Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 15-1826

NOTICES

SUSQUEHANNA RIVER BASIN COMMISSION

Public Hearing

[45 Pa.B. 6184]
[Saturday, October 10, 2015]

 The Susquehanna River Basin Commission (Commission) will hold a public hearing on October 29, 2015, at 7 p.m. at the East Hanover Township Municipal Building, Main Hall, 8848 Jonestown Road, Grantville, PA 17028 (parking lot entry off of Manada Gap Road; see http://easthanovertwpdcpa.org/index.php/about-contact). The public hearing will end at 9 p.m. or at the conclusion of public testimony, whichever is sooner. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. The projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for December 4, 2015, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is November 9, 2015.

 For further information contact Jason Oyler, General Counsel, (717) 238-0423, Ext. 1312, fax (717) 238-2436.

 Information concerning the applications for these projects is available at the Commission's Water Resource Portal at www.srbc.net/wrp. Additional supporting documents are available to inspect and copy in accordance with the Commission's Access to Records Policy at www.srbc.net/pubinfo/docs/2009-02_Access_to_Records_Policy_20140115.pdf.

Supplementary Information

 The public hearing will cover the following projects:

Projects Scheduled for Action

 1. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.115 mgd (30-day average) from Dug Road Well.

 2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.038 mgd (30-day average) from Hilltop Well.

 3. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.216 mgd (30-day average) from Midway Well 1.

 4. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.110 mgd (30-day average) from Midway Well 2.

 5. Project Sponsor: Byler Golf Management, Inc. Project Facility: Iron Valley Golf Course, Cornwall Borough, Lebanon County, PA. Modification to authorize additional water use purpose (Docket Nos. 19981206 and 19981206-1).

 6. Project Sponsor and Facility: Cabot Oil & Gas Corporation (Tunkhannock Creek), Lenox Township, Susquehanna County, PA. Application for surface water withdrawal of up to 1.500 mgd (peak day).

 7. Project Sponsor and Facility: East Berlin Area Joint Authority, Reading Township, Adams County, PA. Application for groundwater withdrawal of up to 0.072 mgd (30-day average) from Well 1.

 8. Project Sponsor and Facility: East Berlin Area Joint Authority, Reading Township, Adams County, PA. Application for groundwater withdrawal of up to 0.108 mgd (30-day average) from Well 2.

 9. Project Sponsor and Facility: East Berlin Area Joint Authority, East Berlin Borough, Adams County, PA. Application for groundwater withdrawal of up to 0.058 mgd (30-day average) from Well 4.

 10. Project Sponsor and Facility: East Berlin Area Joint Authority, East Berlin Borough, Adams County, PA. Application for renewal with modification to increase groundwater withdrawal limit by an additional 0.048 mgd (30-day average), for a total of up to 0.072 mgd (30-day average) from Well 5 (Docket No. 19860601).

 11. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.059 mgd (30-day average) from Well 3A.

 12. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.028 mgd (30-day average) from Well 4.

 13. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.056 mgd (30-day average) from Well 5.

 14. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.022 mgd (30-day average) from Well 6.

 15. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for groundwater withdrawal of up to 0.046 mgd (30-day average) from Well 7.

 16. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, PA. Application for renewal of groundwater withdrawal of up to 0.320 mgd (30-day average) from Well 1 (Docket No. 19850901).

 17. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, PA. Application for renewal of groundwater withdrawal of up to 0.190 mgd (30-day average) from Well 4 (Docket No. 19850901).

 18. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, PA. Application for renewal of groundwater withdrawal of up to 0.090 mgd (30-day average) from Well 7 (Docket No. 19850901).

 19. Project Sponsor and Facility: Montgomery Water and Sewer Authority, Clinton Township, Lycoming County, PA. Application for groundwater withdrawal of up to 0.360 mgd (30-day average) from Well 4.

 20. Project Sponsor and Facility: Mount Joy Borough Authority, Mount Joy Borough, Lancaster County, PA. Modification to increase combined withdrawal limit by an additional 0.199 mgd (30-day average), for a total combined withdrawal limit of 1.800 mgd (30-day average) from Wells 1 and 2 (Docket No. 20110617).

 21. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Cresson Borough, Cambria County, PA. Application for groundwater withdrawal from Argyle Stone Bridge Well of up to 6.300 mgd (30-day average) from four sources.

 22. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Cresson Township, Cambria County, PA. Application for groundwater withdrawal from Cresson No. 9 Well of up to 6.300 mgd (30-day average) from four sources.

 23. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria County, PA. Application for groundwater withdrawal from Gallitzin Shaft Well 2A (Gallitzin Shaft #2) of up to 6.300 mgd (30-day average) from four sources.

 24. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria County, PA. Application for groundwater withdrawal from Gallitzin Shaft Well 2B (Gallitzin Shaft #1) of up to 6.300 mgd (30-day average) from four sources.

 25. Project Sponsor and Facility: Sugar Hollow Water Services, LLC (Susquehanna River), Eaton Township, Wyoming County, PA. Application for renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20111214).

 26. Project Sponsor and Facility: SWN Production Company, LLC (Susquehanna River), Great Bend Township, Susquehanna County, PA. Application for renewal of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 20111217).

 27. Project Sponsor and Facility: SWN Production Company, LLC (Susquehanna River), Great Bend Township, Susquehanna County, PA. Modification to increase surface water withdrawal by an additional 1.750 mgd (peak day), for a total of up to 2.500 mgd (peak day) (Docket No. 20140302).

 28. Project Sponsor and Facility: SWN Production Company, LLC (Tioga River), Hamilton Township, Tioga County, PA. Application for surface water withdrawal of up to 2.000 mgd (peak day).

 29. Project Sponsor and Facility: Village of Sidney, Delaware County, NY. Modification to extend the approval term of the groundwater withdrawal approval (Docket No. 19860201) to provide time for development of a replacement source for existing Well 2-88.

Project Scheduled for Action Involving a Diversion

 1. Project Sponsor: Seneca Resources Corporation. Project Facility: Impoundment 1, receiving groundwater from Seneca Resources Corporation Wells 5H and 6H and Clermont Wells 1, 3 and 4, Norwich and Sergeant Townships, McKean County, PA. Modification to add two additional sources (Clermont Well 2 and Clermont North Well 2) and increase the into-basin diversion from the Ohio River Basin by an additional 0.504 mgd (peak day), for a total of up to 1.977 mgd (peak day) (Docket No. 20141216).

Opportunity to Appear and Comment

 Interested parties may appear at the hearing to offer comments to the Commission on any project previously listed. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Rules of conduct will be posted on the Commission's web site at www.srbc.net prior to the hearing for review. The presiding officer reserves the right to modify or supplement the rules at the hearing. Written comments on any project previously listed may also be mailed to Jason Oyler, General Counsel, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110-1788, or submitted electronically through www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed or electronically submitted must be received by the Commission on or before November 9, 2015, to be considered.

Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR Parts 806—808.

Dated: September 24, 2015.

ANDREW D. DEHOFF, 
Executive Director

[Pa.B. Doc. No. 15-1826. Filed for public inspection October 9, 2015, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.