NOTICES
Merger
Without Hearing
[30 Pa.B. 6160] A-110300 F0095 and A-110400 F0040. GPU, Inc., Metropolitan Edison Company, Pennsylvania Electric Company and FirstEnergy Corporation. Joint application for approval of the merger of GPU, Inc., and its Pennsylvania Public Utility Subsidiaries, Metropolitan Edison Company and Pennsylvania Electric Company, with FirstEnergy Corporation.
This Application may be considered without a hearing. Protests or petitions to intervene can be filed with the Pennsylvania Public Utility Commission, P. O. Box 3265, Harrisburg, PA 17105-3265, with a copy served on the applicant on or before December 11, 2000, under 52 Pa. Code (relating to public utilities).
Applicant: GPU, Inc., Metropolitan Edison Company, Pennsylvania Electric Company, FirstEnergy Corporation
Through and By Counsel: W. Edwin Ogden, Alan Michael Seltzer, Ryan, Russell, Ogden and Seltzer, LLP, Suite 301, 1100 Berkshire Boulevard, Reading, PA 19610.
JAMES J. MCNULTY,
Secretary
[Pa.B. Doc. No. 00-2041. Filed for public inspection November 22, 2000, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.