamation of highwalls which eliminates potential safety hazards and better documentation of Department decisions to issue permits through the requirement for the Department to provide written findings.

   The benefits to the regulated community will primarily be a savings in permitting costs as follows:

Site/yr.Savings/siteSavings
--Less prescriptive permit application requirements based on type of operation20$2,000$40,000
--General Permit compared to large noncoal permit application10$4,000$40,000
--Large noncoal operation obtaining small noncoal permits10$3,000$30,000
Total Savings$110,000

   The Department will benefit by a savings through a reduction in the time and effort to review permit applications as follows:

   --Reduced review times with general permits:

Affected SitesTime SavedAve. WageSavings/Year
10 large110 hrs.$15/hr.$16,500$16,500
5 small5 hrs.$15/hr.$1,500$1,500

   --Review of hydrology/geology information based on reduced level of detail for certain types of noncoal operations:

Affected SitesTime SavedAve. WageSavings/Year
2040 hrs.$20/hr.$16,000$16,000

   --Large noncoal operations obtaining small noncoal permits:

Affected SitesTime SavedAve. WageSavings/Year
10100 hrs.$15/hr.$15,000$15,000
Total Savings$49,000/yr.

Compliance Costs

   The proposed changes will impose no additional compliance costs on the regulated community.

Compliance Assistance Plan

   Since noncoal mining regulation is an established program in this Commonwealth, compliance assistance will be limited to an effort to inform the industry of the specific changes in the program. This can be accomplished by mailing fact sheets directly to mine operators. If necessary, regional roundtable meetings with the industry will be arranged.

Paperwork Requirements

   The proposed amendments will impose no additional paperwork on the regulated community. It will be necessary for the Department to revise several existing forms and technical guidance documents.

G.  Sunset Review

   These regulations will be reviewed in accordance with the sunset review schedule published by the Department to determine whether the regulations effectively fulfill the goals for which it was intended.

H.  Regulatory Review

   Under section 5(a) of the Regulatory Review Act (71 P. S. § 745.5(a)), on February 4, 1997, the Department submitted a copy of the proposed rulemaking to the Independent Regulatory Review Commission (IRRC) and the Chairpersons of the Senate and House Environmental Resources and Energy Committees. In addition to submitting the proposed amendments, the Department has provided IRRC and the Committees with a copy of a detailed Regulatory Analysis Form prepared by the Department. A copy of this material is available to the public upon request.

   If IRRC has objections to any portion of the proposed amendments, it will notify the Department within 30 days of the close of the public comment period. The notification shall specify the regulatory review criteria which have not been met by that portion. The Regulatory Review Act specifies detailed procedures for review by the Department, the Governor, and the General Assembly before final publication of regulations.

I.  Public Comments

   Written comments. Interested persons are invited to submit written comments, suggestions or objections regarding the proposed amendments to the Environmental Quality Board, P. O. Box 8477, Harrisburg, Pa 17105-8477 (express mail:  Rachel Carson State Office Building, 15th Floor, 400 Market Street, Harrisburg, PA 17101-2301). Comments received by facsimile will not be accepted. Comments, suggestions or objections must be received by the Board by April 16, 1997 (within 60 days of publication in the Pennsylvania Bulletin). Interested persons may also submit a summary of their comments to the Board. The summary may not exceed one page in length and must also be received by April 16, 1997 (within 60 days of publication in the Pennsylvania Bulletin). The one-page summary will be provided to each member of the Board in the agenda packet distributed prior to the meeting at which the final regulations will be considered.

   Electronic comments. Comments may be submitted electronically to the Board at RegComments@A1.dep.state.pa.us and must also be received by the Board by April 16, 1997. A subject heading of the proposal and a return name and address must be included in each transmission. If an acknowledgment of electronic comments is not received by the sender within 2 working days, the comments should be retransmitted to ensure receipt.

J.  Public Hearings

   The Environmental Quality Board will hold two public hearings for the purpose of accepting comments on this proposal. They will be held at 1 p.m. on the following dates:

   March 25, 1997:  Ramada Inn, Route 255 and I-80 (Exit 17), DuBois, PA

   March 31, 1997:  Ramada Inn--Allentown, 1500 MacArthur Road, Whitehall, PA

   Persons wishing to present testimony at a hearing are requested to contact Nancy Roush at the Environmental Quality Board, P. O. Box 8477, Harrisburg, PA 17105-8477 (717) 787-4526, at least 1 week in advance of the hearing to reserve a time to present testimony. Oral testimony is limited to 10 minutes for each witness. Witnesses are requested to submit three written copies of their oral testimony to the hearing chairperson at the hearing. Organizations are limited to designating one witness to present testimony on their behalf at each hearing.

   Persons in need of accommodations as provided for in the Americans With Disabilities Act of 1990 should contact Nancy Roush directly at (717) 787-4526 or through the Pennsylvania AT&T Relay Service at (800) 654-5984 (TTD) to discuss how the Department may accommodate their needs.

JAMES M. SEIF,   
Chairperson

   Fiscal Note:  7-303. (1) Noncoal Surface Mining Conservation and Reclamation Fund; (2)  Implementing Year 1996-97 is $0; (3)  1st Succeeding Year 1997-98 is $5,000; 2nd Succeeding Year 1998-99 is $5,000; 3rd Succeeding Year 1999-00 is $5,000; 4th Succeeding Year 2000-01 is $5,000; 5th Succeeding Year 2001-02 is $5,000; (4)  Fiscal Year 1995-96 $5,447,000; Fiscal Year 1994-95 $4,847,000; Fiscal Year 1993-94 $4,252,000; (7)  Licenses and fees; (8)  recommends adoption.

   These proposed amendments also result in minor cost savings to the Department's Operations and Environmental Program Management Appropriations. Cost savings may be realized from a reduction in administrative workload associated with review of certain permit applications.

Annex A

TITLE 25.  ENVIRONMENTAL PROTECTION

PART I.  DEPARTMENT OF ENVIRONMENTAL PROTECTION

Subpart C.  PROTECTION OF NATURAL RESOURCES

ARTICLE I.  LAND RESOURCES

CHAPTER 77.  NONCOAL MINING

Subchapter A.  GENERAL PROVISIONS

§ 77.1.  Definitions.

   The following words and terms, when used in this chapter, have the following meanings, unless the context clearly indicates otherwise.

*      *      *      *      *

   General permit--[A permit issued under section 26 of the act (52 P. S. § 3326).] A permit that is used for any category of noncoal surface mining activities authorized by the act if the Department determines that the activities in the category are similar in nature and can be adequately regulated utilizing standardized specifications and conditions. A general permit shall specify the design, operating and monitoring requirements as are necessary to adequately protect life, health, property and the environment and under which the surface mining activities may be conducted.

*      *      *      *      *

Subchapter B.  SURFACE MINING OPERATOR'S LICENSE

§ 77.51.  License requirement.

*      *      *      *      *

   (b)  Noncoal surface mining operator's license application. Application for license shall be made in writing on forms prepared and furnished by the Department and contain information pertaining to:

*      *      *      *      *

   (2)  Public liability insurance [except to operators who meet the requirements of and obtain a small noncoal license] when required by the act.

*      *      *      *      *

   (d)  Public liability insurance. [Except for operators who meet the small noncoal exemption,] When required by the act, the applicant shall provide a certificate of insurance for the term of the license covering surface mining activities of the applicant in this Commonwealth under § 77.231 (relating to terms and conditions for liability insurance).

*      *      *      *      *

§ 77.53.  Suspension and revocation.

   (a)  The Department may suspend or revoke a license for a reason listed in § 77.51[(f)](e) (relating to license requirement).

*      *      *      *      *

§ 77.54.  Fees.

   Unless otherwise established by the act, the following license fees apply:

   [(a)](1)  ***

   [(b)](2)  ***

Subchapter C.  PERMITS AND PERMIT APPLICATIONS

GENERAL

§ 77.102.  Compliance with existing permits.

   A person may conduct noncoal mining activities under permits issued by the Department prior to March 17, 1990, under The Clean Streams Law (35 P. S. §§ 691.1--691.1001), the Surface Mining Conservation and Reclamation Act (52 P. S. §§ 1396.1--1396.31) or the act and in compliance with the terms and conditions of the permit except for the requirements of §§ 77.504 and 77.561 (relating to distance limitations and areas designated as unsuitable for mining; and general requirements). The Department may require modification of mining and reclamation plans for a permit issued prior to March 17, 1990, to ensure compliance, to the extent practicable, with the applicable concurrent reclamation requirements.

§ 77.108.[General permits] Permit for small noncoal operations.

   (a)  A person who intends to conduct noncoal surface mining activities from which the total weight of mineral mined per year is less than [2,000] 10,000 tons (9,800 metric tons), prior to conducting the activities, shall apply in writing for a small [operator] noncoal permit on forms furnished by the Department.

   (b)  In lieu of the application requirements of this subchapter and Subchapters G and H (relating to information on environmental resources; and requirements for operation and reclamation plan), an application for a small noncoal permit shall include the following:

*      *      *      *      *

   (3)  Information and documents [concerning right of entry] required by § 77.163 (relating to right of entry).

*      *      *      *      *

   (9)  A United States Geological Survey topographical map or aerial photograph approved by the Department with the proposed permit area outlined.

*      *      *      *      *

   (11)  A notarized statement signed by the applicant stating that the yearly production from the proposed mining activity will not exceed [2,000] 10,000 tons (9,800 metric tons).

   (12)  A blast plan, if applicable.

   (13)  Other information the Department deems relevant.

*      *      *      *      *

   (d)  A person [qualifying for a small operator permit] operating under this section shall comply with Subchapter B (relating to surface mining operator's license).

   (e)  In lieu of the requirements of Subchapter I (relating to environmental protection performance standards), [a small operator] this permit has the following conditions:

*      *      *      *      *

   (3)  The operating face of a bench may not exceed a height of 25 feet (7.6 meters). Multiple benching shall be developed as necessary.

   (4)  Reclamation shall be conducted concurrently with mining operations on a one for one basis--1 acre (0.4 hectare) reclaimed for each acre (0.4 hectare) affected, unless the operator demonstrates, to the Department's satisfaction, acceptable alternate concurrent reclamation.

*      *      *      *      *

   (7)  The permittee shall identify this operation during its lifetime by constructing and maintaining a weather resistant sign with a minimum size of 2 feet by 3 feet (60 centimeters by 91.4 centimeters) to be located immediately adjacent to the closest public highway, from which it shall be clearly visible, at the junction of that public highway with the access road to the operation. The sign shall be painted with a light background and show, in a contrasting color, the name of the permittee and the permit number under which the operation is being conducted. The letters and numbers shall be a minimum height of 1½ inches (3.8 centimeters).

   (8)  [The permittee is responsible for complying with local zoning ordinances under section 16 of the act (52 P. S. § 3316).

   (9)]  Topsoil, as needed for reclamation, shall be conserved onsite for replacement on affected areas upon completion of mining and prior to revegetation. Topsoil in excess of that needed for reclamation, as demonstrated by the applicant, may be removed from the site.

   [(10)](9)  ***

   [(11)](10)  ***

   (f)  [A general] The Department will publish its decision on a small noncoal permit [shall be published] application and a final bond release in the Pennsylvania Bulletin [at least 30 days prior to the effective date of the permit]. Permit applications and bond releases under this section are exempt from the newspaper public notice requirements of section 10(a) of the act (52 P. S. § 3310(a)).

   (g)  It is unlawful for a person who has obtained a small noncoal surface mining permit to mine more than [2,000] 10,000 tons (9,800 metric tons) in a 1-year period from each permit issued under this section.

   (h)  [Minerals produced by members of the applicants' family, relatives or related parties shall be attributed to the applicant unless the applicant demonstrates that there is no direct or indirect business relationship between them.

   (i)  A general small noncoal permit will require] A person operating under a small noncoal permit shall submit a bond in accordance with the bond rates established by the Department. The minimum bond for a small noncoal permit is $1,000.

   (i)  Bond release shall be based on the reclamation requirements under this section in lieu of §§ 77.241--77.243 (relating to release of bonds).

   (j)  The Department may by agreement delegate to a conservation district one or more of its regulatory functions under the act for [surface mining operators licensed to mine less than 2,000 tons of marketable minerals per year] operations authorized under this section as allowed by the act. A conservation district acting under a delegation agreement has the same powers and duties otherwise vested in the Department to implement the act to the extent delegated by agreement.

§ 77.109.  Noncoal exploration activities.

   (a)  [Application. This section applies to a person who conducts or seeks to conduct noncoal exploration outside of the permit area. Noncoal exploration which substantially disturbs the natural land surface shall comply with the minimum performance standards and design requirements of this section. The Department may, if it deems necessary, require compliance with other applicable performance and design requirements of this chapter.

   (b)  Definition. The following word, when used in this section has the following meaning, unless the context clearly indicates otherwise:

   Substantially disturb--For purposes of noncoal exploration, to have an impact upon land, air or water resources by activities such as blasting, mechanical excavation, construction of roads and other access routes, and the placement of structures, excavated earth or other debris on the surface of land.

   (c)  General requirements.

   (1)]  A person who intends to conduct noncoal exploration [during which noncoal minerals will not be removed except from boreholes or coreholes in the area to be explored] outside an existing permit shall[, prior to conducting the exploration,] file with the Department [one copy of] a written notice of intention to explore for each exploration area at least 10 days prior to the start of exploration activities on forms provided by the Department.

   [(2)](b)  The notice shall include:

   [(i)](1)  ***

   [(ii)  The name, address and telephone number of the representative who will be present at and responsible for conducting the exploration activities.

   (iii)](2)  A map, at a scale of 1:24,000, of the exploration area showing the extent of the exploration area and [drill hole] locations of drill holes, exploratory pits, trenches and excavations.

   [(iv)](3)  ***

   (4)  The method of exploration and types of equipment to be used.

   [(v)  A description of the practices proposed to be followed to protect the environment from adverse impacts as a result of the exploration activities.]

   (5)  The purpose of testing.

   (6)  The amount of mineral needed for testing (if exploration is by test pit, trench or excavation).

   (7)  Other information the Department deems relevant to assure compliance with the environmental acts (for example--the location of access roads).

   (c)  Exploration by drilling methods may proceed 10 days after the notice of intent to explore form is submitted to the Department unless notified otherwise by the Department or if the area is located within the distance limitations of § 77.504 (relating to distance limitations and areas designated unsuitable for mining).

   [(3)  A person who conducts noncoal exploration which substantially disturbs the natural land surface shall comply with the noncoal exploration performance and design standards of this section.

   (4)] (d)  ***

   [(5)](e)  ***

   [(6)](f)  A person who conducts noncoal exploration activities will observe the distance limitations under § 77.504 [relating to distance limitations and areas designated unsuitable for mining].

   (g)  Exploration activities shall be conducted to accomplish the following:

   (1)  Minimize environmental impacts on roadways and vegetation.

   (2)  Provide erosion controls for excavated areas, including access roads, in accordance with Chapter 102 (relating to erosion control).

   (3)  Avoid disturbance of wetland areas.

   (h)  The areas affected by the noncoal exploration shall be graded to approximate original contour when possible or restored to a slope not to exceed 35° unless approved by the Department under § 77.594(2)(v) (relating to final slopes), and will contain no depressions which will impound water. Drill holes shall be sealed under § 77.503 (relating to casing and sealing of drilled holes). The affected areas shall be revegetated.

   [(d)  Noncoal exploration performance and design standards. The performance standards in this section are applicable to noncoal exploration which substantially disturbs the land surface.

   (1)  Habitats of wild and endangered species or wetland areas may not be disturbed during noncoal exploration.

   (2)  The person who conducts noncoal exploration shall, to the extent practicable, measure important environmental characteristics of the exploration area during the operations to minimize environmental damage to the area and to provide supportive information for a permit application that the person may submit under this chapter.

   (3)  Vehicular travel on other than established graded and surfaced roads shall be limited by the person who conducts noncoal exploration to that absolutely necessary to conduct the exploration. Vehicular travel shall be confined to graded and surfaced roads during periods when excessive damage to vegetation or rutting of the land surface could result.

   (i)  New roads in the exploration area shall comply with §§ 77.631 and 77.632 (relating to general requirements; and restoration).

   (ii)  Existing roads may be used for exploration in accordance with the following:

   (A)  Applicable Federal, State and local requirements shall be met.

   (B)  If the road is significantly altered for exploration, including, but not limited to, change of grade, widening or change of route, or if use of the road for exploration contributes additional suspended solids to streamflow or runoff, then paragraph (7) shall apply to areas of the road which are altered or which result in these additional contributions.

   (C)  If the road is significantly altered for exploration activities and will remain as a permanent road after exploration activities are completed, the person conducting exploration shall ensure that the requirements of §§ 77.631 and 77.632 are met for the design, construction, alteration and maintenance of the road.

   (iii)  Promptly after exploration activities are completed, existing roads used during exploration shall be restored to one of the following:

   (A)  A condition equal to or better than their pre-exploration condition.

   (B)  The condition required for permanent roads under §§ 77.631 and 77.632.

   (4)  If excavations, artificial flat areas or embankments are created during exploration, these areas shall be returned to the approximate original contour promptly after the features are no longer needed for noncoal exploration.

   (5)  Topsoil shall be removed, stored and redistributed on disturbed areas as necessary to assure successful revegetation.

   (6)  Revegetation of areas disturbed by noncoal exploration shall be performed by the person who conducts the exploration, or his agent.

   (7)  With the exception of small and temporary diversions of overland flow of water around new roads, drill pads and support facilities, an ephemeral, intermittent or perennial streams may not be diverted during noncoal exploration activities. Overland flow of water shall be diverted in a manner that does the following:

   (i)  Prevents erosion.

   (ii)  Prevents additional contributions of suspended solids to streamflow or runoff outside the exploration area, to the extent possible using the best technology currently available.

   (iii)  Complies with other applicable State or Federal requirements.

   (8)  An exploration hole, borehole, well or other exposed underground opening created during exploration shall meet the requirements of § 77.503 (relating to casing and sealing of drilled holes).

   (9)  Facilities and equipment shall be removed from the exploration area promptly when they are no longer needed for exploration, except for those facilities and equipment that the Department determines may remain to do one of the following:

   (i)  Provide additional environmental quality data.

   (ii)  Reduce or control the onsite and offsite effects of the exploration activities.

   (iii)  Facilitate future surface mining and reclamation operations by the person conducting the exploration, under an approved permit.

   (10)  Noncoal exploration shall be conducted in a manner which minimizes disturbance of the prevailing hydrologic balance, and shall include sediment control measures which comply with Chapter 102 (relating to erosion control).

   (11)  Toxic-forming or acid-forming materials shall be handled and disposed of under § 77.529 (relating to acid-forming and toxic-forming spoil).

   (12)  Blasting operations of noncoal exploration sites shall comply with applicable State and Federal laws in the use of explosives and with §§ 77.561(b) and (c) and 77.562 (relating to general requirements; and preblasting surveys).

   (e)  Noncoal exploration compliance duties.

   (1)  Noncoal exploration and reclamation activities which substantially disturb the natural land surface shall be conducted in accordance with the noncoal exploration requirements of applicable State and Federal laws, this chapter and conditions on approval for exploration and reclamation imposed by the Department.

   (2)](i)  [A person who conducts noncoal] Noncoal exploration [in violation of this subchapter] activities shall be subject to the applicable inspection and enforcement provisions of the Department, and Subchapters E and F (relating to civil penalties for noncoal mining activities; and enforcement and inspection).

   [(f)](j)  Public availability of information.

   (1)  Except as provided in paragraph (2), information submitted to the Department under [the subchapter] this section will be made available for public inspection and copying at the appropriate [District Office of the Department] district mining office.

   (2)  Information which pertains only to the analysis of the chemical and physical properties of the mineral ([excepting] except information regarding the mineral or elemental content that is potentially toxic to the environment) will be kept confidential and will not be made a matter of public record.

§ 77.110.  Permit waiver--oil and gas well site development.

   [As used in this section the term ''borrow area'' means an area where minerals are extracted solely for the purpose of oil and gas well development. The noncoal surface mining permit requirements of the act and this chapter do not apply to the extraction of noncoal minerals from borrow areas for the purpose of oil and gas well site development, including access road construction, if the well operator demonstrates, at a minimum, to the Department's satisfaction that the following exist:

   (1)  The noncoal minerals are used solely for site development at a well site regulated under the Oil and Gas Act (58 P. S. § 601.101--601.605).

[Continued on next Web Page]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.