§ 57.149. Energy conservation and load management.
The Annual Resource Planning Report (ARPR) shall include a detailed description of conservation and load management programs implemented or operational during the past calendar year and all programs which are proposed to be implemented within 1 year following the filing of this report.
(1) A conservation program shall include a method designed to produce a reduction in total annual energy use, regardless of its effect on peak demand.
(2) A load management program shall include a method which will reduce the peak or maximum load or demand, regardless of its effect on total annual energy use.
(3) The program description shall include actual or anticipated results and a breakdown of monetary and personnel resources.
Authority The provisions of this § 57.149 amended under the Public Utility Code, 66 Pa.C.S. § § 501, 524, 1501, 1504 and 2809.
Source The provisions of this § 57.149 amended February 25, 2000, effective February 26, 2000, 30 Pa.B. 1129. Immediately preceding text appears at serial pages (205872) to (205873).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.