§ 145.142. Definitions.
The following words and terms, when used in this subchapter, have the following meanings, unless the context clearly indicates otherwise:
CEMSContinuous Emission Monitoring SystemThe equipment required under this subchapter or Chapter 139 (relating to sampling and testing) to sample, analyze, measure and provide, by readings taken at least every 15 minutes of the measured parameters, a permanent record of NOx emissions.
CalcineTo heat a substance to a high temperature, but below its melting or fusing point, to bring about thermal decomposition or a phase transition in its physical or chemical constitution.
ClinkerThe product of a Portland cement kiln from which finished cement is manufactured by milling and grinding.
Long dry-process cement kilnA Portland cement kiln that employs no preheating of the feed. The inlet feed to the kiln is dry.
Long wet-process cement kilnA Portland cement kiln that employs no preheating of the feed. The inlet feed to the kiln is a slurry.
Portland cementA hydraulic cement produced by pulverizing clinker consisting essentially of hydraulic calcium silicates, usually containing one or more of the forms of calcium sulfate as an interground addition.
Portland cement kilnA system, including any solid, gaseous or liquid fuel combustion equipment, used to calcine and fuse raw materials, including limestone and clay, to produce Portland cement clinker.
Precalciner cement kilnA Portland cement kiln where the feed to the kiln system is preheated in cyclone chambers and a second burner is used to calcine material in a separate vessel attached to the preheater prior to the final fusion in a kiln that forms clinker.
Preheater cement kilnA Portland cement kiln where the feed to the kiln system is preheated in cyclone chambers prior to the final fusion in a kiln that forms clinker.
System-wideTwo or more Portland cement kilns under the common control of the same owner or operator, or multiple owners, in this Commonwealth.
Authority The provisions of this § 145.142 amended under section 5(a)(1) of the Air Pollution Control Act (35 P.S. § 4005(a)(1)).
Source The provisions of this § 145.142 amended June 18, 2010, effective June 19, 2010, 40 Pa.B. 3346. Immediately preceding text appears at serial page (333589).
Cross References This section cited in 25 Pa. Code § 129.97 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule); and 25 Pa. Code § 129.112 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.