Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 09-270

NOTICES

Rates to Be Used for Calculating Long-Term Operation and Maintenance Cost Bonds for Water Supply Replacement-Mining Operations

[39 Pa.B. 909]
[Saturday, February 14, 2009]

   The Department of Environmental Protection (Department) announces the rates to be used to calculate bond amounts for water supply replacement operation and maintenance costs for anthracite and bituminous coal and industrial mineral mining operations. The authority for bonding mining operations is found under The Clean Streams Law (35 P. S. §§ 691.1--691.1001), the Surface Mining Conservation and Reclamation Act (52 P. S. §§ 1396.1--1396.19a), the Coal Refuse Disposal Control Act (52 P. S. §§ 30.51--30.66), the Bituminous Mine Subsidence and Land Conservation Act (52 P. S. §§ 1406.1--1406.21), the Noncoal Surface Mining Conservation and Reclamation Act (52 P. S. §§ 3301--3326) and the regulations promulgated thereunder at 25 Pa. Code Chapters 77 and 86 (relating to noncoal mining; and surface mining of coal).

   The rates are used in calculating the water supply operation and maintenance bond amounts for replacement water supplies affected by activities at mining operations including: surface mines, coal refuse disposal sites, coal refuse reprocessing sites, coal processing facilities, underground coal mining operations and industrial mineral surface mines. The procedures for calculating water supply operation and maintenance bonds are described in technical guidance 562-4000-102, ''Increased Operation and Maintenance Costs of Replacement Water Supplies,'' which is available on the Department's web site www.depweb.state.pa., at the Public Participation Center page.

   The Department may review the adequacy of bonds on existing permits at any time. The Department will conduct these reviews before issuing permit renewals. The Department may conduct similar reviews at the mid-term of a permit and before approving a permit revision.

Rates

   The Department calculated the rate of inflation and rate of return using 5-year averages. For the rate of inflation, the Consumer Price Index (Northeast Urban) was averaged for the calendar years 2004--2008, resulting in a rate of 3.46%. For the rate of return, the interest rate for the 20-year Treasury bill as reported by the Federal Reserve was averaged for the calendar years 2004--2008 resulting in a rate of 4.79%.

   For background information and supporting documentation regarding the rates, contact the Bureau of Mining and Reclamation, Division of Monitoring and Compliance, P. O. Box 8461, Harrisburg, PA 17105-8461, (717) 787-5103.

Effective Date

   The rates in this notice become effective on April 1, 2009. They will remain in effect until new rates are published. It is anticipated that these new rates will be published in the Pennsylvania Bulletin in February 2010 to be effective April 1, 2010.

JOHN HANGER,   
Acting Secretary

[Pa.B. Doc. No. 09-270. Filed for public inspection February 13, 2009, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.