Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 18-1610

NOTICES

SUSQUEHANNA RIVER
BASIN COMMISSION

Public Hearing

[48 Pa.B. 6639]
[Saturday, October 13, 2018]

 The Susquehanna River Basin Commission (Commission) will hold a public hearing on November 1, 2018, at 2:30 p.m. at the Pennsylvania State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg, PA. The public hearing will end at 5 p.m. or at the conclusion of public testimony, whichever is sooner. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. These projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for December 6, 2018, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is November 13, 2018.

 For further information contact Ava Stoops, Administrative Specialist, (717) 238-0423, fax (717) 238-2436.

 Information concerning the applications for these projects is available at the Commission's Water Application and Approval Viewer at https://mdw.srbc.net/waav. Additional supporting documents are available to inspect and copy in accordance with the Commission's Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.

Supplementary Information

 The public hearing will cover the following projects:

Projects Scheduled for Action

 1. Project Sponsor and Facility: City of Aberdeen, Har-ford County, MD. Modification to extend the approval term of the surface water withdrawal approval (Docket No. 20021210) to be coterminous with a revised Maryland Department of the Environment State Water Appropriation and Use Permit for the Aberdeen Proving Ground-Aberdeen Area.

 2. Project Sponsor and Facility: City of Aberdeen, Harford County, MD. Modification to extend the approval term of the consumptive use approval (Docket No. 20021210) to be coterminous with a revised Maryland Department of the Environment State Water Appropriation and Use Permit for the Aberdeen Proving Ground-Aberdeen Area.

 3. Project Sponsor and Facility: Adams & Hollenbeck Waterworks, LLC (Salt Lick Creek), New Milford Township, Susquehanna County, PA. Application for renewal of surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 20141209).

 4. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Beech Mountain System, Butler Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.124 mgd (30-day average) from Beech Mountain Well 3.

 5. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Beech Mountain System, Butler Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.144 mgd (30-day average) from Beech Mountain Well 1.

 6. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Beech Mountain System, Butler Township, Luzerne County, PA. Application for groundwater withdrawal of up to 0.144 mgd (30-day average) from Beech Mountain Well 2.

 7. Project Sponsor and Facility: ARD Operating, LLC (Pine Creek), Watson Township, Lycoming County, PA. Application for renewal of surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 20141201).

 8. Project Sponsor and Facility: Bloomfield Borough Water Authority, Bloomfield Borough, Perry County, PA. Application for groundwater withdrawal of up to 0.055 mgd (30-day average) from Perry Village Well 2.

 9. Project Sponsor and Facility: Denver Borough Authority, Denver Borough, Lancaster County, PA. Application for renewal of groundwater withdrawal of up to 0.098 mgd (30-day average) from Well 2 (Docket No. 19890104).

 10. Project Sponsor and Facility: Denver Borough Authority, Denver Borough, Lancaster County, PA. Application for renewal of groundwater withdrawal of up to 0.092 mgd (30-day average) from Well 3 (Docket No. 19890104).

 11. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for renewal of groundwater withdrawal of up to 0.045 mgd (30-day average) from Well 9 (Docket No. 19890101).

 12. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Application for renewal of groundwater withdrawal of up to 0.059 mgd (30-day average) from Well 10 (Docket No. 19890101).

 13. Project Sponsor and Facility: Eclipse Resources-PA, LP (Pine Creek), Gaines Township, Tioga County, PA. Application for surface water withdrawal of up to 3.000 mgd (peak day).

 14. Project Sponsor and Facility: Masonic Village at Elizabethtown, West Donegal Township, Lancaster County, PA. Modification to increase consumptive use by an additional 0.055 mgd (peak day), for a total consumptive use of up to 0.230 mgd (peak day) (Docket No. 20030811).

 15. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Seeley Creek), Wells Township, Bradford County, PA. Application for renewal of surface water withdrawal of up to 0.750 mgd (peak day) (Docket No. 20141212).

 16. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Wyalusing Creek), Stevens Township, Bradford County, PA. Application for renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20141213).

 17. Project Sponsor and Facility: Schuylkill Energy Resources, Inc., Mahanoy Township, Schuylkill County, PA. Application for renewal of groundwater withdrawal of up to 5.000 mgd (30-day average) from Maple Hill Mine Shaft Well (Docket No. 19870101).

 18. Project Sponsor and Facility: Schuylkill Energy Resources, Inc., Mahanoy Township, Schuylkill County, PA. Application for renewal of consumptive use of up to 2.550 mgd (peak day) (Docket No. 19870101).

 19. Project Sponsor and Facility: SWEPI, LP (Cowan-esque River), Nelson Township, Tioga County, PA. Application for renewal of surface water withdrawal of up to 0.533 mgd (peak day) (Docket No. 20141211).

 20. Project Sponsor and Facility: Tenaska Resources, LLC (Cowanesque River), Westfield Township, Tioga County, PA. Application for renewal of surface water withdrawal of up to 0.400 mgd (peak day) (Docket No. 20141214).

Project Scheduled for Action Involving a Diversion

 21. Project Sponsor and Facility: City of Aberdeen, Harford County, MD. Modification to extend the approval term of the out-of-basin diversion approval (Docket No. 20021210) to be coterminous with a revised Maryland Department of the Environment State Water Appropriation and Use Permit for the Aberdeen Proving Ground-Aberdeen Area.

Commission-Initiated Project Approval Modifications

 1. Project Sponsor and Facility: Fox Hill Country Club, Exeter Borough, Luzerne County, PA. Conforming the grandfathering amount with the forthcoming determination for a groundwater withdrawal of up to 0.125 mgd (30-day average) from the Halfway House Well (Docket No. 20020605).

 2. Project Sponsor and Facility: Norwich Pharmaceuticals, Inc., Town of North Norwich, Chenango County, NY. Conforming the grandfathering amount with the forthcoming determination for groundwater withdrawals of up to 0.106 mgd (30-day average) from Well 1 and up to 0.082 mgd (30-day average) from Well 2 (Docket No. 20050902).

Opportunity to Appear and Comment

 Interested parties may appear at the hearing to offer comments to the Commission on any previously listed business required to be subject of a public hearing. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Guidelines for the public hearing are posted on the Commission's web site, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement the guidelines at the hearing. Written comments on any previously listed business required to be subject of a public hearing may also be mailed to Ava Stoops, Administrative Specialist, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110-1788, or submitted electronically through www.srbc.net/about/meetings-events/public-hearing.html. Comments mailed or electronically submitted must be received by the Commission on or before November 13, 2018, to be considered.

Authority: Pub.L. No. 91-575, 84 Stat. 1509 et seq., 18 CFR Parts 806—808

Dated: September 28, 2018

ANDREW D. DEHOFF, 
Executive Director

[Pa.B. Doc. No. 18-1610. Filed for public inspection October 12, 2018, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.