Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 5598 (August 31, 2024).

25 Pa. Code § 273.131. Basic requirements.

PHASE II APPLICATION REQUIREMENTS—
GENERAL PROVISIONS


§ 273.131. Basic requirements.

 (a)  The Phase II permit application shall:

   (1)  Comply with § §  273.132—273.137, 273.141, 273.142, 273.151, 273.152, 273.161—273.163, 273.171, 273.181, 273.191 and 273.192.

   (2)  Comply with Chapter 271, Subchapter D (relating to financial assurances requirements).

 (b)  Applications, plans, cross sections, modules and narratives shall demonstrate how the construction and operating requirements of Subchapter C (relating to operating requirements) will be implemented, and shall include quality control measures necessary to ensure proper implementation.

 (c)  The plans, designs, cross sections and maps required by this section and § §  273.132—273.137, 273.141, 273.142, 273.151, 273.152, 273.161—273.163, 273.171, 273.181, 273.191 and 273.192 shall be on a scale in which 1 inch equals no more than 200 feet with 10-foot maximum contour intervals.



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.