Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 6234 (September 28, 2024).

61 Pa. Code § 41.7. Pump for conveying water prior to production process.

§ 41.7. Pump for conveying water prior to production process.

 A pump used in conjunction with the conveying of raw river water to a filtration plant where such water is treated prior to use directly in the production of a steel product is not considered to be used directly in a production process.

Source

   The provisions of this §  41.7 adopted September 8, 1972, effective September 9, 1972, 2 Pa.B. 1686.



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.