WATER QUALITY MONITORING
§ 277.281. General requirements.
(a) A person or municipality that operates a construction/demolition waste landfill shall install, operate and maintain a monitoring system that can detect the entry of solid waste, solid waste constituents, leachate, contaminants or constituents of decomposition into the groundwater or surface water. The monitoring system shall comply with this section and § § 277.282277.288.
(b) A person or municipality may not construct, install or use a monitoring system for a construction/demolition waste landfill until that system has first been approved by the Department, in writing.
Source The provisions of this § 277.281 amended December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685. Immediately preceding text appears at serial page (226315).
Cross References This section cited in 25 Pa. Code § 271.113 (relating to closure plan); 25 Pa. Code § 277.116 (relating to groundwater quality description); and 25 Pa. Code § 277.152 (relating to water quality monitoring plan).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.