7 Pa. Code § 59a.26. Plans for construction and reconstruction.

§ 59a.26. Plans for construction and reconstruction.

 (a)  Specific requirements. Properly prepared plans for all transfer stations, receiving stations, and milk plants regulated under this chapter which are constructed, reconstructed, or extensively altered shall be submitted to the Secretary for written approval before work is begun. Plans must likewise be approved before construction or extensive modification of a manure storage system; installation of a bulk milk storage tank; installation of a milk transfer system on a dairy farm; or installation of milk handling equipment in a transfer station, receiving station, or milk plant.

 (b)  Reference to applicable provisions of the Grade ‘‘A’’ PMO. The provisions of the Grade ‘‘A’’ PMO, in particular section 12, regarding plans for construction and reconstruction, apply to this section to the extent described in §  59a.11 (relating to adoption of Grade ‘‘A’’ PMO).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.