§ 89.172. Informational requirements.
(a) An application for a coal preparation activity shall contain:
(1) An erosion and sedimentation control plan under Subchapter A (relating to erosion and sedimentation control).
(2) An operation plan which specifies plans for the construction, operation and maintenance of the preparation plant.
(3) A reclamation plan which specifies plans for the removal of the preparation activities and reclamation of the affected area.
(4) The information requirements of Subchapter E (relating to prime farmlands), if applicable.
(b) An application shall demonstrate that the coal preparation activities will be conducted in compliance with the performance standards of this subchapter. A permit will not be issued unless the Department finds, in writing, that the activity will be conducted in compliance with the performance standards of § 89.173 (relating to performance standards).
Authority The provisions of this § 89.172 amended under the Surface Mining Conservation and Reclamation Act (52 P.S. § § 1396.11396.19a); The Bituminous Mine Subsidence and Land Conservation Act (52 P.S. § § 1406.11406.21); The Clean Streams Law (35 P.S. § § 691.1691.1001); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).
Source The provisions of this § 89.172 adopted June 15, 1990, 20 Pa.B. 3383, effective July 27, 1991, 21 Pa.B. 3316; amended December 15, 1995, effective December 16, 1995, 25 Pa.B. 5821. Immediately preceding text appears at serial page (199277).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.