Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 5598 (August 31, 2024).

25 Pa. Code § 90.163. Prime farmland: soil stockpiling.

§ 90.163. Prime farmland: soil stockpiling.

 If not utilized immediately, the A horizon specified in §  90.162(b) (relating to prime farmland: soil removal) and the B horizon or other suitable soil materials specified in §  90.162(c) and (d) shall be stored separately from each other and from spoil. These stockpiles shall be placed within the permit area where they are not disturbed or exposed to excessive water or wind erosion before the stockpiled horizons can be redistributed. Stockpiles in place for more than 30 days shall meet the requirements of §  90.98 (relating to topsoil: storage).

Source

   The provisions of this §  90.163 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective July 31, 1982, 12 Pa.B. 2382.

Cross References

   This section cited in 25 Pa. Code §  86.159 (relating to self-bonding); 25 Pa. Code §  90.45 (relating to prime farmland); 25 Pa. Code §  90.125 (relating to coal refuse disposal: construction requirements); 25 Pa. Code §  90.151 (relating to revegetation: general requirements); and 25 Pa. Code §  90.161 (relating to prime farmland: special requirements).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.