Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 5598 (August 31, 2024).

25 Pa. Code § 78.73. General provision for well construction and operation.

§ 78.73. General provision for well construction and operation.

 (a)  The operator shall construct and operate the well in accordance with this chapter and ensure that the integrity of the well is maintained and health, safety, environment and property are protected.

 (b)  The operator shall prevent gas, oil, brine, completion and servicing fluids, and any other fluids or materials from below the casing seat from entering fresh groundwater, and shall otherwise prevent pollution or diminution of fresh groundwater.

 (c)  After a well has been completed, recompleted, reconditioned or altered the operator shall prevent surface shut-in pressure and surface producing back pressure inside the surface casing or coal protective casing from exceeding the following pressure: 80% multiplied by 0.433 psi per foot multiplied by the casing length (in feet) of the applicable casing.

 (d)  After a well has been completed, recompleted, reconditioned or altered, if the surface shut-in pressure or surface producing back pressure exceeds the pressure as calculated in subsection (c), the operator shall take action to prevent the migration of gas and other fluids from lower formations into fresh groundwater. To meet this standard the operator may cement or install on a packer sufficient intermediate or production casing or take other actions approved by the Department. This section does not apply during testing for mechanical integrity in accordance with State or Federal requirements.

 (e)  Excess gas encountered during drilling, completion or stimulation shall be flared, captured or diverted away from the drilling rig in a manner that does not create a hazard to the public health or safety.

 (f)  Except for gas storage wells, the well must be equipped with a check valve to prevent backflow from the pipelines into the well.

Source

   The provisions of this §  78.73 adopted July 28, 1989, effective July 29, 1989, 19 Pa.B. 3229; amended February 4, 2011, effective February 5, 2011, 41 Pa.B. 805. Immediately preceding text appears at serial pages (276324) to (276325).

Cross References

   This section cited in 25 Pa. Code §  78.83 (relating to surface and coal protective casing and cementing procedures); 25 Pa. Code §  78.83b (relating to casing and cementing—lost circulation); and 25 Pa. Code §  78.88 (relating to mechanical integrity of operating wells).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.