§ 59.28. Installation.
(a) Displacement meters. Each public utility shall adopt standard methods for installing meters.
(b) Orifice meters. All orifice meter settings shall be constructed and maintained in accordance with accepted good practice, which is best indicated by the American Gas Association; 1515 Wilson Boulevard; Arlington, Virginia 22209: Orifice Metering of Natural Gas, Gas Measurement Committee Report No. 3, ANSI/API 2530 1978.
(c) Service connection. When connecting the premises of the customer with public utility distribution mains, the public utility shall furnish, install and maintain the service line or connection according to the rules and regulations of its filed tariff.
Authority The provisions of this § 59.28 issued under the Public Utility Code, 66 Pa.C.S. § § 501, 1301, 1304, 1501, 1502 and 1507.
Source The provisions of this § 59.28 amended through September 17, 1982, effective September 18, 1982, 12 Pa.B. 3291. Immediately preceding text appears at serial page (37405).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.