Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 5598 (August 31, 2024).

25 Pa. Code § 277.132. Operation plan.

§ 277.132. Operation plan.

 An application shall contain a description of the construction/demolition waste landfill operations proposed during the life of the facility within the proposed permit area, including, at a minimum, the following:

   (1)  A narrative describing the type and method of construction/demolition waste landfill procedures, procedures for inspection and monitoring of incoming waste, sequence of landfilling activity, type of landfilling activity, proposed engineering techniques and the major equipment to be used under §  277.215 (relating to equipment), using the maps and grids required by §  277.133 (relating to map and grid requirements) as a basis for description.

   (2)  A narrative explaining the method and schedule for construction, operation, modification, use, maintenance and removal of the following components of the proposed facility, unless their retention is proposed for postclosure land use:

     (i)   Dams, embankments, ditches and other impoundments.

     (ii)   Borrow pits, soil storage and handling areas and structures.

     (iii)   Water and air pollution control facilities.

     (iv)   Erosion control facilities.

     (v)   Equipment storage and maintenance buildings, and other buildings.

     (vi)   Access roads.

   (3)  A construction schedule tied to the grid coordinate system required by §  277.133, a site preparation plan and a schedule for disposing of solid waste at the site, including the maximum daily volume or weight of waste that will be received at the facility.

   (4)  An explanation of how the applicant intends to comply with §  277.214 (relating to measurement and inspection of waste).

   (5)  A plan for assuring that solid waste received at the facility is consistent with §  277.201 (relating to basic limitations).

   (6)  The proposed operating hours of the proposed facility. The operating hours include those hours related to construction and other activities related to operation of the facility.

Source

   The provisions of this §  277.132 amended December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685. Immediately preceding text appears at serial pages (226272) to (226273).

Cross References

   This section cited in 25 Pa. Code §  277.131 (relating to basic requirements).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.