Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 5598 (August 31, 2024).

25 Pa. Code § 88.327. Revegetation: seedbed preparation.

§ 88.327. Revegetation: seedbed preparation.

 (a)  The soil surface shall be prepared by disking or harrowing unless soil conditions or steep slopes prohibit such a practice.

 (b)  When disking or harrowing is not possible, the soil surface shall be scarified by any mechanical method which will loosen the surface material. Scarification shall not be required if seeding is done immediately following final grading when the soil is still loose.

Source

   The provisions of this §  88.327 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382.

Cross References

   This section cited in 25 Pa. Code §  88.290 (relating to vegetation-supporting material: nutrients and soil amendments).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.