§ 69.204. Financing of nuclear fuel acquisitions.
(a) A utility should have a written policy setting forth economic and other conditions under which different methods of financingleasing or owningnuclear fuel should be utilized.
(b) A utility should perform an economic analysis in conjunction with nuclear fuel financings. The analysis should include a study of financing costs for owning versus leasing nuclear fuel and the impact on the utilitys overall revenue requirements under both alternatives. The method of rate recovery of nuclear fuel costs should not be a primary factor when deciding to own or lease nuclear fuel.
(c) A utility should document the economic analyses required to comply with this section. These documents should be retained by the utility in accordance with the Federal Energy Regulatory Commissions Record Retention Table and made available in the event of Pennsylvania Public Utility Commissions review.
Source The provisions of this § 69.204 adopted March 29, 1991, effective May 30, 1991, 21 Pa.B. 1331.
Cross References This section cited in 52 Pa. Code § 69.201 (relating to general); 52 Pa. Code § 69.205 (relating to purchasing procedures); and 52 Pa. Code § 69.206 (relating to inventory management).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.