NOTICES
Bureau of Maintenance and Operations; Access Route Approval
[42 Pa.B. 3035]
[Saturday, May 26, 2012]Under 75 Pa.C.S. § 4908 (relating to operation of certain combinations on interstate and certain other highways), the Department of Transportation (Department) approved on April 23, 2012, the following access routes for use by the types of truck combinations as indicated:
1. (X) 96" wide twin trailers (28 1/2` maximum length of each trailer).
2. (X) 102" wide 53` long trailer.
3. (X) 102" wide 48` long trailer.
4. (X) 102" wide twin trailers (28 1/2` maximum length-each).
5. (X) 102" wide maxi-cube.
Route Route Length Identification Description Miles TR 594
(Young's Road)from SR 3001 to TR 531 (Lutz Road) 0.60 TR 531
(Lutz Road)from TR 594 to TR 514 (Babcock Road) 0.96 Bridgewater and Jessup Townships failed to respond to the requests for access routes within their jurisdiction in the time frame allowed by 67 Pa. Code § 209.3 (relating to approval of applications). As a result the Department approves these routes to remain compliant with 23 CFR 658.19(h) (relating to reasonable access) regarding roads under jurisdiction of local units of Government.
Questions should be directed to Matthew Hedge at (717) 772-5462.
BARRY SCHOCH, P.E.,
Secretary
[Pa.B. Doc. No. 12-992. Filed for public inspection May 25, 2012, 9:00 a.m.]
No part of the information on this site may be reproduced for profit or sold for profit.This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.