§ 45.35. Log pond.
(a) The banks of the log pond in the vicinity of the log haul shall be reinforced to prevent caving in and shall be provided with a nonslip surface of cleats, or corrugated or rough abrasive material.
(b) Pike poles used in pond operations shall be equipped with handles of dense ash, hickory, maple, beech or wood of equivalent strength, preferably made from split stock.
(c) Except in the case of artificial ponds five feet or less in depth, each long landing shall be provided with a cork ring-type life preserver with not less than 50 feet of 1/4 inch line attached to it.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.