§ 89.132. Soil stockpiling.
If not utilized immediately, the A horizon specified in § 89.131(b) (relating to soil removal) and the B horizon or other suitable soil materials specified in § 89.131(c) and (d) shall be stored separately from each other and from spoil. These stockpiles shall be placed within the permit area where they are not disturbed or exposed to excessive water or wind erosion before the stockpiled horizons can be redistributed. Stockpiles in place for more than 30 days shall meet the requirements of § 89.22(e) (relating to topsoil removal and storage).
Source The provisions of this § 89.132 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective July 31, 1982, 12 Pa.B. 2382.
Cross References This section cited in 25 Pa. Code § 89.122 (relating to prime farmlands).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.