§ 275.205. Erosion control.
(a) The operator shall manage surface water and control erosion and sedimentation to meet the applicable requirements of Chapter 102 (relating to erosion and sediment control).
(b) For land reclamation, rills and gullies shall be filled, graded or otherwise stabilized and the area reseeded or replanted when rills or gullies deeper than 9 inches form in areas where sewage sludge has been applied or stored.
(c) For agricultural utilization and land disposal, rills and gullies shall be filled, graded or otherwise stabilized and, when necessary, the area reseeded or replanted, when rills or gullies deeper than 3 inches form in areas where sewage sludge has been applied or stored.
(d) The Department will require that rills or gullies of lesser size be stabilized and the area reseeded or replanted if the rills or gullies may result in additional erosion, sedimentation or pollution.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.