§ 78.33. Effect of panel on time for permit issuance.
The period of time during which the objections are being considered by a full panel is not included in the 45-day period for the issuance or denial of a permit under section 201(e) of the act (58 P.S. § 601.201(e)).
Source The provisions of this § 78.33 adopted July 28, 1989, effective July 29, 1989, 19 Pa.B. 3229.
Cross References This section cited in 25 Pa. Code § 78.25 (relating to conferencesgeneral).