§ 183.2. Schedule for connection to the SURE system.
(a) Phase 1 counties shall be connected to the SURE system by December 31, 2002.
(b) Phase 2 counties shall be connected to the SURE system by the May 20, 2003, municipal primary.
(c) Phase 3 counties shall be connected to the SURE system by the November 4, 2003, municipal election. Phase 3 counties shall be connected in the following order:
(1) Group 1.
(2) Group 2.
(3) Group 3.
(4) Group 4.
(5) Group 5.
(6) Group 6.
(7) Group 7.
(8) Group 8.
Source The provisions of this § 183.2 adopted December 27, 2002, effective December 20, 2002, 32 Pa.B. 6339; amended December 27, 2002, effective January 27, 2003, 32 Pa.B. 6340.