§ 57.103. Estimate of construction costs.
A utility required under 66 Pa.C.S. § 515(a) (relating to construction cost of electric generating units) to submit an estimate of the construction costs of electric generating units shall file the following information with the Commission as part of that estimate:
(1) An estimate of total costs.
(2) An estimate of the following costs:
(i) The cost and quantity of each category of major equipment, such as switchgear, pumps, diesel generators and the like.
(ii) The cost and quantity of each category of bulk materials, such as concrete, cable and structural steel and the like.
(iii) Manual labor.
(iv) Direct and indirect costs of architect/engineering services.
(v) Direct and indirect costs of subcontracts or other contracts involving major components or systems such as turbines, generators, nuclear steam supply systems, major structures and the like.
(vi) Distributable costs.
Authority The provisions of this § 57.103 issued under Public Utility Code,the Public Utility Code, 66 Pa.C.S. § § 501, 515, 1301 and 1308.
Source The provisions of this § 57.103 adopted January 9, 1988, effective January 10, 1988, 18 Pa.B. 181.
Cross References This section cited in 52 Pa. Code § 53.53 (relating to information to be furnished with proposed general rate increase filings in excess of $1 million); 52 Pa. Code § 57.104 (relating to construction management program); and 52 Pa. Code § 57.105 (relating to construction monitoring program).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.