PHASE II APPLICATION REQUIREMENTS
GAS MANAGEMENT
§ 277.171. Gas monitoring and recovery plan.
When the decomposition of the construction/demolition waste that is proposed to be disposed at the facility may generate gas, the application shall include a plan sufficient to detect and control gas emanating from the facility. The plan shall include the following:
(1) A plan to monitor and record gas on and off the site, including structures, offsite gas migration and gas accumulation.
(2) Designs for a gas control system, indicating the location and scheduling of construction, and the design of vents, barriers, collection pipes, manifolds or other control measures that will be put in place.
Cross References This section cited in 25 Pa. Code § 277.131 (relating to basic requirements); and 25 Pa. Code § 277.292 (relating to gas control and monitoring).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.