§ 77.526. Treatment facilities.
(a) At a minimum, facilities and measures for treating discharges from disturbed areas shall be designed, constructed and maintained to treat the runoff from a 10-year, 24-hour precipitation event and groundwater contribution. Treatment facilities for process water shall be adequate to treat the total volume of process water plus additional water contribution to the system. Facilities and measures for treating discharges shall be based on good engineering design.
(b) The design, construction and maintenance of a treatment facility does not relieve an operator of the responsibility to comply with effluent standards as provided for in § 77.522 (relating to effluent standards).
Source The provisions of this § 77.526 adopted March 16, 1990, effective March 17, 1990, 20 Pa.B. 1643.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.