§ 90.302. Definitions.
The following words and terms, when used in this subchapter, have the following meanings, unless the context clearly indicates otherwise:
Actual improvementThe reduction of the baseline pollution load resulting from the implementation of the approved pollution abatement plan; except that any reduction of the baseline pollution load achieved by water treatment may not be considered as actual improvement provided that treatment approved by the Department of the coal refuse before, during or after placement in the coal refuse disposal area will not be considered to be water treatment.
Baseline pollution loadThe characterization of the pollutional material being discharged from or on the pollution abatement area, described in terms of mass discharge for each parameter deemed relevant by the Department, including seasonal variations and variations in response to precipitation events. The Department will establish in each authorization the specific parameters it deems relevant for the baseline pollution load, including, at a minimum, iron and acid loadings.
Best professional judgmentThe highest quality technical opinion forming the basis for the terms and conditions of the treatment level required after consideration of all reasonably available and pertinent data. The treatment levels shall be established by the Department under sections 301 and 402 of the Federal Clean Water Act (33 U.S.C.A. § § 1311 and 1342).
Best technologyMeasures and practices which will abate or ameliorate, to the maximum extent possible, discharges from or on the pollution abatement area. These measures include engineering, geochemical or other applicable practices.
Coal refuse disposal activities(i) The storage, dumping or disposal of any waste coal, rock, shale, slurry, culm, gob, boney, slate, clay, underground development wastes, coal processing wastes, excess soil and related materials, associated with or near a coal seam, that are either brought above ground or otherwise removed from a coal mine in the process of mining coal or are separated from coal during the cleaning or preparation operations.
(ii) The term does not include the removal or storage of overburden from surface mining activities.
Coal remining operationA coal mining operation at a site on which coal mining was previously conducted and where the site has been abandoned or the performance bond has been forfeited.
Encountered discharge(i) A pre-existing discharge intercepted in the course of active surface mining activities, including, but not limited to, overburden removal, coal extraction and backfilling, or that occurs in the pit, any mining-related conveyance, sedimentation pond or treatment pond.
(ii) the term does not include diversions of surface water and shallow groundwater flow from areas undisturbed by the implementation of the pollution abatement plan which would otherwise drain into the affected area so long as they are designed, operated and maintained in accordance with § 90.104(b)(g) (relating to hydrologic balance: diversions).
Excess soil and related material(i) Rock, clay or other material located immediately above or below a coal seam and which are extracted from a coal mine during the process of mining coal.
(ii) The term does not include topsoil or subsoil.
Pollution abatement area
(i) The part of the permit area that is causing or contributing to the baseline pollution load.
(ii) The term includes adjacent and nearby areas that must be affected to bring about significant improvements of the baseline pollution load and may include the immediate locations of the discharges.
Pollution abatement planBest management practices (BMP), including, but not limited to, the addition of alkaline material, special handling plans for managing toxic and acid forming material, regrading, revegetation and daylighting, that when implemented will result in reduction of the baseline pollution load.
Pre-existing discharge(i) Any discharge resulting from mining activities that have been abandoned prior to the time of a remining permit application.
(ii) The term includes a pre-existing discharge that is relocated as a result of the implementation BMPs in the pollution abatement plan.
Steep slope(i) Any slope, including abandoned mine land features, above 20 degrees or a lesser slope as may be defined by the Department after consideration of soil, climate and other characteristics of a region.
(ii) The term does not apply to situations in which an operator is mining on flat or gently rolling terrain, on which an occasional steep slope is encountered and through which the mining operation is to proceed, leaving a plain or predominantly flat area.
Authority The provisions of this § 90.302 amended under section 5 of The Clean Streams Law (35 P.S. § 691.5); sections 4(a) and 4.2 of the Surface Mining Conservation and Reclamation Act (52 P.S. § § 1396.4(a) and 1396.4b); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).
Source The provisions of this § 90.302 amended October 21, 2016, effective October 22, 2016, 46 Pa.B. 6780. Immediately preceding text appears at serial pages (281275) to (281276).