§ 5.165. Repairs.
(a) When major repairs are necessary in any building, work shall cease shall be guarded with standard railings, as provided in Chapter 47, Subchapter G (relating to railings, toeboards, open-sided floors, platforms and runways) of by the removal of all loose powder and dust and thoroughly wetting down all parts of such machine and room. Repairs shall be made only by persons designated by the management. Caked powder may be removed by soaking with water and then loosening by means of a wooden shovel or wooden spud.
(b) The number of employes present shall be kept to a minimum by the millwright or mechanic, depending upon services needed.
(c) When repairs are complete, all tools taken to the mill shall be accounted for and removed before starting the mill.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.