§ 43.27. Loose rock.
(a) The superintendent of the tunnel shall order a competent person to make a daily inspection of the roof. All loose pieces of rock shall be removed from the roof and sides of the excavation.
(b) After a blast is fired, loosened pieces of rock shall be scaled from the roof and sides of the excavation. After the blasting is completed, the entire locality shall be thoroughly scaled and all loose rock or ground shall be removed and the excavation made safe before proceeding with the work.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.