Request for Proposals
[38 Pa.B. 5669]
[Saturday, October 11, 2008]CPC 08.116: The Rehabilitation of Historic South Capitol Park involves the construction of retaining walls, walks, storm drains, landscaping and lighting to rehabilitate historic South Capitol Park. Work includes maintenance of traffic, tree preservation, demolition, masonry for walls and walks, renovation of existing light fixtures, installation of new light fixtures, installation of new storm drainage, stormwater management, water lines and hose bibs, installation of site furniture, landscape and lawn installation. The project is divided into three phases over 2 years. A $100 deposit is required for issuance of project documents. Issue date of proposal will be October 10, 2008, at 2 p.m. A mandatory preproposal conference and walk through will be held on October 30, 2008, at 10 a.m. Convene in Room 630 Main Capitol. Proposals are due on November 12, 2008, at 2 p.m. prevailing time. Project documents may be obtained in Room 630 Main Capitol Building, Harrisburg, PA or by contacting Tara Pyle at (717) 783-6484.
Department/Agency: PA Capitol Preservation Committee
Location: Main Capital Building, Room 630, Harrisburg, PA 17120
County: Dauphin
Duration: April 2009--October 2011
Contact: Chris Ellis
E-Mail Address: cellis@cpc.state.pa.us
Phone: (717) 783-6484
RUTHANN HUBBERT-KEMPER,
Executive Director
[Pa.B. Doc. No. 08-1847. Filed for public inspection October 10, 2008, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.