Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 5598 (August 31, 2024).

25 Pa. Code § 129.99. Alternative RACT proposal and petition for alternative compliance schedule.

§ 129.99. Alternative RACT proposal and petition for alternative compliance schedule.

 (a)  The owner or operator of an air contamination source subject to §  129.97 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule) located at a major NOx emitting facility or major VOC emitting facility subject to §  129.96 (relating to applicability) that cannot meet the applicable presumptive RACT requirement or RACT emission limitation of §  129.97 may propose an alternative RACT requirement or RACT emission limitation in accordance with subsection (d).

 (b)  The owner or operator of a NOx air contamination source with a potential emission rate equal to or greater than 5.0 tons of NOx per year that is not subject to §  129.97 or § §  129.201—129.205 (relating to additional NOx requirements) located at a major NOx emitting facility subject to §  129.96 shall propose a NOx RACT requirement or RACT emission limitation in accordance with subsection (d).

 (c)  The owner or operator of a VOC air contamination source with a potential emission rate equal to or greater than 2.7 tons of VOC per year that is not subject to §  129.97 located at a major VOC emitting facility subject to §  129.96 shall propose a VOC RACT requirement or RACT emission limitation in accordance with subsection (d).

 (d)  The owner or operator proposing an alternative RACT requirement or RACT emission limitation under subsection (a), (b) or (c) shall:

   (1)  Submit a written RACT proposal in accordance with the procedures in §  129.92(a)(1)—(5), (7)—(10) and (b) (relating to RACT proposal requirements) to the Department or appropriate approved local air pollution control agency as soon as possible but not later than:

     (i)   October 24, 2016, for a source subject to §  129.96(a).

     (ii)   October 24, 2016, or 6 months after the date that the source meets the definition of a major NOx emitting facility or major VOC emitting facility, whichever is later, for a source subject to §  129.96(b).

   (2)  Be in receipt of an approval issued by the Department or appropriate approved local air pollution control agency in writing through a plan approval or operating permit modification for a RACT proposal submitted under paragraph (1)(ii) prior to the installation, modification or change in the operation of the existing air contamination source that will result in the source or facility meeting the definition of a major NOx emitting facility or major VOC emitting facility.

   (3)  Include in the RACT proposal the proposed alternative NOx RACT requirement or RACT emission limitation or VOC RACT requirement or RACT emission limitation developed in accordance with the procedures in §  129.92(a)(1)—(5) and (b).

   (4)  Include in the RACT proposal a schedule for completing implementation of the RACT requirement or RACT emission limitation as soon as possible but not later than:

     (i)   January 1, 2017, for a source subject to §  129.96(a).

     (ii)   January 1, 2017, or 1 year after the date that the source meets the definition of a major NOx emitting facility or major VOC emitting facility, whichever is later, for a source subject to §  129.96(b).

   (5)  Include interim dates in the schedule required under paragraph (4) for the:

     (i)   Issuance of purchase orders.

     (ii)   Start and completion of process, technology and control technology changes.

     (iii)   Completion of compliance testing.

   (6)  Include in the RACT proposal methods for demonstrating compliance and recordkeeping and reporting requirements in accordance with §  129.100 (relating to compliance demonstration and recordkeeping requirements) for each air contamination source included in the RACT proposal.

   (7)  Demonstrate to the satisfaction of the Department or the appropriate approved local air pollution control agency that the proposed requirement or RACT emission limitation is RACT for the air contamination source.

 (e)  The Department or appropriate approved local air pollution control agency will:

   (1)  Review the timely and complete alternative RACT proposal submitted in accordance with subsection (d).

   (2)  Approve the alternative RACT proposal submitted under subsection (d), in writing, if the Department or appropriate approved local air pollution control agency is satisfied that the alternative RACT proposal complies with the requirements of subsection (d) and that the proposed alternative requirement or RACT emission limitation is RACT for the air contamination source.

   (3)  Deny or modify the alternative RACT proposal submitted under subsection (d), in writing, if the proposal does not comply with the requirements of subsection (d).

 (f)  The proposed alternative RACT requirement or RACT emission limitation and the implementation schedule submitted under subsection (d) will be approved, denied or modified by the Department or appropriate approved local air pollution control agency in accordance with subsection (e) in writing through the issuance of a plan approval or operating permit modification prior to the owner or operator implementing the alternative RACT requirement or RACT emission limitation.

 (g)  The emission limit and requirements specified in the plan approval or operating permit issued by the Department or appropriate approved local air pollution control agency under subsection (f) supersede the emission limit and requirements in the existing plan approval or operating permit issued to the owner or operator of the source prior to April 23, 2016, on the date specified in the plan approval or operating permit issued by the Department or appropriate approved local air pollution control agency under subsection (f), except to the extent the existing plan approval or operating permit contains more stringent requirements.

 (h)  The Department will submit each alternative RACT requirement or RACT emission limitation approved under subsection (f) to the Administrator of the EPA for approval as a revision to the SIP. The owner and operator of the facility shall bear the costs of public hearings and notifications, including newspaper notices, required for the SIP submittal.

 (i)  The owner and operator of a facility proposing to comply with the applicable RACT requirement or RACT emission limitation under subsection (a), (b) or (c) through the installation of an air cleaning device may submit a petition, in writing, requesting an alternative compliance schedule in accordance with the following:

   (1)  The written petition requesting an alternative compliance schedule shall be submitted to the Department or appropriate approved local air pollution control agency as soon as possible but not later than:

     (i)   October 24, 2016, for a source subject to §  129.96(a).

     (ii)   October 24, 2016, or 6 months after the date that the source meets the definition of a major NOx emitting facility or major VOC emitting facility, whichever is later, for a source subject to §  129.96(b).

   (2)  The written petition must include:

     (i)   A description, including make, model and location, of each air contamination source subject to a RACT requirement or RACT emission limitation in one or more of subsections (a)—(c).

     (ii)   A description of the proposed air cleaning device to be installed.

     (iii)   A schedule containing proposed interim dates for completing each phase of the required work to install the air cleaning device described in subparagraph (ii).

     (iv)   A proposed interim emission limitation that will be imposed on the affected air contamination source until compliance is achieved with the applicable RACT requirement or RACT emission limitation.

     (v)   A proposed final compliance date that is as soon as possible but not later than 3 years after the approval of the petition by the Department or the appropriate approved local air pollution control agency. If the petition is for the replacement of an existing source, the final compliance date will be determined on a case-by-case basis. The approved petition shall be incorporated in an applicable operating permit or plan approval.

 (j)  The Department or appropriate approved local air pollution control agency will review the timely and complete written petition requesting an alternative compliance schedule submitted in accordance with subsection (i) and approve or deny the petition in writing.

 (k)  The emission limit and requirements specified in the plan approval or operating permit issued by the Department or appropriate approved local air pollution control agency under subsection (j) supersede the emission limit and requirements in the existing plan approval or operating permit issued to the owner or operator of the source prior to April 23, 2016, on the date specified in the plan approval or operating permit issued by the Department or appropriate approved local air pollution control agency under subsection (j), except to the extent the existing plan approval or operating permit contains more stringent requirements.

 (l)  Approval or denial under subsection (j) of the timely and complete petition for an alternative compliance schedule submitted under subsection (i) will be effective on the date the letter of approval or denial of the petition is signed by the authorized representative of the Department or appropriate approved local air pollution control agency.

Authority

   The provisions of this §  129.99 issued under section 5(a)(1) and (8) of the Air Pollution Control Act (35 P.S. §  4005(a)(1) and (8)).

Source

   The provisions of this §  129.99 adopted April 22, 2016, effective April 23, 2016, 46 Pa.B. 2036; amended August 10, 2018, effective August 11, 2018, 48 Pa.B. 4814. Immediately preceding text appears at serial pages (380514) to (380517).

Cross References

   This section cited in 25 Pa. Code §  121.1 (relating to definitions); 25 Pa. Code §  129.96 (relating to applicability); 25 Pa. Code §  129.97 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule); 25 Pa. Code §  129.100 (relating to compliance demonstration and recordkeeping requirements); 25 Pa. Code §  129.112 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule); 25 Pa. Code §  129.114 (relating to alternative RACT proposal and petition for alternative compliance schedule); 25 Pa. Code §  129.121 (relating to general provisions and applicability); and 25 Pa. Code §  29.131 (relating to general provisions and applicability).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.